Dissertation > Excellent graduate degree dissertation topics show
Steel Sheet Pile Cofferdam Construction Technology in Winter
Author: TanBin
Tutor: HuDaLin
School: Chang'an University
Course: Architecture and Civil Engineering
Keywords: Cold regions Water Steel sheet pile cofferdam
CLC: U445.556
Type: Master's thesis
Year: 2011
Downloads: 42
Quote: 0
Read: Download Dissertation
Abstract
|
The steel sheet pile cofferdam underwater pile cap , body construction is the most common form of the waterproof cofferdam the underwater piers ( Taiwan ) , both as the template of the back cover of concrete can and sealing concrete waterproofing role . The steel sheet pile can be classified in accordance with the cross-sectional form , including flat steel sheet pile , groove -shaped steel sheet pile and z - shaped steel sheet piles , section size and chain type vary . Essentially, from the steel sheet pile is the one with a locking steel . Frequently used in the construction of the British production of natural raw steel sheet pile , U.S. production of Lackawanna steel sheet pile the German production Larsen steel sheet pile , Nippon Steel Corporation produced a club -type steel sheet pile . The advantages of using steel sheet pile cofferdam construction is mainly reflected in the following aspects : First, the high strength steel sheet pile , into the hard soil ; deep pile cap , pier ( Taiwan ) body construction , and a support structure formed integrally become an enclosure cage . Third , the waterproof performance is good , especially in the clay layer deep water riverbed when the bridge foundation construction , also can not carry out underwater operations . Fourth, a diverse combination of the cross-sectional shape , inserted to play pile pulling easier recovery can turnover reuse . Domestic and foreign steel sheet pile cofferdam technology applications is very mature , but the steel sheet pile cofferdam winter construction technology is still in its infancy , no molding reported . Harbin the Matsuura Bridge main tower cap foundation is located Songhua river in underwater , is to ensure that the scheduled opening of the cap construction is completed in the winter , and the Order of the station at a depth of about 5m river frozen layer 1m winter water steel sheet pile cofferdam and back cover the successful application of the concrete pouring construction program on time , the main tower cap , the bridge is scheduled for completion win a fighter . The construction of the main tower of the main bridge in Harbin Matsuura instance , research on cold winter water steel sheet pile cofferdam and underwater concrete back cover construction .
|
Related Dissertations
- Temporal and Spatial Variation of Methane Emission from Urban Lake and Its Relationship with the Hydrology-water Quality,X524
- Clinical study of Xu heart,such as academic thought and clinical experience and Yiqi Huoxue,Xiefei Diuresis treatment,congestive heart failure,R259
- Study on Application of Non-phosphate Additive in Frozen Penaeus Vannamei and Mechanism of Water-holding,TS254.4
- Regional Water Environment Pressure Zoning Based on GIS,X321
- Research on Anaerobic Fermentation Processing Technology of Dead Tilapia,TS254.4
- Study on Mechanism of Seawater Pearl Dyeing and Optimization of Dyeing Technology,TS933.23
- The Comprehensive Evaluation of Flue-cured Tobacco Origin Place Environment and Tobacco Leaf of Fangxian,S572
- Effect of Water and Nitrogen Coupling Using on Soil Physical and Chemical Properties in Tobacco Areas and the Yield and Quality of Fule-cured Tobacco in Yibin,S572
- The Study on R-M Instability of the Material Interface in Gas-water Compressible Flow,O359.1
- Effects of Water Hyacinth on Zooplankton Community and Some Species’ Genetic Structure,X174
- Responses of Three Polygonaceae Species to Water Stresses and Pollutants Exposures,Q945.78
- Responses of Alocasia macrorrhiza to Different Water Stresses and Pollutants Exposures,X52
- The Application of Eggshell Membrane for Solid-phase Extraction and the Determination of Trace Metal Elements in Environment Water,X832
- Research on the Interface Modification of Epoxy Resin/Metallic Substrates and Epoxy Resin/Pigment,TQ630.1
- Of water pollutant discharge permit system to study,X321
- Spatial Analysis and Pollution Evaluation about Water Environment Actuality of Rural Surface Water in Typical Regions of Jiangsu Province,S271
- A Study on Building Remote Sensing Retrieval System for Countryside Water-Body Quality Based on ArcGIS Server,S127
- Research on Evaluation System of Irrigation Area Drought,S423
- Drip Irrigation Control System Based on Pulse Width Modulation (PWM),S152.7
- Under Environment History Angle of View Traditiao Farmland Water Conservancy Constructino Research,S274
- The Effects of Water and Fertilizer Coupling on Growth and Yield in Semi-winterness Wheat,S512.1
CLC: > Transportation > Road transport > Bridges and Culverts > Bridge Construction > The works > Foundation engineering > Cofferdam , the cofferdam method , Pit support
© 2012 www.DissertationTopic.Net Mobile
|