Dissertation > Excellent graduate degree dissertation topics show

Experiments and Numerical Simulations on Impact of Shield Tunnel Construction in Loose Geological Environments

Author: ZhangZhen
Tutor: ChenLiHong
School: Beijing Jiaotong University
Course: Geotechnical Engineering
Keywords: shield tunnel numerical simulation reduced triaxial compression setting of the ground
CLC: U455.43
Type: Master's thesis
Year: 2011
Downloads: 80
Quote: 0
Read: Download Dissertation

Abstract


ABSTRACT:Shield method is widely promotion and application in the urban subway construction for its intelligence, fast, safe advantages. However, because shield tunnel needs to control so many factors, it is bound to cause disturbances to surrounding soils, which leads to ground long trapped, formation level displacement and so on. To reduce the harms to construction along pipelines and buildings that caused by shield tunnel, it is necessary to research the ground subsidence caused by the construction.Numerical simulation is one of the effective method, the most current numerical simulation that taken by research workers is based on soil loading principle, and more the mohr-coulomb model. But in fact during the shield tunnel construction, it is a unloading process that the soil is disturbed until stable state. With the method of loading modeling, it will be hard to accurately response ground long do real level.In this article, the Beijing metro line 15th shield project under construction is taken for the engineering background. Base on uninstall soil mechanics methods, proportion, compression, reduced triaxial compression test and conventional triaxial compression test are taken to establish the basic physical mechanics indexes of soil mass stress and strain characteristics to research overlying soil of shield tunnel. In order to establish the differences of c (cohesion),(?) (angle of internal friction), E(elastic modulus),κ(elastic expansion line slope) andλ(normal consolidation line slope) in the two kinds of stress path, fitting the test curses of conventional triaxial compression and triaxial compression by M-C model, D-P model and modified cam-clay model of FLAC 3D. In the meantime, take the conventional triaxial compression test and compression test to establish the value of c、(?)、E, then establish the material parameters under unload path.According to the interval monitoring program and the project progress choose the suitable monitoring section, modeling shield interval through FLAC3D. Use the two groups of testing parameters, established by fitting the loading and unloading curse, modeling the influences of the ground settlement through M-C, D-P, modified cam-clay model.Then compare the modeling results and Construction site measured data.Simulation results show that:the load simulation method does not consider the differences between loading and unloading paths giving a larger value; The calculated subsidence value that considering the differences between the two paths are consistent with the actual measurement data.

Related Dissertations

  1. The Setting Bases of Working Pressure in LNG Systems and Orthogonal Experiment Design of Heat Exchangers,TQ051.5
  2. Study on Springback of High-Strength Steel Stamping,TG386
  3. Numerical Simulation and Experiment on Hydroforming of Cups with Controllable Radial Pressure,TG386
  4. Research on Technology and Mechanism of Joining Cemented Carbide to Carbon Steel,TG454
  5. Numerical Simulation of Film Cooling in Turbine Cascade with Non-Axisymmetric Endwall Method,V231.3
  6. High Speed Aerodynamic Convection and Coupled Heat Transfer of Complicated Bodies,V215.4
  7. The Analysis on Characteris of Vibration Source about Vertical Vibration of Surrounding Environment Induced by Rail Transit,U211.3
  8. Study on the Heat Transfer Characteristics of Particle Cluster in Circulating Fluidized Bed,TK124
  9. Numerical Simulation of SNCR Process of a 600MW Utility Boiler,TK222
  10. Numerical Simulation of Biomass Direct Reburning,TK16
  11. Numerical Simulation on Pulverized Coal Combustion Process in a 670T/H Tangential Firing Furnace,TK224.11
  12. Numerical Simulation on the Combustion Process in the Furnace of a 1000MW Lignite-Fired USC Boiler,TK224.11
  13. Study on Gas-Solid Two-Phase Flow in Spouted Beds,TK173
  14. Experimental Study and Numerical Simulation on Aerodynamic Field of Tangential Bias Swirl Burner,TK223.23
  15. Characteristic Study of Combustion in Central Reverse Flame Chamber,TK223.21
  16. Numerical Simulation and Contrastive Analysis of Labyrinth Seals and Leaf Seals,TK263.2
  17. Numerical Study on Phosphorus Distribution in Water Environment of the Three Gorges Reservoir,X832
  18. The Design and Performance Simulation of External Valve Small Displacement Pump,TE933.3
  19. Analysis of the Impact of Tailings Dam Stability under Seepage Role,TV649
  20. Study on Hydraulic Fracturing of Low Permeability Reservoir,P618.13
  21. Numerical Simulation and Experimental Study of Air-Assisted Sprayer of Orchard,S491

CLC: > Transportation > Road transport > Tunnel project > Tunnel construction > Construction methods > Shield Law ( full- face excavation )