Dissertation > Excellent graduate degree dissertation topics show
A Study of KPI System Setting up Inside Company D (Under TOLL Mode)
Author: SongZhenLei
Tutor: GaoSong
School: East China University of Science and Technology
Course: Business Administration
Keywords: TOLL mode KPI system TOLL manufacturing KPI performance Management
CLC: F272
Type: Master's thesis
Year: 2012
Downloads: 73
Quote: 0
Read: Download Dissertation
Abstract
|
Accelerated globalization of economy results various relationship of domestic enterprises and international companies after Chinese Economy Open and Revolution. TOLL-Manufacturing occupies a portion of over 55%. It’s an important topic of how the enterprises compose and apply KPI system' dissertation">KPI system under this mode as well as being discussed in present Company Performance Management.This thesis gives a construction of KPI system by analyzing the performance management of company D in recent years. Generally, the thesis is being composed as below--Firstly, the thesis introduces the task, including the content, relating MBA courses and the method and route of research, etc.Secondly, background of relative theories and exact conception of KPI, and how to choose a contractor to execute TOLL, is being introduced. By SWOT & PSET assay, it gives an estimation of international TOLL strategy.The third part is a brief description of KPI management status of the TOLL contractors. By introducing the organization of both companies of TOLL, and based on the inter rela-tionship between KPI construction and organization of the company, the thesis summarizes the issues of KPI assessment system of TOLL projects of company D.Next, the construction of KPI of TOLL performance management is combined with the TOLL contract and details of management under payoff status. Introduction of constructing the KPI system, KPI assessment and execution follows.The fifth part gives an assay of the performance management after establishment of KPI system. Traditional KPI system was found with limitations thus a suggestion of applying balanced score card to KPI system is introduced.Finally, by summarizing the characters of constructing the KPI system of a TOLL project, the thesis concludes the extraction of KPI and construction of KPI system under TOLL mode.
|
Related Dissertations
- Construction of G Bank Yunnan Branch Office of Performance Management System,F272.92
- A Study on Performance Management Indexes of LYG’s Local Taxation Bureau,F812.42
- Study on Performance Management Strategic of Tax Department,F812.42
- The Study of the Performance Management System of Taishan Medical School,G647.2
- Based on the KPI Urban Public Transport Enterprise Performance Management System Applied Research,F572
- The Improving Research of Evaluation and Management in the Grassroots Organizations of Commercial Bank,F832.2
- A Study of Problems and Improvement on Performance Management about Shanghai SW Electrical Equipment Co., Ltd,F426.4
- The Performance Evaluation of SAP Business One for GH Company,F224
- Study on Executive Compensation Incentive System in Chinese Listed Companies on the Basis of Enterprise Value,F832.51
- Research on Performance Management for China Telecom JNC Branch,F626
- Case Study on Performance Appraisal for P Consulting Company,C932.8
- The Analysis and Design of Mobile Telecommunications Service Quality Management System,TN929.5
- Studies Based on the KPI Marketing Achievements Management System,F272.92
- Ownership Structure and Corporate Performance,F276.6;F224
- Galaxy built of Group Human Resources Performance Appraisal System Design and Implementation,F272.92
- Study the Cost Management KPI Indictor System Construction for Company W,F272.92
- J Institute researchers study and design of the performance management system,F426.22
- The Study of Shenyang Newmart Shopping Mall’s Performance Management System,F721
- M Tourism Scenic Performance Management System,F592.6
- The Balanced Scorecard China’s Public Department Performance Management Application,F272
- The Construction of Publicity Cadres of Heilongjiang Province Performance Management Based on the Balanced Scorecard,D261.5
CLC: > Economic > Economic planning and management > Enterprise economy > Enterprise planning and management decision - making
© 2012 www.DissertationTopic.Net Mobile
|