Telecom Enterprise Information Disaster Recovery Center Research and Implementation

Author: JiaDong
Tutor: ZuoXiaoChaoï¼›XuZhenDong
School: Shanghai Jiaotong University
Course: Computer technology
Keywords: Disaster Recovery Disaster Recovery Center Data Synchronization Application switching Disaster recovery network Recovery time objective (RTO) Recovery Point Objective (RPO)
CLC: TP309.3
Type: Master's thesis
Year: 2011
Downloads: 45
Quote: 0
Read: Download Dissertation

Abstract


At present, the Chinese telecom companies are more and more dependent on the information center. However, due to various factors, small general hardware failure, to regional natural disasters, can cause total paralysis of the entire information center, leading the business operations to a standstill. Telecom enterprises urgently need to build from the information disaster recovery center to ensure data security and business continuity applications. After the completion of the construction of disaster recovery center, once the formal data center disaster or system failure, the data center can not work properly, then you can enable the disaster recovery center to take over the work of the data center, continuing to maintain production and services, to avoid greater losses. This thesis from data synchronization, application switching, disaster recovery network three information Disaster Recovery Center. Data synchronization, the following four disaster recovery solutions: Data Guard, GoldenGat, IBM PPRC-XD, EMC SRDF / A assessment, and in accordance with their respective advantages and disadvantages of the study concluded. Taking into account in the telecommunications enterprises, data security, and not to lose is the most important, and therefore recommend the use of the IBM PPRC-XD, EMC SRDF / A Smart stored data synchronization. Application switching technology by studying DNS configuration database domain connection, simplifying disaster recovery switching operation, improve disaster recovery switching speed; needs analysis model and server processing power to determine the needs of the disaster recovery center Host Configuration. On the network side, access networks from metro data network, the storage network, operating room and other interface network in four areas studied separately, under different circumstances. After given the true story of the construction of Shanghai Mobile Disaster Recovery Center. By analyzing the actual situation of the mobile information center in Shanghai to develop a suitable recovery time objective (RTO) and recovery point goals (RPO), and considering the requirements of the disaster recovery system stability, validity and application system switching fast timeliness and other requirements, the design goal of building a mobile disaster recovery center in Shanghai and programs, according to the results of previous studies, selected EMC SRDF / A data synchronization between the disaster recovery center and production center. For different disaster situations, and establish a run of six sets of disaster recovery center program. Finally, after the completion of the disaster recovery center construction by the conduct of the disaster recovery switch drill, confirmed that the Disaster Recovery Center to design the required recovery time objective (RTO) and recovery point goals (RPO).

Related Dissertations

  1. Research on Security-check Information System Based on Multi-information Fusion,V328.3
  2. The Design and Implementation of Management and Control System of RFID Code Resolution Networks,TN915.0
  3. WAN-based disaster recovery storage system fault detection technology Research and Design,TP333
  4. Dual controller disk array data synchronization channel high-speed transmission technology research,TP333.35
  5. RFID applications for the tobacco industry demonstration platform,TP391.44
  6. Disaster earth station antenna servo control system research and design,TN820.3
  7. Mobile network RBT platform Enforcement Program,TN929.5
  8. Invitrogen based on ESI's procurement information system development,TP311.52
  9. Disaster backup technology Research and Implementation,TP309.3
  10. Research on Redundant Architecture of a Medium-Sized PLC and Realization of Synchronization Technology,TP273
  11. The Application and Research About Metadata in SAAS Product Management Platform,TP393.09
  12. Research of Business Continuity and Disater Recovery Technology,TP309.3
  13. Flight Academy flight operations information management system design and implementation,TP311.52
  14. The Design and Its Implement of a Data Synchronization System between the Intranet and Internet Based on XML,TP311.13
  15. Inter-bank trading platform disaster recovery Research and Design,TP309.3
  16. File backup system software planning and implementation,TP309.3
  17. Windows CE-based monitoring room management system design and development,TP311.52
  18. A highly reliable air traffic control radar data recording and playback system design and implementation,TP311.52
  19. Exchange-based mail system for SMEs Research and Implementation,TP393.098
  20. Full database retrieval method and its application,TP311.13

CLC: > Industrial Technology > Automation technology,computer technology > Computing technology,computer technology > General issues > Security and confidentiality > Data backup and recovery
© 2012 www.DissertationTopic.Net  Mobile