Dissertation > Excellent graduate degree dissertation topics show
The Company Y salespeople optimization of performance indicators
Author: QianPing
Tutor: MaShiBin
School: Nanjing University of Technology and Engineering
Course: Business Administration
Keywords: Performance Management Key indicators method Performance indicators Optimal design
CLC: F272
Type: Master's thesis
Year: 2010
Downloads: 209
Quote: 0
Read: Download Dissertation
Abstract
|
Performance management as an important human resource management module , is to ensure that the business execution to achieve the strategic objectives of the important part . Company Y in the optimization problem facing the the sales sector performance management , led to the company's overall operating performance is not very satisfactory . Company Y the KPI - core performance management system to optimize the design theme . The article first introduces the theories and methods of performance and performance management , and analysis of the pros and cons of various methods and scope of general performance management trends , performance management system is increasingly focused on the strategic orientation , performance management as a strategic implementation an important means , and the system more and more systematic , practical application more emphasis on the technical. Secondly, to conduct a comprehensive analysis of the status and problems of the Y company sales department from the enterprise development strategy , business processes , organizational structure , human resources management , in particular, has carried out a detailed analysis of the performance management system running , attributed to Company Y in performance management the necessity aspect optimize . The focus of the article in the Y core KPI performance management system optimization research component , the content of a comprehensive study of the Y- company performance management system design principles , design ideas, as the core enterprise KPI target level system , security system operation , and strong technical performance planning process focused commentary , especially innovation processes , responsibilities decomposition informative presentations from technical operational level , but also to determine the departmental level KPI KPI target level system build process . FAQs and Y 's sales department performance investigation has found that the negative impact of the problem on the system running , the article also raised the necessary work Y corporate performance management processes needed for the operation carried out by the various stages , some safeguards need to take in order to avoid the performance management work . Finally , the conclusions of analysis of the advantages and disadvantages of the system design and implementation of the expected effect , and hope that the sales department of Company Y 's performance management system capable of effective implementation , continuous improvement , design optimization , and inspiration to other businesses and learn .
|
Related Dissertations
- Finite Element Analysis and Structure Optimal Design for Combined Seal at Normal Temperature and Low Temperature,TH136
- Construction of G Bank Yunnan Branch Office of Performance Management System,F272.92
- Deep Continental Drilling Rig Top Drive Hydraulic System Design and Research Summary,TE922
- The Balanced Scorecard China’s Public Department Performance Management Application,F272
- Study on the Third Oil Production Plant of Changqing Oilfield Company Medium-level Performance Management System,F272.92
- The socialist system with Chinese characteristics under the Public Sector Performance Management,D630
- Higher financial budget and performance management research,G647.5
- West Airlines Vocational Teacher Performance Appraisal System Optimization,G717.2
- Health products industry performance management research,F426.82
- JF coal chemical enterprise performance management research,F426.72
- Humaniod Robot Development and Research,TP242
- Jiangxi N County Electric Power Supply Company Performance Evaluation Research,F426.61
- Dynamic Analysis and Optimization of Six-bar Beating-up Mechanism of an Air-jet Loom,TS103.33
- The Research on Performance Management for the Teachers in the Stage of Compulsory Education,G472
- Research on Relation between Profession Values, Teaching Efficiency and Working Performance of Primary and Secondary School Teachers and Management Countermeasures,G635.1
- The Study of the Performance Management System of Taishan Medical School,G647.2
- M Tourism Scenic Performance Management System,F592.6
- Structure Analysis and Optimization Design for 150 Tons Flat-Top Crane,TH213.3
- J Institute researchers study and design of the performance management system,F426.22
- Research of Optimal Design of Power System in High Speed Railway,U223
- Optimal Design of Suspender Replacement in Concrete Filled Steel Tubulur Arch Bridge,U448.22
CLC: > Economic > Economic planning and management > Enterprise economy > Enterprise planning and management decision - making
© 2012 www.DissertationTopic.Net Mobile
|