Time Difference Algorithm Based on Frequency Domain in PD Location of Substation

Author: XingLin
Tutor: SunCaiXin
School: Chongqing University
Course: Electrical Engineering
Keywords: substation partial discharge(PD) location TDOA Fourier transformation
CLC: TM507
Type: Master's thesis
Year: 2011
Downloads: 105
Quote: 0
Read: Download Dissertation

Abstract


Substation is an important part of the power system, reliable operation of substation is the basic guarantee of safe and economic operation for the power system. Partial discharge(PD)is one of the important reasons causing power equipment insulation degradation, and it is an important symptom of insulation status in equipment. It is meaningful to detect and locate partial discharge in the whole substation. Based on passive location theory, electrical measurement and electromagnetic analyzing software, the ultra-high frequency(UHF)method used in substation for PD location was studied in this paper.In this paper, the propagation characteristic of electromagnetic wave emitted from PD is studied based on the finite differences time domain method by building a suitable substation model. The results show that the mounting height of Sensor array should 3m higher than that of the bus in real substation, and the power equipment in the substation can lead to amplitude attenuation and time delay of electromagnetic wave, but the impact is very small which hardly influence the PD location in substation. Electromagnetic wave which is emitted from PD occurring in equipment with large energy can transmit to the receiving device through the connectivity gap in the shell, achieving PD location which occurred in the equipment.A new time difference algorithm based on multi-sample signals and frequency domain is proposed in this paper, including its principle and formula. The time delay of multiple sensors was obtained with high precision. This method has a very good anti-interference performance and has proved to be effective to solve the problems of the initial pulse of the PD signal is small and blurry, the time domain method can hardly be applied effectively and will induce rather big errors.Build a three-dimensional coordinate system according to the structure of substation, and start to monitor PD from power equipment in substation received by the experimental platform which was set up early in the substation. First uses transformation of“relevant-shift-superposition”to obtain a statistical signal from a large amount of PD samples received by the sensor array, then adds the time window to extracting the wave top time of statistical signal,by which can improve the similarity between signals of different channels and thus improve the accuracy of time delay .PD location in a substation can be realized with the error in 3 meters by combining the new time difference algorithm which is based on multi-sample signals and frequency domain with genetic algorithm. The research improves the safe level of the substation and ensures the safe operation of power system.

Related Dissertations

  1. Research on Techniques of Information Acquisition and Location in Pavement Roughness Inspection,U416.2
  2. Research on UWB Location Technology Using UWB Radio Signal,TN929.5
  3. The Research of Moving Object Tracking System Based on Embeded Image Process Unit,TP391.41
  4. Substation Integrated Early Warning System and Application,TM76
  5. The Research on Commerce Chain Management in the Country,F721.7
  6. Fault Localization Method for Distribution Network Based on Fault Indicators,TM711
  7. Based on the "Five Zones" Fuzzy Control for Substation Voltage and Reactive Power,TM761.1
  8. Oilfield Grid Control Station System Design and Research,TM734
  9. 200kV Yanzhan Substation Transform the Problem of Computer Protection,TM774
  10. Design of Supervisory and Control System for Xiao Piao 66kV Substation,TM769
  11. Distributed fault recorder modeling and data analysis,TM77
  12. Study on Heat Load Characteristics and Heat Dissipation of Prefabricated Substation,TM63
  13. Research of Wucun Substation Digitization Reconstruction Scheme and Post-project Evaluation,TM63
  14. Research and Application on Fault Location and Online Monitoring System of Distribution Network,TM76
  15. The Analysis on the Feasibility of Intelligent Substation in Hengqin Island,TM76
  16. Based on IEC61850 the Sanxiang Substation Engineering Application,TM76
  17. Substation intelligent monitoring system development,TP311.52
  18. The Research on the Practical Application of Fiber-optical Protection for Transmission Lines,TM773
  19. The Research on Algorithm of Wide Area Protection and Local Substation Coordination Strategy,TM771
  20. Simulative Study on Industry and Location Differences of the Aggregation of Producer Services,F224
  21. EHV transmission network fault location and application software development,TM727

CLC: > Industrial Technology > Electrotechnical > Electrical > General issues > Maintenance,repair