Based on the Critical Chain Method of Jidong Oil Process Control System Engineering Project Schedule Management

Author: ZhaoHui
Tutor: MaTieJu;ZhangFeng
School: East China University of Science and Technology
Course: Project Management
Keywords: project schedule management fieldbus control system theory of constraints critical chain method
CLC: TE35
Type: Master's thesis
Year: 2012
Downloads: 80
Quote: 0
Read: Download Dissertation

Abstract


In recent years, with the rapid development of our country’s economy, such pillar industries as petroleum, petrochemical, chemical, electric power industry have also experienced rapid development. With strong capital and the introduction of new technologies, all walks of businesses rush to build many large projects. Winning these projects can bring both considerable profits and a broad social impact, so many companies are trying to bid for these projects enthusiastically. The process control systems provider in these projects is no exception. Because most projects of the control systems cannot be completed on time and even a single day’s delay in the big project will bring a great loss to the customer, many process control companies focus their attention on the project schedule management.In this context, due to the resource constraints and many uncertainties in the large projects, the traditional project management methods can no longer meet the demand. It is more realistic for us to apply the advanced project management theory to the reality of the process control companies and find a scientific method to manage the project schedule. The new method will be suitable for the process control companies and maybe even for all the industrial companies.This paper combines the characteristics of process control systems projects with specific examples. By analyzing the factors which affect the project schedule and applying the critical chain method to the project schedule management, project manager can take effective controls according to the practical situation and make sure the project is carried out as scheduled.

Related Dissertations

  1. Study on the Progress Management of Campus All-in-one-card Project in Qingdao Shi’s Nan District Primary Schools,G629.2
  2. Applied Research of Critical Chain Management in D Company’s Nuclear Power Equipments Manufacture Project Scheduling Management,F426.61;F224
  3. AFA3G manufacturing localization project schedule management research,F426.61
  4. Dongfeng Fengshen H30 Cross models project scope and schedule management research,F426.471
  5. Heavy ship disposal of assets in the auction method of assessment,F724.59
  6. Research on Multiple Project Schedule Management of Construction Enterprise Based on Critical Chain,F426.92
  7. Research on the Project Schedule Management Based on the Critical Chain,TH186
  8. Research on Project Schedule Management System Based on Critical Chain for Software Cooperative Development,TP311.52
  9. Schedule Management of Multiple Software Projects Based on Critical Chain Method,TP311.52
  10. The Research on Engineering Schedule Management of the Second Phase of Ju Cheng Shi Jia Project,F426.92
  11. Application and Study of Project Management for the Date Center Intergrated System Project of Shenzhen Airport,F562
  12. Time schedule management in the broadcast monitoring platform construction in the applied research,G221
  13. CSS corporate systems integration project schedule management software system design,TP311.52
  14. N City Telecom's broadband channel compliance rate to enhance the progress of the project management,F626
  15. Research of R&D Project Schedule Management Based on PDM for Equipment Manufacturing Enterprise,F426.4
  16. Research on the Scheduling Management of the EPC Project Base on the Earned Value,F284
  17. Study on the Software Project Management of Tax Collecting System,F284
  18. A Study on Schedule Management of Offshore Oil Field Development Engineering Projects,F426.22
  19. Chengfa the overall progress of the relocation project management,F426.92
  20. Online NPC Chongqing Learning Center to establish the overall project planning and implementation,G434
  21. Research on the Schedule Planning of Petroleum Technology Service Project Group,F426.22

CLC: > Industrial Technology > Oil and gas industry > Oil and gas development and mining > Production Engineering