Dissertation > Excellent graduate degree dissertation topics show
The Cut Slope Stability Analysis and Governance Research in Tong Ping Highway
Author: XiangJuan
Tutor: HuYiFu
School: Central South University
Course: Geotechnical Engineering
Keywords: Slope Stability Analysis Safety factor Sliding surface FLAC3D Prevention and cure Prestressed Anchor
CLC: U416.14
Type: Master's thesis
Year: 2011
Downloads: 64
Quote: 1
Read: Download Dissertation
Abstract
|
Recent years, with the steady development of the national economy , more and more attention to the the mountain infrastructure construction , including the construction of high-grade highways is a top priority , the construction of a high-grade highways in the mountains is a very difficult task . Highway slope stability and protection control measures are reasonable issues that must be considered in the road design, construction and operation . Therefore, a reasonable evaluation of the stability and selection of suitable protective governance programs is essential . Slope deformation and instability may not only cause serious traffic accidents , but also causing huge loss of life and property of the people around . The prevention and treatment of slope failure is still a very difficult task , slope stability analysis and control techniques to conduct in-depth studies of important significance . In order to meet the needs of China 's rapid development of mountain infrastructure , for example, Hunan Province through flat highway tenders seventh K38 300-K38 360 High Cutting weathered slate slope , slope stability and protection design preliminary exploration. The main contents are as follows: ( 1) conduct a study on slope stability analysis method and the advantages and disadvantages of the common slope governance and applicable conditions ; (2) K38 300-K38 360 - slope stability limit equilibrium method sexual calculated using FLAC3D carried out in this the slope displacement field, stress field , and the plastic deformation zone simulation, and the safety factor obtained by the two methods , the shape of the slip plane , slip surfaces were two analytical methods , mutual authentication 's credibility ; ( 3 ) to consider the impact of rainfall , the the FLAC3D software on the slope stability analysis and safety factor ; (4) according to the results , on the slope ANCHORING design ; ( 5) slope prestressed anchor cable , using the the FLAC3D software for numerical simulation of slope prestressed anchor cable . Compare the safety factor of the slope around the prestressed anchor cable , the slope internal displacement and shear strain increment .
|
Related Dissertations
- Coal miners and practice unsafe behavior measurement,X936
- Optimization of Zhenqing two standard K29 450 to K29 900 paragraph excavation slope stability analysis and reinforcement,U418.52
- Ad hoc networks are based on projection pursuit wormhole detection mechanism,TN929.5
- A typical garden soil heavy metal Fujian Situation and Control Measures,X53
- Our legal system of air pollution control,D922.68
- Dailing District, Yichun City, the main pests ( Dendrolimus ) Occurrence and Prevention Research,S763.421
- Commercial Bribery Crime,D924.392
- Iron City throwing rice technology and weed control efficacy study,S451
- Liaoning Province, rice planthopper occurrence and chemical control techniques,S435.112.3
- Dali residential ZK86 Pear Creek Road Slope Stability Analysis and Governance,TU43
- Soft rock steep slope landslide prediction Method,P642.22
- Strength Reduction Finite Element Analysis of Soil Slope Stability,TU43
- Research on Pile-Anchor-Soil Interaction of the Anti-slide Pile with Pre-stressed Anchor Cables,P642.22
- The Safety Management and Emergency Plan in Sudan Oil Field,F426.22
- Sensitivity Analysis on Controlling Factors of Water Inrush,TD745
- Analysis on the Original Rock Stess and Geomechanics Causes of Rock Burst in the Datai Mine,TD311
- FLAC3D Simulation Study on Roof Separation of Roadway under Dynamic Loading and Control,TD353.6
- The Slope Stability Analysis of the Second Coal Open-pits in Shengli East of Datang International,TD824.7
- Study of Mining Roadway of Pre-Stressed Yield and Shared Bolt Support,TD353.6
- Based on FLAC~3D Numerical Calculation of the Composite Pit Retaining System with Anchorage Pile and Composite Soil-nailing,TU753
CLC: > Transportation > Road transport > Road works > Roadbed, pavement engineering > Subgrade > Slope
© 2012 www.DissertationTopic.Net Mobile
|