Abstract


In order to use more effecient resources,the pattern of engineering subcontract will be more used in the international construction market,it is suitable for the large-scale construction project especially,including hydropower project construction. At present,the execution of the Subcontract Works in hydroelectric project has already become a kind of engineering construction pattern , the subcontract management is requisite to modern enterprise ,which will influence the image and benefit of this enterprise immediately. In a word :How to perform the subcontract management work well,play advantage the execution of the subcontract Works to the utmost extent,and mitigate risks in the the execution of the subcontract Works as far as possible,will be the the core of competing in hydropower project construction market in the future. Our country’s water conservation water and electricity“the start from study”,through this unceasing explorations,causes the engineering subcontract management have been perfected day by day by the continuous exploration of hydraulic and hydrelectric construction industry in more than 20 years since they learned Lu Buge’s experiences .Although the engineering subcontract management develops very fast in our country,and also has made many magnificent progresses,but there are loopholes of management in work process of hydropower project,which makes the construction quality,the progress,and the cost sell at a discount greatly,and has caused a lot of potential safety hazard.In order to solve these problems,all the hydroelectric construction projects are groping and discussing ceaselessly,and have summarized many good means. At present,subcontract management of hydroelectric project in our country is also at the exploration stage.Analytic hierarchy process is a decision-making of many objects method which combines methods of quantitative analysis and analysis. This method is also used in engineering project management frequently,which can elect the project plan,therefore it can be used for the subcontract plan election of the hydroelectric project.This article unifies the status of hydroelectric subcontract management ,find and analyze,problems through the engineering example,and summarize the reasonable and effective managerial approach.Then explores organizational structure fundamental mode of owner project management at the construction stage in the large-scale hydroelectric project.And discuss the hydroelectric subcontract management in cost control,quality control,progress control, contract management,etc. This article proposes the analytic hierarchy process to elect the subcontract plan of the hydroelectric project ,and use it in the subcontract plan election of xiaowang hydropower station,make the theory rich and perfect in reality.

Related Dissertations

  1. Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
  2. Research on Index System and Evaluation of University Office Greening,G647
  3. Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
  4. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  5. Research and Design of One Kind of Paper’s QCS That Based on Embedded System,TP368.1
  6. The Research on Evaluation Method of Highway Ecosystem Healthy,X826
  7. Prospecting and evaluation of the initial stage of the value of the elements of the analytic hierarchy process and fuzzy comprehensive evaluation model,F426.1
  8. A Comprehensive Evaluation of Heritage Trees,S788
  9. JF company \,F426.72
  10. Study on the Model of Knowledge Service in Digital Archives,G270.7
  11. Research on Capital Management in Current Chinese Universities,G647.5
  12. Research on Evaluation of Coal Enterprise Energy-Saving Mechanism,F206
  13. Research on Business Model of Online Team Buying Based on Analytic Hierarchy Process,F713.36
  14. The enterprise competitors evaluation system based on fuzzy comprehensive analysis,F272
  15. The Comprehensive Performance Evaluation and Application Research of the Core Enterprise in Green Supply Chain,F205;F224
  16. Micro- regional communications industry under the Business Hall siting Comprehensive Evaluation and Empirical Research,F224
  17. Research of Motivation Scheme Based on Cost Control,F272.92
  18. Study on Competition and Cooperation between Qingdao Port and Rizhao Port,F552
  19. Research CMLIP project asphalt pavement construction quality and risk control,U415.1
  20. Design and Implementation of the Dinggang Internship Evaluation System in Higher Vocational Colleges Based on Analytic Hierarchy Process,TP311.52
  21. The Financing Tools Selecting Research in Technology Enterprises and Financial Market Combination,F832.5;F224

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile