Dissertation > Excellent graduate degree dissertation topics show

Dalian Port Project Management Study and Application

Author: XuShengKe
Tutor: WangYiXiang
School: Nanjing University of Technology and Engineering
Course: Industrial Engineering
Keywords: Construction-Agent System project process management information system (PPMIS) research and application
CLC: F552
Type: Master's thesis
Year: 2010
Downloads: 206
Quote: 1
Read: Download Dissertation

Abstract


The improvement of construction project management model and the corresponding design and application of project process management information system (PPMIS) of port of Dalian serve as a useful reference for project management of coastal harbor enterprises and similar State-owned large enterprisesBased on the deep analysis of investment subject’s diversification and requirement for elaborate, standard and information-based project management, this essay undertook the research and design of Enterprise Construction-Agent System and PPMIS.With a new relationship among the project investor, user and the construction agent, the Construction-Agent System has provided the proprietor with the solution for improved project management, with which the project construction has been brought closer to commercial operations thus the project management, is more specialized. Through the design and application of the PPMIS, a multi-project PPMIS for the proprietor has been built on the basis of flow management control, full-cycle management, investment progress resolve and real-time feedback control of the project.

Related Dissertations

  1. The Comparison Study of Agents on Construction Agent System in Public Project,F283
  2. Study of Enterprise Construction Agent System Rpoject Management Mode,F283
  3. The Study on Construction Agent System Management Model of Government Investment Projects,F283
  4. Study on Administration Model of Construction Agent System of Government-Funded Project,F283
  5. Agent-construction System’sinvestment Management Research,F284
  6. Research on Integrated Simulation of the Formation of Organizational Performance for Construction Agent System,F272
  7. Research and Application of Bridge Management System,U445.7
  8. Research on Organizational Management Model and Function Mechanism of Large-scale Project in Construction-Agent Company,F283
  9. Construction Agent System for Government Investment Projects in China in the Management of the Applied Research,F283
  10. Agent Unit Selection Research Projects under Agent,F283
  11. Study on the Risk of Construction-agent System for Government Investment Project Based on Principal-Agent Theory,F224
  12. Study on the Agent Construction System Management Procedure of Government Investment Projects,F283
  13. Petroleum Existing Enterprises Research and Application of the Sustainable Development Strategy,F426.22
  14. \,F284
  15. Study on Management Method of Construction Agent System for Governmental Non-profitable Investment Project,F283
  16. The Dominant Mode and Running Mechanism Research of Construction Agent System in Government Investment Projects,F283
  17. Study on the Contract Management Model of Government Investment Project,F283
  18. The Research for Construction-Agent Projects Invested by the Government of Urumqi City,F123.6
  19. The Construction Agent System Research of Xing Jiang Digital Seismic Observation Network Project,F283
  20. Study on the Construction-Agent System in Railway Construction Project,F532

CLC: > Economic > Transportation and economic > Sea transport and economic > Waterway transport economics
© 2012 www.DissertationTopic.Net  Mobile