Dissertation > Excellent graduate degree dissertation topics show

Concrete-filled Steel Tubular Arch Bridge Construction Boom Tension Control Analysis and Optimization

Author: YangMaoZhao
Tutor: HuQingAn
School: Chang'an University
Course: Bridge and Tunnel Engineering
Keywords: CFST Arch Bridge Construction Monitoring Finite element simulation analysis Tensile force optimization Time frame drop method
CLC: U445.4
Type: Master's thesis
Year: 2009
Downloads: 208
Quote: 4
Read: Download Dissertation

Abstract


The arch bridge is an ancient bridge type , has a glorious history in the history of China 's bridge . CFST arch bridge is applied on the basis of the ancient arch bridge concreting new technology in the steel pipe developed a new type of arch bridge , along with contemporary large - span bridges built , and more and more attention on bridge aesthetics , various span CFST tied arch bridge , especially some of the complex structure of the profiled arch bridge arch bridge built are required throughout the construction process of monitoring and control to ensure the safety of the construction , smooth . CFST Arch Bridge construction technology With the development of the times , has also been considerable development, several construction methods commonly used features of a brief introduction , content , method , and its importance , and construction monitoring related elaboration. Huzhou, Zhejiang Anji after the river arch bridge construction monitoring and engineering background , with a large-scale general-purpose finite element software ANSYS finite element model of the bridge construction stage analysis calculation . Arch bridge suspender Tied force tension adjustment as the main line of this article , a rigid support beam method , the rigid boom law , once off the the frames method three methods from different angles, a comparative analysis of the optimal adjustment of the tensile force , according to the results and Angelina after Creek arch Bridge 's actual situation , this paper, once off the shelf method can meet the design and construction requirements ; then once off the frame of the order carried the discussion and come to a from both ends to the middle of the frame drop sequence ; Finally Angelina after River arch Bridge hanging rod tension compared in order to calculate whether both ends to the middle of the tension sequence or in the middle to both ends of the symmetrical tension sequence were obtained satisfactory results . Finally , the time off the frame method to calculate the results of a comparative analysis of the measured data of the on-site monitoring , can be seen from the comparison of the results of the monitor to achieve the desired effect . A frame drop method used for the same type of bridge construction control a draw .

Related Dissertations

  1. The Construction Monitoring and Deformation Control and Analysis of the Box Culvert Jacking of the YouQuan Road Through the Hukun Railway,U449.5
  2. Optimal Design of Suspender Replacement in Concrete Filled Steel Tubulur Arch Bridge,U448.22
  3. High - pier long-span continuous rigid frame bridge construction linear control technology research,U445.4
  4. Research on the Damping Performance of Tandem Vibratory Rollers,U448.22
  5. Analysis of the Influence of Lateral Brace on the Seismic Response of Concrete-Filled Steel Tube Arch Bridge,U441.3
  6. The Construction Control for PC Continuous Beam Bridge,U445.4
  7. Static and Dynamical Characteristic Analysis and Experimental Investigation on Large Span Half-through CFST Arch Bridges,U441.3
  8. Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
  9. Several Key Technology Concrete-filled Steel Tube Arch Bridge,U448.22
  10. Deteriorations Analysis and Strenthning Study for Concrete-Filled Steel Tubular Arch Bridge,U445.7
  11. Concrete-filled Steel Tubular Basket-handling Arch Bridge Vertical Swivel Construction Control Simulation Analysis,U445.465
  12. A Technique Research on Maintaining the Foundationpit of the Large Passenger Railway Station,U231.3
  13. Numerical Simulation and Deformation Control of Deep Foundation Pit Support of the Experimental Building in Northeastern University at Qinhuangdao,TU753
  14. Research on Application of Two Different Lengths of PVDs in Vacuum Preloading Method,TU472.33
  15. Construction Monitoring and Control of Tied-arch Bridge with Flying Swallow,U448.225
  16. Research on Monitor and Analysis of Inclined Settlement Integral Jack-Up Rectification for Xiang King’s Ancien Wall,TU746.3
  17. Analysis of Structure Simulation for Long-span Prestressed Concrete Continuous Rigid-frame Bridge,U448.23
  18. Study and Practice on Monitoring Technology of Cantilever Construction for the Songhuajiang Continuous Box Girder Bridge,U445.466
  19. Research of Construction Monitoring Technology of Basket-type Concrete Filled Steel Tube Arch Bridge,U445.4
  20. The Construction Monitoring and Controlling Cable-stayed Bridge with Inclined and Arched Tower,U448.27
  21. Wind-induced Response Analysis of Long-Span Concrete-Filled Steel Tube Arch Bridge,U441.3

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > Construction Technology