Dissertation > Excellent graduate degree dissertation topics show
Research on Risk Management of Tunnels in Karst Area
Author: ZhangZhiDing
Tutor: ZhouJianChun;LuoLiFeng
School: South China University of Technology
Course: Architecture and Civil Engineering
Keywords: Karst Huilongshan tunnel Risk Management Evaluate
CLC: U455.1
Type: Master's thesis
Year: 2011
Downloads: 59
Quote: 0
Read: Download Dissertation
Abstract
|
Tunnel engineering construction investment , long construction period , construction projects and more complex , construction technology , unforeseen risk factors , the impact on the social environment is a high-risk construction projects . The construction of karst tunnels more hot and difficult tunnel engineering sector , a risk assessment and it is necessary to adopt a scientific and reasonable measures to avoid and very urgent . In this paper, Shao Gan Expressway Huilongshan Tunnel engineering background for risk assessment and risk management of karst tunnel construction , the main contents are as follows : 1 , for domestic and foreign scholars in the the tunnel project risk assessment and management theory and risk assessment in practical engineering applications were reviewed and summed up the problems . 2 summarizes the karst tunnel project risk assessment methods and analysis of their strengths and weaknesses and adapt ; clear the steps of a risk assessment focuses on the implementation of the fuzzy analytic hierarchy process steps ; summed up the tunnel project used risk management strategy and measures. To Shao Gan Expressway Huilongshan tunnel engineering background for Karst Tunnel risk assessment study . Reference railway tunnel risk assessment and management provisional regulations \level all risk factors , risk level , and ultimately come to landslide risk , sudden gushing risk , the risk and the overall risk of the large deformation are three levels of assessment results , risk-based decision - making criteria , drawn should take measures to reduce the risk or transfer risk Conclusion ; 4 , according to Shao Gan Expressway back to the mountain tunnel the results of the risk assessment , proposed landslides risk prevention, treatment , and emergency measures , given specific risk response measures and incident handling plan of karst tunnel Huilongshan adverse geological phenomena monitoring measurement and advanced geological forecast ; simultaneously carried out in accordance with the tunnel informational construction requirements , thus ensuring the safety of the tunnel construction .
|
Related Dissertations
- Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
- GIS of Baoshan City, land and ecological environment vulnerability assessment,X826
- Open pit production accidents studied because of the risk management measures,TD771
- Study on the Variation of Soil Clay Minerals and Influence Factors in Karst Regions under Different Rocky Desertification, Southwest China,X171
- Characteristic of Soil Nutrients of Rhizophere Soil in Different Karst Ecosystems with the Change of Degradation Degree,S158
- Yunnan Nationalities Region Compulsory Education Quality Evaluation,G522.3
- Initial Studies on the Antibacterical Activity in Vitro and the Safety Evaluation of Propolis Extraction,R285
- The Competition Management System of Harbin 24th Winter Universiade 2009’s Risk Management,G812.2
- The Innovative Study Based on the Equity Financing of Forest Management from the View of Sustainable Development,F326.2
- The Correlation Analysis of Individualized Treatment and Disease Progression of Parkinson Disease,R742.5
- Cooperative Learning in Middle School English Teaching in Practice,G633.41
- Explore differences in student evaluation,G40-058.1
- Offshore oil platform construction phase Operational Risk Management Research,F426.22
- Chemical Industrial Park Environmental Risk Management Technology Source,X327
- Internal Control System Construction of University Research,G647
- Based on Spectral Index coverage information Karst Feature Extraction,P237
- Dai Shun Mine Collapse Column 4325 track characteristics and control technology research and development,TD745
- A Construction Project Owner Risk Management Research,F284
- Bearing Capacity of Cast-in-place Piles in the Karst Region of Yichun, Jiangxi,U213.1
- Research on the National Innovation Capacity of China and International Comparison,F224
- Study on Ecosystem Risk Management of Coal Mine Based on Fuzzy Cognitive-map and Stakeholders’ Participation,X322
CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Construction Management
© 2012 www.DissertationTopic.Net Mobile
|