Substation Planning Through Decreasing Initial Redundant Substations in Meshes
Author: WangYuZuo
Tutor: WangZhuDing
School: Chongqing University
Course: Electrical Engineering
Keywords: Substation Planning Initial Substation Site Decreasing Redundant Mesh Distance Weight Quasi-dynamic Planning Method
CLC: TM63
Type: Master's thesis
Year: 2011
Downloads: 41
Quote: 0
Read: Download Dissertation
Abstract
|
Substation planning optimization is an important part of urban distribution network planning. It’s purpose is to determine the size, location and power supply range of potential substations in order to avoid the substation construction blindness and satisfy the future load growth.The research contents and models are determined through the full study of the influence factors and model classification. Various cost coefficients of the objective function are solved by a fitting approach.Considering the initial value sensitivity of k-means clustering algorithm,a new idea is proposed, which can find a good initial clustering value based on the uniform distribution and redundancy of initial values, and it is applied to the substation planning. According to the characteristics of substation allocation, the Decreasing Redundant Mesh algorithm is proposed, which can automatically consider the load distribution to search for initial substation sites. A method for Alternative Location-Allocation (ALA) is employed to find the size and location of a substation. Meanwhile, an approach of distance weights is employed to balance the loading of individual substations in condition of uneven load distribution. In addition, in the whole process of substation planning, various techniques are used effectively to improve the solution speed and quality, such as the inflection point search, changeable step mechanism and limited supply range.A Quasi-dynamic Planning method is used to solve the issue of multi-stage substation planning. According to the size of a power grid, two different strategies are adopted. When a power grid is small, an exhaustive method is used considering the optimal number of substations. When a power grid is large, a method of extrapolation is employed considering the load fitness.The proposed algorithm of the substation planning optimization is applied to the actual examples with 275 loads and 3761 loads. The results show that the proposed method is very effective in calculating precision and speed for solving substation planning optimization problem.
|
Related Dissertations
- Traffic Tax Reformation Model Research in China,F812.42
- Research on Substation Planning and Feeder Sectionalizing for the Oilfield Distribution Network,TM715
- Research on Range-based Localization Algorithm of Wireless Wensor Networks,TP212.9
- Study on Technology of Localization for Wireless Sensor Networks,TP212.9
- Study of Substation Planning Based on Intelligent Method,TM63
- On Target Tracking in Wireless Sensor Network,TN929.5
- The Research of Distribution Power Network Planning in Machong of Dongguan,TM715
- The Study of Algorithm of BP Neural Network,TP183
- Study of Intelligent Optimization Algorithms and Its Application in Power Network Planning,TM715
- The Electric Distribution Network Planning for Foshan 2009-2013,TM715
- The Research on County Mid-Low Voltage Distribution Network Plan,TM715
- Plan and Design for Xianghu New District 110KV Electricity Grid,TM715
- Study of Medium Voltage Distribution Network Planning,TM715
- Research on Substation Planning Based on Particle Swarm of Culture Algorithm,TM63
- Study on Heat Load Characteristics and Heat Dissipation of Prefabricated Substation,TM63
- Research of Wucun Substation Digitization Reconstruction Scheme and Post-project Evaluation,TM63
- Research on Renovation of Monitoring System in 500kV LuoDong Substation,TM63
- Yunlong County immigrant supporting projects 35kV substation back the old state system design and implementation,TM63;TM76
- Research of Substation Integrated Automation Monitoring System,TM63
- Study on the Green Substation Construction of Zhaoqing Power Grid,TM63
- Study on Dou Men Centralized Control Station Construct Project,TM63
- Study of Centralized Protection Based on Digital Substation,TM63
CLC: > Industrial Technology > Electrotechnical > Power generation, power plants > Substation
© 2012 www.DissertationTopic.Net Mobile
|