Dissertation > Excellent graduate degree dissertation topics show
Construction Project Quality Management Risk Assessment and Early Warning System
Author: FuMingQin
Tutor: FengWeiMin
School: Wuhan University of Science and Technology
Course: Structural Engineering
Keywords: Quality of the project Risk Management Risk Identification Risk Assessment Fuzzy Comprehensive Evaluation BP neural network Risk Warning
CLC: F284
Type: Master's thesis
Year: 2011
Downloads: 173
Quote: 1
Read: Download Dissertation
Abstract
Related Dissertations
- Research on Feature Extraction and Classification of Tongue Shape and Tooth-Marked Tongue in TCM Tongue Diagnosis,TP391.41
- Research on Visual Servo System of Mechanical ARM,TP242.6
- Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
- The Study on Risk Evaluation of BOT Projects in China University,G647
- Municipal tourism land use planning environmental impact assessment,X820.3
- The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
- Study on Taste Characteristic of Taste Peptide Enzymatic Production from Oyster Base on A Neural Network Method,TS254.4
- Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
- Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
- Open pit production accidents studied because of the risk management measures,TD771
- Drought Risk Analysis of Dazhen Irrigated Area,S423
- The Prediction of Potential Suitable Distributions and Risk Assessment of the Alien Invasive Plant Flaveria Bidentis(L.) in China,S451
- Biotypes of Bemisia Tabaci and Resistance Risk Assessment on B Biotype to Pyriproxyfen in XinJiang,S433
- The Research on Evaluation of Living Status Systems of Expressway Relocated People,D523
- The Workout of Atmospheric Environmental Risk Prediction Software,TP311.52
- The Heavy Metals Distribution Characteristics and Risky Evaluations of Farmland Soils-Crops Around Different Types of Chemical Industrial Park,X833
- Studies on Urban Characteristic Culture and Construction of Urban Landscape,S731.2
- An Exploration of the Performance Assessment of the College Counselor,G641
- Comprehensive Evaluation of Safety Production and Optimization of Safety for Yangcheng Coal Mine,X936
- The Research and Construction of Ecological Risk Assessment and Warning Manage System in Typical Oilfield,X826
- Research of Contaminated Site Investigation and Assessment Information System for Soil,X825
CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net Mobile
|