Dissertation > Excellent graduate degree dissertation topics show

1000 Jiaping vanadium ore stope stability analysis

Author: FengYong
Tutor: DengFei
School: Jiangxi University of Technology
Course: Mining engineering
Keywords: Displacement meter catastrophe theory analysis FLAC3D slope stability block chambering method
CLC: TD864
Type: Master's thesis
Year: 2011
Downloads: 41
Quote: 0
Read: Download Dissertation

Abstract


In mining engineering of underground mining belongs to high-risk operations. The stability of slope or not, directly related to mining process in the safety of personnel and equipment. If the different of mining geological structure, occurrence condition are not the same, The treat governance slope stability situation is different too. This thesis Discuss the problem of Slope stability. In Qianjia Ping vanadium deposit Huayuan Shaanxi LLC for the experiment slope of 845m background, After mine field sampling and corresponding rock indoor mechanics experiments, find out the main orebody, mechanical parameters of surrounding rock by classical load after theoretical calculation of ore mining depth known, the minimum width room tiberium spikes and the mechanism analysis theory analysis by mutations in the width of instability recovery ore room.Using ANSYS software is built with mine slope structure experiment two similar between column, the three-dimensional numerical model, different into FLAC3D finite difference software, adopting Moore - coulomb failure criterion calculation. Mainly simulates the recovery, in ore room slope gravity conditions, the stability conditions. Analyze the maximal principal stress and Z direction stress and Z direction displacement of calculation results. Compare with three kinds of parameters of the two models, it is concluded that the cloud is not the same in the column width between similarities and cultures.Establish a suitable for the features of ground pressure monitoring network system and smooth completion of the monitoring system arrangement. The system includes vibration string type borehole stress meter, multipoint displacement plan and convergence plan, combining several methods of comprehensive utilization. In underground complex environment, can understand the stress changes extraction process, guarantee mining safety, and can handle the tiberium spike, roof with existing security firm, ensure mine sustainable development.Hope that this research project has certain instructive significance for operations in Shaanxi Huayuan LLC Qianjiaping vanadium ore mining

Related Dissertations

  1. High-rise building under the jointed rock slope stability studies,TU457
  2. Optimization of Zhenqing two standard K29 450 to K29 900 paragraph excavation slope stability analysis and reinforcement,U418.52
  3. The Study on Rock Mass Stregnth Randomenss and Reliabilityof Slope,TD854.6
  4. Under rainfall infiltration in unsaturated soil slope stability evaluation method of dynamic,TU43
  5. Swelling rock slope deformation and failure modes and prevention measures,TU457
  6. High water on the open pit slope stability study effects,TD804
  7. Zoning Study of Highway Slop Stability in Hunan Province Based on Fuzzy Theory,U416.14
  8. Several key issues research in the design and construction of high and steep slope tall piers,U445.559
  9. Study on the Stability Control for the Rebuilding Roadside Slope and Its Retaining Measurements,U417.1
  10. The Cut Slope Stability Analysis and Governance Research in Tong Ping Highway,U416.14
  11. Study on the Engineering Properties of Loess and the Stability of Loess Slope Along a Railway,U212.22
  12. Anylyse Slope’s Stability of Pump with the Limited Equilibrium Method and the Finite Element Method,TU43
  13. Dali residential ZK86 Pear Creek Road Slope Stability Analysis and Governance,TU43
  14. Soft rock steep slope landslide prediction Method,P642.22
  15. Application and Research of Finite Element Method Among Lue Yang Electric Factory Slope Stability Analysis,TU43
  16. Sensitivity Analysis on Controlling Factors of Water Inrush,TD745
  17. Analysis on the Original Rock Stess and Geomechanics Causes of Rock Burst in the Datai Mine,TD311
  18. FLAC3D Simulation Study on Roof Separation of Roadway under Dynamic Loading and Control,TD353.6
  19. The Slope Stability Analysis of the Second Coal Open-pits in Shengli East of Datang International,TD824.7
  20. Studies of Slope Stability Evaluation Based on the Uncertain Analytic Hierarchy Process,TD854.6
  21. Security and stability analysis of Yongping Copper Mine Dump,TD854.7

CLC: > Industrial Technology > Mining Engineering > Mining > Metal ore mining > Rare and a small amount of metal ore mining
© 2012 www.DissertationTopic.Net  Mobile