Dissertation > Excellent graduate degree dissertation topics show

The Study of Risk Mangement of Jing-58 Gas-Cap Reservoir Rebuilding Gas Storage

Author: ChenXueLing
Tutor: LiLi;LiuZhongMin
School: Hebei University of Technology
Course: Project Management
Keywords: Underground Natural Gas Storage Risk Management Risk Identification Risk assessment Risk control
CLC: F426.22
Type: Master's thesis
Year: 2008
Downloads: 96
Quote: 0
Read: Download Dissertation

Abstract


Energy security is a necessary condition for the country's rapid and stable development of , in today's world , the importance of the national strategic energy reserves have increased to a new height . Gas storage is a vital part in the natural gas transmission and distribution systems , which provide a stable supply of natural gas to meet the needs of changing ; , it is also an important way to solve the steady production of natural gas and user demand fluctuations contradictory . Beijing 58 gas cap reservoir Underground Gas Storage project is in this context , multi-billion investment in the project , expected a huge economic and social benefits . However, due to the development of underground gas storages by the geological conditions of oil and gas fields , the level of technology and the impact of the political, economic , legal , market , and financial and other factors , with high technical requirements , large investment and system complexity , therefore , of the natural gas underground gas storage development and utilization of risk assessment study , is a prerequisite for the development and utilization of underground natural gas and decision-making . At present, the domestic converted underground natural gas storage project risk analysis also did not form a more comprehensive system of theory and methods , awareness of the risks of the government agencies and the business is still relatively weak . The risk in the the converted gas storage project management must fully understand , and to estimate the capacity of the risk under its own power , the maximum grasp and prevent risks . Correctly identify the various risks that may arise , the basic theory of this paper the use of project risk management in the full study Jing 58 gas cap reservoir Underground Gas Storage project at all stages of development and correct assessment and grading of all risk , focus on the implementation and management of risk , prioritize and come up with measures to prevent risks , and efforts to minimize the risk of loss , so that the project can be successfully implemented to maximize the investment returns .

Related Dissertations

  1. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  2. Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
  3. Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
  4. Open pit production accidents studied because of the risk management measures,TD771
  5. Drought Risk Analysis of Dazhen Irrigated Area,S423
  6. The Prediction of Potential Suitable Distributions and Risk Assessment of the Alien Invasive Plant Flaveria Bidentis(L.) in China,S451
  7. Biotypes of Bemisia Tabaci and Resistance Risk Assessment on B Biotype to Pyriproxyfen in XinJiang,S433
  8. The Workout of Atmospheric Environmental Risk Prediction Software,TP311.52
  9. The Heavy Metals Distribution Characteristics and Risky Evaluations of Farmland Soils-Crops Around Different Types of Chemical Industrial Park,X833
  10. The Competition Management System of Harbin 24th Winter Universiade 2009’s Risk Management,G812.2
  11. Research on Safety Production of Shenzhen Power Supply Bureau,TM08
  12. The Research and Construction of Ecological Risk Assessment and Warning Manage System in Typical Oilfield,X826
  13. Research of Contaminated Site Investigation and Assessment Information System for Soil,X825
  14. Risk Assessment & Spatial Distribution of Soil Nutrients and Heavy Metal in Fenhe Reservoir Surrounding,S158
  15. The Innovative Study Based on the Equity Financing of Forest Management from the View of Sustainable Development,F326.2
  16. Xinzhou Naoyang Event Risk Management,G852.9
  17. Students' Survival Training risk management theory and empirical research,G807.4
  18. Offshore oil platform construction phase Operational Risk Management Research,F426.22
  19. Mine water inrush investigation Risk Assessment,TD745
  20. Chemical Industrial Park Environmental Risk Management Technology Source,X327
  21. BOT financing risk assessment method based on fault tree study,F283

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile