Study on Post-construction Settlement of New-built Sea Embankment after Tunnelling
Author: JiangMin
Tutor: ChenYunMin;BianXueCheng
School: Zhejiang University
Course: Geotechnical Engineering
Keywords: Marine soft soil Soft soil structural Settlement Hyperstatic pore water pressure Situ Monitoring Shield Longitudinal deformation
CLC: U656.2
Type: Master's thesis
Year: 2010
Downloads: 97
Quote: 1
Read: Download Dissertation
Abstract
|
Settlement and deformation of marine soft soil under the heap loads often is a key link in the dike construction and reclamation from the sea land reclamation and other major projects . In order to study the sea soft soil deformation characteristics , in the experiments of the indoor unit on the basis of improved soft soil model by the modified Cam-Clay joined the inherent structural characteristics of marine soft soil . Combined with the actual project , establish the numerical analysis model of large area uniform the heap load and new seawall uneven loads sea the soft soil long-term settlement and the excess pore water pressure dissipation characteristics , the analysis consider the shaft foundation treatment and seawall filling process . By comparison with in situ monitoring data reflect the seawall below the factory area backfill at foundation settlement and lateral deformation of the model simulation , at the same time consider the foundation at different depths in the filling process Office of excess pore water pressure accumulation and dissipation processes . New seawall marine soft soil generally larger work after long-term settlement , followed by the tunnel boring Shield Tunnel longitudinal deformation cause uneven settlement seawall larger work , seriously jeopardize the safe operation of the tunnel . How do you measure calculated in the case of soft soil tunnel safety critical engineering problems . Of the shield construction seawall settlement measured data conducted in-depth analysis , and key tunnel cross-section subsidence in situ monitoring . Settlement distribution obtained at the tunnel , curve fitting obtained tunnels curvature ; equivalent continuous model to calculate the longitudinal stiffness of shield segment , by the stress analysis to find out the tunnel curvature and deformation , cracks relationship analysis of the stress state of the tunnel , foundation treatment recommendations to solve critical engineering problems .
|
Related Dissertations
- A Study on Several Management Questions of BEIEC’s Restructuring,F426.92
- The Research of Intangible Cultural Heritage under the Shield Dance of Yunghsin Vision Status and Development Strategies,G852
- Positioned in the emerging city museum Thinking,G261
- Mohist Thought of Military Science,E092
- On diversified civil disputes settlement mechanism,D926
- A Study of the Legislative Improvement of Multiplex Dispute Settlement Mechanism,D926
- On of the WTO dispute settlement mechanism,D996.1
- Response of the Capsule Production and Spore Germination of Sphagnum Species in Hani Peatland to Environmental Changes,Q945
- About the Judicial Reform of Labor Dispute Settlement System,D922.5
- On the Settlement Mechanism of Right Conflicts in Title Retention Extension,D923
- The Surrounding Rock Monitoring and Finite Element Simulation of Subway Tunnel,U455.43
- The Design and Implementation of the settlement center accounting system based on C / S mode,TP311.52
- Study on the Buildings Deformation Around Expansive Soil Foundation Pit,TU443
- Prediction on Ground Settlements Due to Metro Tunnels Construction,U456.31
- Research of Bagua Village, Xiangang Town Gaoyao City,K928.5
- Causes and Morphological Characteristics of the "Comb" Type Settlement of Eighteenth-line Village in Wenchang,TU981
- Research on the Informal Street Space of Spontaneous Settlement of Hanzheng Street in Wuhan,TU984.113
- Study on Construction Disturbance of Partition Piles for Surrounding Soil,TU473.1
- Research on the Sustainable Development of Settlement Built Environment for Rural Tourism in Xian Ning,TU982.29
- The South China Sea Dispute and Settlement on the Perspective of International Law,D993.5
- Dynamic construction enterprise project cost management methods and applied research,TU723.3
CLC: > Transportation > Waterway transport > Port projects > Port of hydraulic structures > Outside the embankment
© 2012 www.DissertationTopic.Net Mobile
|