The Study of Construction Quality Risk Management of 500kV Kuwan Substation Project
Author: ChangJin
Tutor: CuiYi;XiaoLiangJia
School: South China University of Technology
Course: Project Management
Keywords: 500kV Kuwan Substation Construction quality Risk management
CLC: F426.61
Type: Master's thesis
Year: 2011
Downloads: 72
Quote: 0
Read: Download Dissertation
Abstract
|
Substation is the facility of transforming and distributing power in power grid. Because of nonuniform energy distributing in china, 500kV is the highest voltage degree in South China.This type of project owns the characters like: high risk,profession,high tech, too many specialties and co-operation, and meanwhile, because of the complexity of geology and environment at station location, the chose of Tec scheme and resource management are both the main factors of quality risk of project.If feed forward control can not be done well,decide-making of project will face too many questions,even more serious disasters and damage. So,to the managers of project, the most important and effective way to decrease the damage is analyzing and controlling the quality risk.500kV substation construction project is the type with the most typical and representative in all power construction projects.It owns the characters like kinds of career men、equipments and complicated environment,at the same time,this kind of project is always the most important type at the rank of country or province ,so in the process of project construction,its interference and the application of various specifications of quality are the important factors in quality risk management. For this reason, the quality risk management of 500kV substation construction project is the result of reciprocity and combination control of various typical factors,having the obvious and huge research value.
|
Related Dissertations
- Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
- Research on Risk Management of Shenyang Yuanda Internal Curtain Wall Project,F426.92
- Risk Management Study of the GZ Paper Co,.LTD Moving and Transformation Project,F426.83
- Research on the Risk Management of Overseas Investment Project,F224
- Foundation Construction of Canton Tower Project Research,TU755
- Alleviate the Financial Dilemma of Small and Medium-sized Enterprises System Design,F276.3
- A Study on Administration and Supervision by District Government for Construction Quality,TU712.3
- The Project Management Research on Test Software Development of EV Company,F426.672
- Risk Management of Customized Development on ERP Financial Module for H Bank’s Customer,F232
- Study on Quality Control of X Company Standard Factory Building Construction Projects,F426.92
- DG Mobile Communications Construction Project Risk Management,F626
- Company F IPD project management application of the implementation process,F426.6
- Automotive Electronic Control R \u0026 D Project Risk Management,F426.63
- Shan Wei drag ERP implementation and control of risk analysis,F270.7;F426.4
- Air conditioning new product development project risk control study,F426.6
- Laser printing equipment transfer project risk management,F416.6
- Businesses / organizations IT multi-project research and application of risk management,F426.6
- Domestic solar companies during the implementation of MES software project risk management research,F426.2
- Xuancheng Postal Savings Bank Microfinance Risk Management Research Project,F832.4
- Hanggang equipment overhaul years Project Management,TF758
- The Management and Control of Computer Virus Response Project Oriented,TP309.5
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|