Dissertation > Excellent graduate degree dissertation topics show

Study on Structure Optimization of Wall and Curtain Combination Anti-seepage System in Deep Sand and Gravel Layer

Author: XuXiaoDong
Tutor: YanQiao;LiChangCai
School: Three Gorges University
Course: Hydraulic Structure Engineering
Keywords: deep sand and gravel layer wall and curtain combination anti-seepage system multiple objective function
CLC: TV543.8
Type: Master's thesis
Year: 2011
Downloads: 41
Quote: 0
Read: Download Dissertation

Abstract


Recent years,with the development of the hydropower construction in southwestern china,mang hydroelectric engineering has confronted with difficultie of anti-seepage in deep sand and gravel foundation. Successful application of wall and curtain Combination resolved those problem.Becouse of cutoff wall anti-seepage effect better than grouting curtain,it is as far as possible to upper cutoff wall in the design.But the building cost and construction period of cutoff wall are significantly higher than grouting curtain. This design idea not only results in ovre-consevative,but also increasing the construction difficulty and building cost.Therefore,in the time of construction to wall and curtain combination anti-seepage system,it not only meets the anti-seepage and safety ruquirement,but also pays attention to construcion economy and effectiveness.It is very important realistic significance for the study on structure optimization of wall and curtain combination anti-seepage system in deep sand and gravel layer.Based on above existing problems,this paper carrys out the research from following points which around the structural arrangrment size of wall and curtain combination anti-seepage system in deep sand and gravel layer.(1) First, based on the principles and methods of the optimization design ,according to the structural arrangrment size of wall and curtain combination anti-seepage system,aiming at the construcion safety and effectiveness, Optimization model is established using add weight multi-objective function optimization methods and mathematical normalization method. Then, this paper studies the influence law of optimization depth which comes from variation on the parameters, which combined with parameter sensitivity analysis methods to calculate the duration index and weight ratio of parameters. Finally, according to the project, it selects the appropriate calculation parameters to optimization calulation.(2) Setting up three-dimensional finite element model under the the structural optimization arrangrment size of wall and curtain combination anti-seepage system, working out the calculation of seepage, and analysising the seepage stability of the dam and dam foundation.(3)On the basis of optimization calulation analysis and during optimization depth and practical construction depth, finite element method on the numerical simulation and sensitivity analysis method are used to calculate stress and displacement of anti-seepage system in different lap length ,analysing and inducing variation regulation that is lap length of anti-seepage system following arrangrment size of wall and curtain.By the above optimization calulation analysis,as long as optimization model is reasonable and convergence of calulation method is fast and reliable, optimization results keeps rationality. With the increment of the arrangrment size of wall, optimization lap length of anti-seepage system remain linear increase in a certain range.This paper would be provide some instructive suggestions to design and construction of practical engineering,and also giving reference of theory and method to study on structure optimization of wall and curtain combination anti-seepage system in deep sand and gravel layer in future.

Related Dissertations

  1. Study on Optimization of Anti-seepage System for Rockfill Dam on Deep Overburden Layer,TV223.4
  2. Plastic concrete in the dam seepage engineering research,TV543.8
  3. Numerical Simulation Analysis of Earth-Rock Dam and Optimization of Cut-off Wall Due to Secondary Development,TV543.8
  4. Research of Concrete Cut-off Wall in Seepage Prevention Reinforcement of Earth Dam,TV543.8
  5. Finite-element Analysis on Erath-rock Dam Reinforced by Concrete Cutoff Wall,TV543.8
  6. Permeation Analysis of Plastic Concrete and the Controlling-seepage Wall with Plastic Concrete at Dam of ZhaiKou Reservoir,TV543.8
  7. Huanghe Longkou Hydro Project Consolidation Grouting of the Optimization and Application,TV543.5
  8. Study on the Design Parameter and Application Effect of In-depth Agitation Pile Anti-seepage Wall,TV543.8
  9. Seepage prevention scheme of floating Gang,TV543
  10. Shandong Province the Xicheng reservoir seepage design study,TV543
  11. Study on the Anti-seep and Lining Structure of the East Route Canal Project of the South-to-North Water Diversion,TV543
  12. Construction Quality Control and Test Analysis of Long-Tou-Shi Asphalt Concrete Core Project,TV543.8
  13. GIN Grouting Method Was Applied Research in Africa Tekeze Hydrpower Station,TV543
  14. Concrete Cut-off Wall’s Parameter Optimization Design and 3D FEM Analysis of the Dam on Certain Hydropower of Dudu River,TV543.8
  15. Simulation Analysis of Earth-rock Dam Seepage Control and Stress-strain of Dam Body under Seepage Action,TV543
  16. The Application and Rehabilitation Effect Evaluation of Fracture Grouting Technology in Core Dam,TV543
  17. Guizhou Suofengying seepage quality management and control,TV543
  18. Study on Technical Parameters of Curtain Grouting in Deep Holes,TV543.5
  19. Experimental Research on Compound Grouting to Diabase Dikes of the Arch Dam Foundation Treatment Works in Dagangshan Hydropower Station,TV543
  20. Finite Element Analysis of Stress and Deformation for Plastic Concrete Diaphragm Wal,TV543.8
  21. The Research of Seepage Analysis and Seepage Reinforcement Measure on the Homogeneous Earth Dam in Deshenghe Drainage Basin,TV543
  22. Jet grouting technique and its risk dam seepage reinforcement,TV543

CLC: > Industrial Technology > Hydraulic Engineering > Hydraulic engineering construction > A variety of engineering,types > Grouting and cutoff wall project > Wall, as water wall construction
© 2012 www.DissertationTopic.Net  Mobile