Dissertation > Excellent graduate degree dissertation topics show

Construction of a Two-span Self-anchored Suspension Bridge with Single Tower

Author: HuangJian
Tutor: ZhangZhe
School: Dalian University of Technology
Course: Bridge and Tunnel Engineering
Keywords: self-anchored suspension bridge construction control main cable configuration hanger tension finite element program stress analysis
CLC: U448.25
Type: Master's thesis
Year: 2009
Downloads: 111
Quote: 2
Read: Download Dissertation

Abstract


Self-anchored suspension bridges are increasingly appreciated by engineers for their merits such as aesthetic appearance and high adaptability to the land form and geology.It has become a more competitive design scheme in middle-,and small-span in cities.Based on two-span self-anchored suspension bridge construction control,this paper studies the theory and method of self-anchored suspension bridge construction control.The main content covers the following aspects:(1) This paper studies the calculation theory and method,including initial elastic theory and finite displacement theory at present.Main cable force figure can be simplified as flexible cable with even load and focus force at the hanger,so main cable is more precise seen as segmental catenary than seen as parabola.Main cable configuration of completed bridge is calculated by segmental catenary theory,and the free length of each main cable,the hanger length,free main cable configuration,the saddle pre-offset are also calculated,and the position of each rope clip is determined.No passage is adopt in main cable construction.So money and time is in advance.The influence of error factors such as cable length change, temperature change to the main cable erection configuration,so the precision is much higher.(2) Hanger of self-anchored suspension bridges must be stretched many times because of many factors such as load-beating of structure.For the complicated nonlinear process of tensioning hangers,considering many nonlinear factors,such as the concrete shrinkage and creep,pre-stressing loss,etc.With making use of the finite element program,the paper studies the construction process,in the pouring part of beam and stretching all the tension,leading to the first pouring of concrete longitudinal compressive stress is too large,how to implement the tension to bridge state.(3) The saddle displacement on the top of the tower,the stress of the tower bottom and the main girder control section,the main cable configuration and the hanger force are observed and measured,and all the data should be analyzed and compared with the calculation data after every tension in order to guide the next tension.So the key problem of system transition in construction control of self-anchored suspension bridge is solved.It has some important reference value to the same bridges.

Related Dissertations

  1. Quanhe Bridge Construction Monitoring & Control,U445.1
  2. A project supervision model of multi-project management company,F284
  3. Research and Application on Preload Construction and Monitoring Technology of Large-span Steel Truss,TU758.11
  4. High-speed railway steel truss girder cable-stayed bridge construction process simulation analysis and feasibility study for construction of the tower beam synchronization,U448.27
  5. Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
  6. The Construction Control Research on Hangers Installation of a Single Tower Self-anchored Suspension Bridge with Large Segment Hoisting Construction,U448.25
  7. Self-anchored suspension bridge with single tower structure parameters of,U448.25
  8. The Dynamic Performance and Seismic Study of Single-Tower Self-Anchored Suspension Bridges with Spatial Cable,U448.25
  9. Key Technology of Structural Design and Construction Control of Tianjin Fumin Bridge,U448.25
  10. Numerical Simulation Analysis of Self-anchored Suspension Bridge’s Load Response,U441.2
  11. Pile Pillar Abutment Parados Stress Analysis and Its Participation to Cap Beam Bending Analysis,U441
  12. Research on the Static Performance of Concrete Self-anchored Suspension Bridge,U448.25
  13. The Impact of Arch Degree of Stiffening Gir-Der Upon the Static and Dynamic Functions of Suspension Bridges,U441.3
  14. The Analysis and Optimization of the Large-Size and Heavy Loading Four-Jaw Chuck,TG751
  15. The Dynamic Simulation Based on Multi-body Dynamics of Fine Blanking Die,TG385.2
  16. Monitor Analysis and Stress Distributing Study on Natural Gas Pipeline under Uneven Settlement,TE973
  17. Research on the Style of Concrete Self-Anchored Suspension Bridge,U448.25
  18. Research of Construction Control Designing, Monitoring and Operation Monitoring of Self Anchorage Suspension Bridge,U448.25
  19. Space Plane Single Tower Cable Suspension Bridge Structural Design of the Main Saddle,U448.25
  20. Co Jiang Changjiang a bridge construction control calculation and control measures of,U445.4
  21. Simulation Analysis of Construction Process and Stress Analysis of the Joint Site of Beam and Arch of Steel Box Tied Arch Bridge,U448.225

CLC: > Transportation > Road transport > Bridges and Culverts > All kinds of bridges > Bridge: Structure > Suspension Bridge