Beijing-Shanghai high-speed railway 96m under the experimental study of steel box tied arch bridge Deck

Author: YinXueZuo
Tutor: GuoXiangRong
School: Central South University
Course: Civil Engineering
Keywords: steel box through tied-arch bridge high-speed railway Finite element scale model experimental research
CLC: U446.1
Type: Master's thesis
Year: 2011
Downloads: 64
Quote: 0
Read: Download Dissertation

Abstract


Steel box through tied-arch bridge possesses many special characteristics, such as low construction height, economic and fine outlook, excellent crossover capability and so on. Because of the lack of various specifications and other documents,a number of problems of the structure system, design and construction of steel box through tied-arch bridge remain to be solved. And there is less application on high-speed railways. Taking Beijing-shanghai high-speed railway steel box through tied-arch bridge bridge as the project background, this paper establishes the space analysis model of the bridge to simulate the static characteristics analysis of whole bridge. Based on the integral analysis, the scale model has been designed and the model experiment has been done. The test results is useful to the analysis of the bridge. The works finished in the paper are as follows:1. The spatial analysis model of entire bridge structure is set up through large-scale finite element software in this paper, based on the model, simulated calculation and analysis of mechanical characteristics of whole bridge under different testing load working condition are finished;2. The 1:6 scale model of the bridge is designed and made based on the conformity principle, and loading scheme and testing contents are studied as well;3. After loading tests on model under nine different operating conditions,the values of experiments have been gained,and the experimental results agree well with the FEA results. The results show that: overall stress level of structure is not high,structure is designed rationally and can bear load well and safely. Replacing wire sling can be done when bridge opens to traffic;4. Based on the comparison between theoretical calculation and test results, the states of stresses when the bridge opens to traffic are analyzed in this paper. The results show that:the actual bridge design can meet the requirements and the structure has enough safety storage.The design is feasible.

Related Dissertations

  1. The Realization of Coal Liquefaction in the Continum Model System and the Experimental Research of Coal Liquefaction,TQ529.1
  2. Research on the Mainframe System of Powder Mixed EDM and the Craft Experiment,TG661
  3. EDM Electrode Wear Mechanism and Control Research,TG661
  4. Research on the Structure and Characteristics of Permanent Magnetic Coupling,TH139
  5. Finite Element Analysis and Structure Optimal Design for Combined Seal at Normal Temperature and Low Temperature,TH136
  6. Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
  7. Simplified Analysis of Semi-Rigid Steel Frames under Vertical Loading,TU391
  8. Based on Nonliner Finite Element Analysis of the Infilled Wall Frame Structure,TU323.5
  9. Stability Analysis of Roller Compacted Concrete Gravity Dam Based on Time-history Method,TV642.2
  10. Study on the Design and Biomechanical Behaviors of Individualized Artificial Knee Joint,R318.1
  11. Outward Bound to the introduction of the experimental study of junior high school students sunshine sports,G633.96
  12. Design of Testing Equipment for Electronic Products,TN06
  13. S-lay Installation Analysis for Deepwater Pipeline,TE973
  14. Research on the Revenue Distribution of PPP Mode about High-speed Railway Project,F283
  15. Research on Intelligent Aerial Bomb for Forest Fire Fighting,S762
  16. Multi-pin Internal Fixation of Calcaneal Fractures in Finite Element Analysis,R687.3
  17. The Analysis and Comparison of Adjacent Segment Degeneration of the Finite Element Caused by Three Posterior Lumbar Fusion Style,R687.3
  18. The Establishment and Preliminary Application of the Three-dimensional Finite Element Model of Ankle Joint,R687.3
  19. Research on Gas Recovery and Utilization Technology in Mine Return Current,TD712
  20. Airborne radar antenna pedestal rapid design systems research and development,TN959.73
  21. Sham hose drum drive means and hydraulic system of the structure,TE973

CLC: > Transportation > Road transport > Bridges and Culverts > Bridge test observations with the test > Bridge test equipment
© 2012 www.DissertationTopic.Net  Mobile