Dissertation > Excellent graduate degree dissertation topics show

Production Process Optimization for OKP Enterprises with Resource-constrained

Author: LiuQing
Tutor: YangWenSheng
School: Nanjing University of Technology and Engineering
Course: Management Science and Engineering
Keywords: resource-constrained OKP production process optimization
CLC: F224
Type: Master's thesis
Year: 2012
Downloads: 40
Quote: 0
Read: Download Dissertation

Abstract


Nowadays, due to the complexity and variability of the market demand, one-of-a-kind production (OKP) become the mainstream production way. One-of-a-kind production is a costumed production mode. Although such production mode can meet the diverse market needs, there also exists many problems, like long production cycle, frequent production changes, many uncertainty factors(like raw material supply delay, equipment failure, staff absence temporary).Because of these uncertainty factors, the real production process of OKP companies often deviates initial production planning, thus results in delivery delay. How to response to these uncontrollable factors flexibly is an important issue for OKP enterprises surviving and developing in the market with fierce competition.This work pays attention to the uncertainty and variability of OKP enterprises. The production process is optimized to reduce the influence of uncontrollable factors that may occur in the production process, and to prevent the production lag caused by these factors.Firstly, this paper presents the measure criterion of the OKP enterprises production planning adaptive capability to uncontrollable factors. That is production schedule planning robustness. In addition, the concept and measure way of this robustness are clearly defined.In single-order case, resource constrained single-order production process optimization model is proposed. Genetic algorithm is applied to solve this problem. The optimal production schedules with optimized duration time are obtained at first. And then we seek the production schedule with optimal robustness from these schedules. The dual optimization production schedule with optimized duration time and robustness is obtained.In multi-orders case, due to resource capacity constraints, it is impossible to ensure all products can be delivered on time. Goal programming is applied to establish resource constrained multi-order production process optimization model. Genetic algorithm is applied to solve this model. We first pursue optimized delivery delay, and then pursue best robustness. The production schedule with optimized tardiness and robustness is obtained.Finally, the examples are presented to test the validation of the model and algorithm.This paper introduces the concept of the production schedule robustness and builds the optimization model. The optimization of production duration time and robustness is carried on in the production planning development. The results have theoretical significance and practical value for OKP companies arranging production with resource constraints to improve market responsiveness and better adapt to the uncertainty in the production process.

Related Dissertations

  1. Research on the Make-up Pen Production Flow Improvement of Chromalyra(tianjin)co.,ltd.,F273
  2. Experimental Study on Combustion Characteristics and Load Expansion of Gasoline HCCI Engine Based on the OKP Technology,TK401
  3. A Research on Resource Scheduling in Multi-order Environment of Job-shop Enterprise Involving Process Preemption,F224
  4. Study on Ferrying Routing Algorithm in Disruption Tolerant Network,TN929.5
  5. The Purchasing Strategy for OKP Enterprises under the Risk of Urgent Orders,F274
  6. The Research of WGTJ Production Process Optimization Base on Lean Production Theory,F273
  7. Renhe Casting Plant Optimization of production process management model,F426.4
  8. Lean Production Institute for Applied Research in the A,F426.5
  9. Armored Vehicle Project Scheduling Method and Development of System Platform,TJ811
  10. Fingerprint Processing in the Resource-Constr-Ained Conditions,TP391.41
  11. Research and Application on Dynamic Resource-Constrained Project Scheduling Problem,TH186
  12. The Research of Air-cooled Chiller Production Process Optimization in Carrier Company,F426.4
  13. Constraint Propagation Based Algorithms for Solving Resource-Constrained Project Scheduling Problems,F270
  14. Study on Multi-Mode Resource-Constrained Duration-Cost Trade-off Problem,TP301.6
  15. Study on Automotive Logistics Resource Constrained Project Management,F252;F426.471
  16. Study on Multi-Mode Resource-Constrained Duration-Cost Trade-off Problem,F284
  17. Research and Application on RCPSP Based on Grey Slope Analysis,F205;F224
  18. ZJ Corporation Ramming Production Management Flow Optimization,F426.4
  19. Application Study on Lean Production in the Barrel Plating Workshop of Xin Li Hua Company,F426.471
  20. X Company Process Optimization Study Based on Lean,F272
  21. Research on Time Synchronization of High Latency Networks,TN915.01

CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods