Dissertation > Excellent graduate degree dissertation topics show
Study on the Strategy about Across Pearl River of Guangzhou-Shenzhen-Hong Kong Special Passenger Line
Author: PanGuoQiang
Tutor: YangJiaQi
School: Wuhan University of Technology
Course: Transportation Planning and Management
Keywords: Guangzhou-Shenzhen-Hong Kong Passenger Line Changjiang River Crossing Program evaluation Fuzzy Comprehensive Evaluation Method
CLC: U212
Type: Master's thesis
Year: 2010
Downloads: 28
Quote: 1
Read: Download Dissertation
Abstract
|
Accompanied by the rapid development of China's socio-economic, traffic demand sharp increase in the number of quality requirements is also rising. Speed ??passenger rail lines for its transport capacity, speed, security, good performance, small footprint, energy province and other advantages and demonstrated strong vitality, social and economic benefits is very significant, is the direction of the future development of passenger traffic. Therefore, the evaluation of the merits of railway passenger line construction program and strategic choice has been subject to the attention of scholars at home and abroad. Guangzhou-Shenzhen-Hong Kong passenger railway line as fast railway corridor connecting Guangzhou, Shenzhen, Hong Kong, bear the Guangzhou-Shenzhen-Hong Kong Express passenger and the Hong Kong and Shenzhen to Beijing-Guangzhou Passenger Line across the line long-distance passenger also bear along the Guangzhou-Shenzhen-Hong Kong intercity passenger, construction the line has great significance to enhance the international competitiveness of the region to strengthen economic cooperation, promote regional economic prosperity and development of the Mainland and Hong Kong SAR. Passenger Line of the Guangzhou-Shenzhen-Hong Kong across the Pearl River project is a full range of control engineering, is the most critical point of the line construction, whether it is adopted bridge program or tunnel program to meet the high-speed railway 350km / h speed target value requirements in the country and even the world is a precedent, so its options is important. Firstly, from the Guangzhou-Shenzhen-Hong Kong Passenger Line profile along the Passenger Line of the Guangzhou-Shenzhen-Hong Kong Economic and Development Planning, the Guangzhou-Shenzhen-Hong Kong Passenger Line along the traffic situation and development planning across the Pearl River, the Guangzhou-Shenzhen-Hong Kong Passenger program needs analysis and the Guangzhou-Shenzhen-Hong Kong Passenger the more Pearl engineering construction environment discourse analysis in five areas Passenger Line of the Guangzhou-Shenzhen-Hong Kong across the Pearl River program construction conditions; compare the more possible in the Pearl River bridge and tunnel program based on the Guangzhou-Shenzhen-Hong Kong Passenger Line of the different bridge and tunnel addressing scheme, argument elect the best program of bridge and tunnel site; then select more Zhujiang program the key factors that have a significant impact, constructed by the cost of the project with technical indicators, and urban development coordination indicators, indicators of safety and environmental protection, maritime development coordination Guangzhou-Shenzhen-Hong Kong Passenger Line indicators 4-level indicators and certain secondary indicators constitute the more comprehensive evaluation index system of the Pearl River, and the each indicator quantify processing, in order to evaluate; affected by many factors, across the Pearl River Engineering impact with fuzzy characteristics, the paper uses fuzzy comprehensive evaluation method Passenger Line of the Guangzhou-Shenzhen-Hong Kong across the Pearl River engineering bridge and tunnel program than the election, get the best solution. The conclusions of the thesis is of great significance to promote the construction of the Guangzhou-Shenzhen-Hong Kong Passenger Line, to play for national economic and social benefits of the Guangzhou-Shenzhen-Hong Kong Passenger Line; same time, for the similar project draws.
|
Related Dissertations
- On the Program for Evaluating and Cultivating the Core Competitiveness of GY University Press,G239.22
- Economic Evaluation of Chengdu to Chongqing PDL Base on Railway Network System,U212.1
- Model and Design for Teaching Evaluation System at Higher Institutions,TP391.6
- Risk Evaluate of Raw Material Supply in Hydropower Development Project,TV51
- SGD company ERP software vendor selection research,F270.7
- Highway Maintenance Performance Evaluation Institutions,U418.2
- Internet sales of lottery Risk Early Warning System,F224.32
- Mixed-configuration Instance Solving and Non-standard Scheme Evaluation Technologies for a Type of Order Product and Their Application,F224
- Evaluation and Analysis of the Post-sale Service Competitive Ability of the Automobile,F426.471
- Study on the Layout of Highway Passenger Transport Station,U492.1
- Small and medium span bridges the live load design standards of the high-speed rail,U442
- Research on Risk Management of Xia-Rong Highway Sha-Jing Street Tunnel Construction,U455.1
- Study on Road Network System Planning Theory Method of New Urban Districts,U412.1
- The Changes of Transportation Channels after the PDL Introduce and Development Strategy Research,U293.1
- The Research on Collective Forestry’s Property Right Reform Performance Evaluation in Fujian,F326.2
- Application Research of Regional Human Resource Comprehensive Competitive,F224
- Commercial Bank of SME Credit Rating,F832.4;F224
- Research on Optimization of Financing Mode for Small and Medium Enterprises Based on Financing Effectiveness,F276.3
- The Study and Application of Carrying Capacity of Water Resources in Liaoning Province,TV213.4
- Analysis of Flood Risk Evaluation in Jinjiang Basin Based on GIS,P208
- Research on Optimal Selection of Expressway Program Based on AHP and Fuzzy Comprehensive Evaluation Method,F542;U412.366
CLC: > Transportation > Rail transport > Railway Line Project > Line planning, surveying and design
© 2012 www.DissertationTopic.Net Mobile
|