Dissertation > Excellent graduate degree dissertation topics show
Study of Expandable Tubular Well Completion Technology in Tarim Oil Filed
Author: FanXiaoXu
Tutor: ZhangRongJun
School: Xi'an University of Petroleum
Course: Petroleum and Natural Gas
Keywords: Tarim Oilfiled Expandable tubulars Expandable liner hanger Well completion
CLC: TE257
Type: Master's thesis
Year: 2010
Downloads: 170
Quote: 0
Read: Download Dissertation
Abstract
|
Dina 2 gas field is the second biggest gas field found in Tarim. For a long time, the massive research and the experiment is conducted for common well completion in condensate gas reservoir. But there is poor research in expandable tubular well completion. Therefore, the study of using expandable tubular well completion for high pressure gas condensate reservoir in Tarim has great significance not only in theory, but also in practice.As a new technology, the expandable pipe technology is gradually matured. It can solve many complex drilling problems and obviously reduce the cost of well drilling and completion. The principle is running the expandable tube column into the well, then forces it to expand to deform permanently by special hydraulic tool.On the basis of systemic investigation, this paper introduces the expandable tube technology characteristics, and analyzes its field application in Tarim. It is think that Dina 2 gas field is suitable to using expandable tube technology in well completion, and it explores one kind of new thoughts for this gas reservoir to highly effective development.
|
Related Dissertations
- Dynamic construction enterprise project cost management methods and applied research,TU723.3
- Formate drilling fluid system applications,TE254
- Idempotent Completion Preserving and M-V Construction Preserving on Categories,O154
- Research of Drilling and Completion Fluid Technology for Low Porosity and Low Permeability Reservoir in Weizhou Oilfield,TE257.6
- The Research on Screen Pipe Completion Technique with Sand Controlling for Horizontal Well in Bottom Water Drive Viscous Reservoir,TE257
- Prior Choice of Perforating Parameter in Gulongnan Region,TE257.1
- The Influence of S-completions of the Maximal Subgroups on the Structure of Finite Groups,O152.1
- Control Strategies of Distributed Virtual Assembly Training System: Design and Implementation,TJ760
- Path Covering Problem on Tree-like Graph and Its Application,O157.5
- The Structure Design of Well Completion Test String in Deep Water,TE257
- The Optimization of Perforated Completion Technology of Horizontal Well,TE257.1
- Research on Parameters Sensitivity of Horizontal Well Completions Technology,TE257
- Study and Application of Multilateral Well Techniques on the Site of G104,TE243
- Invertibility and Invertible Completion of Unbounded Operator Matrices,O151.21
- Optimization of Horizontal Well Perforation Technology in Dongxin Oilfield,TE257.1
- The Research and Application of Side-tracking Horizontal Well Drilling & Completion Technology of Menggulin Block,TE243
- Thermal stress analysis of horizontal well completion string and Optimization Technology,TE257
- The Research of Dynamic under Balanced Perforating and Application in the Thin and Poor Reservoir of Xingshugang 1-3 Area Oilfield,TE257
- Tracking Research of Multi-branch Horizontal Well Technology at FanZhuang Coalbed Methane Region,TD82
- Designing Technology of Branch Well for Buried Hill Type Formation,TE243
- The Research and Application of Environmentally Friendly Completion Fluid,TE257.6
CLC: > Industrial Technology > Oil and gas industry > Drilling engineering > Wash wells, cementing,completion,reservoir damage and prevention > Completion
© 2012 www.DissertationTopic.Net Mobile
|