Abstract


The tower crane (tower crane for short) is the complete weights lifting the main equipment in industrial and civil construction, it has a high working efficiency, the use of a wide range of easy to operate, easy disassembly. In recent years, the rapid development of the construction industry, the development of the tower crane has created unprecedented opportunities for development, but also because of the tower crane safety and frequent accidents presented a serious challenge. To this end, the tower crane running data logger has been extensively studied and applied. However, the data the tower crane recorder recorded mainly for tower machine running load data, such as lifting weights, trolley, heavy lifting height, boom rotary position, wind speed and direction as well as the lifting mechanism, luffing mechanism and the running speed of the rotary structure, and a second acquisition of a number of groups of data, the long-term operation, the extremely large amount of data. These data are needed for the tower body parts of life assessment, but people are more concerned about the internal forces and stress data structure rod change over time. How quickly such a large load data into the structural rod internal forces and stress data both very necessary and imminent. The processing method is usually Loads data into structural stress finite element method. However, the condition of the large quantities of data processing, the existing commercial finite element analysis software has some defects. In view of this, the characteristics of the tower crane logger acquisition data types and tower crane metal structure, Firstly, based on the theory of classical mechanics tower crane structure the rod internal forces and stress, and export its calculation formula to form a tower crane structure rods internal forces and stress calculation library; Then, according to the modular design concept, the completion of the main function module creation and development of the basic functional modules; then use VB language and to combine EXCEL and ACCESS written to bulk load data processing software, and use this software to quickly bulk load data, get a tower crane structural member forces and stress changes over time curve; verify tower crane Quick calculation accuracy and calculation speed processing software developed by case analysis. The calculation practice shows, this rapid processing system has the following main features: the fast processing run data logger acquisition of tower crane tower crane can combine the input data and output data interface docking tower crane life assessment of large sample data provides convenient application, and practical. Established library of structural parameters of the tower crane, the user can select the input according to the structure of the tower crane tower crane structure parameters, quickly build the tower crane model. To quickly handle bulk load data, all member forces and stresses, the user can easily view the internal forces and stress changes over time curve of any bar. Software main interface design sought to close the Window program, user-friendly, easy to operate, accurate calculation, run fast. The software assessment, the life of the tower crane to solve tower crane life prediction data further improve the running of the tower crane safety is important.

Related Dissertations

  1. Global Stability of Telescopic Boom with Impact of Lap between Booms and Friction,TH211.6
  2. Data Collecting and Processing of Multi-Linear-CCD Visual Measuring System,TP274.2
  3. Research and Application of Safety Assessment Method Based on Neural Network,X937
  4. Leak before break (LBB) method in the PWR Pipeline Analysis Application,TL353.11
  5. Node-based intelligent interaction IOT Data Processing,TP391.44
  6. Automatic Calibration System Voltage Monitor,TM933.2
  7. The Designing of HD Vehicle Detection System Based on Fpga,TP391.41
  8. Design and realization of high-speed of the wind tunnel balance calibration software,TP311.52
  9. The Design and Implementation of Soccer Robot for RoboCup Middle Size League,TP242
  10. The Design and Implementation of Level Transmitter Based on Magnetostrictive,TP212
  11. Research on State Diagnosis on Fan Based on Factor Analysis and BP Neural Network,F426.61
  12. Study of Visualized Data Processing System for Computerized Flat Kniting Machine Based on ARM9,TS183
  13. Study of the Performance Improvements about the System of Low-profile Vehicle-borne "Mobile Communication",TN927.2
  14. Design and Implementation of an Embedded RFID Middleware,TP391.44
  15. Research & Application of Data Processing Methods in Operating Stability Test of Hydro Electric Generating Set,TV737
  16. Lightning detection system hardware design,TN202
  17. Microwave drive power and microwave sintering furnace study,TN015
  18. Data Communications Equipment Test System,TN806
  19. Hadoop data center deployment and tracking systems research,TP308
  20. Redundant data processing technology in the rail transit AFC System,U285
  21. Fault Tolerance for MapReduce in the Cloud Environment,TP302.8

CLC: > Industrial Technology > Machinery and Instrument Industry > Lifting machinery and transport machinery > Lifting machinery > Mobile crane > Tower
© 2012 www.DissertationTopic.Net  Mobile