Dissertation > Excellent graduate degree dissertation topics show

A Study on Risk Management in Water Source Neighbour Region of the Chang Lake

Author: HuShiQiong
Tutor: JiangTianWen
School: Huazhong University of Science and Technology
Course: Administration
Keywords: Chang Lake Neighbor Region of Water Diversion Risk Management Risk Assessment
CLC: X52
Type: Master's thesis
Year: 2011
Downloads: 41
Quote: 0
Read: Download Dissertation

Abstract


As a water source region, the Chang Lake’s constraint condition of environment and water resource is very strict. The clean tap water’s vulnerability has decided high selectivity the enters, the withdrawal and the daily behavior management to neighbor area’s resident and the industry. Neighbor Region of Chang Lake is ecology sensitive region. The water resources value along the route may appear gradually with Chang lake being chosen as water diversion. Then the pressure and the intensity of latent enters also gradually rises.The risk management in neighbor region of water diversion is to safeguard the Chang Lake’s water quality and volume security. The risk guard objects are kinds of risk which may harm to reservoir’s water quality in the process of neighbor area’s economic development.This thesis based in the Chang Lake, from the consideration of neigbor region’s existing and potential risk source, taken the literature search as the foundation, unified the experts’interviews, constructed risk assessment taking water resources talent and position as core factors. Then proposed the research supposition, and established the analysis model.Through general survey’s way of the risk, this paper unifies Delphi method to gather 661 valid samples. This study used explorer analysis, regression analysis and multiple logistic to analysis the relationship between factors and level of risk and then discusses various factors’function on risk and the risk promote. The findings indicated that pollution made from industry, agriculture and living. The environment consciousness’style of latent clients and the environment type of latent enterprises are the most important factors for latent venture. But some key points like river mouth, boundary and the distance of Reservoir reflected in the general survey process was unable through the quantitative model significance examination. Although the quantitative model is unable to reflect their functions, but the risk management in water source neighbor region of the Chang Lake requests screens their characteristics, and then provide corresponding risk management measures. Finally, this research proposes the risk management measures. First, to establish first-level protection wetland isolation strip to protect water source, second, to supply corresponding control focus on the existing and potential risk, withdraw implements.

Related Dissertations

  1. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  2. Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
  3. Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
  4. Biotypes of Bemisia Tabaci and Resistance Risk Assessment on B Biotype to Pyriproxyfen in XinJiang,S433
  5. The Workout of Atmospheric Environmental Risk Prediction Software,TP311.52
  6. The Research and Construction of Ecological Risk Assessment and Warning Manage System in Typical Oilfield,X826
  7. The Innovative Study Based on the Equity Financing of Forest Management from the View of Sustainable Development,F326.2
  8. Mine water inrush investigation Risk Assessment,TD745
  9. Chemical Industrial Park Environmental Risk Management Technology Source,X327
  10. Software Project Risk Assessment Based on BP Neural Networks,TP183
  11. The CD Commercial Bank IT Risk Management,F832.2
  12. The Reform Direction of Baselii Accord under Subprime Crisis and the Inspiration to China,F832.1
  13. Individual Housing Loan Risk Control,F832.4
  14. Security Risk Assessment and Vulnerability Analysis in Electrical Power System,TM711
  15. Shan Wei drag ERP implementation and control of risk analysis,F270.7;F426.4
  16. Risk assessment and failure data analysis techniques and the application of the acrylonitrile unit,TQ226.61
  17. Risk-based entropy and Markov chain approach MANET Security Risk Assessment and System Implementation,TN929.5
  18. Private enterprises listed overseas Risk Analysis and Countermeasures,F831.51
  19. M Bank Human Resource Management Outsourcing,F272.92
  20. Domestic solar companies during the implementation of MES software project risk management research,F426.2
  21. Lueyang geological disaster monitoring and prevention system construction and the typical group on monitoring and research point of Disaster Effects,P694

CLC: > Environmental science, safety science > Environmental pollution and its prevention > Water pollution and its control
© 2012 www.DissertationTopic.Net  Mobile