Contractor claims the problem in FIDIC
Author: JiangDongRan
Tutor: LiWei
School: China University of Political Science
Course: International law
Keywords: Claimant FIDIC Conditions of Contract Engineering Change Expense Claim The time claim
CLC: F284
Type: Master's thesis
Year: 2010
Downloads: 360
Quote: 2
Read: Download Dissertation
Abstract
|
The huge international project market, the competition is fierce. And the international project construction market never get rid of the \and other ways to enhance their competitiveness. This situation will make the already bear more risk of the contractor in a more inferior status than the owners, if a problem occurs, the contractor is likely to face a loss. At this point, the superb level of claims will be determined to a large extent the contractor whether earnings and further affect the competitiveness of the contractor. As the FIDIC Conditions of Contract for Civil Engineering Bible contractor claims for specific content, methods of operation and so on to make a detailed and thorough provisions, has been widely recognized in the international, on behalf of the provisions of international contractors claim higher level. In recent years, more and more contractors joined the fierce competition in the international construction market, however, the impact of the problem by the of claims consciousness and experience, our contractors on claims management of the world's most advanced international contractors, there is a certain gap . Therefore, the contractor claims under FIDIC Conditions of Contract will have to help to improve our the contractor claims management level, to strengthen its international competitiveness. FIDIC contract terms and conditions, as our \Therefore, FIDIC contract on the basis of the contractor claims discussed. In this paper, the text of FIDIC contract basis to discuss the international project contractor claims. The first part focuses on the concept of FIDIC Conditions of Contract for Contractor claims and legal characteristics and the legal basis for the claim, from the qualitative macro contractor claims, the convenience of the reader to understand the the contractors claims under the FIDIC contract conditions essentially . The second part discusses the legal reasons cause the contractor claims under FIDIC contract conditions, analysis of the characteristics of different types of contractors claims and processing methods, and four typical contractor claims detailed discussion. The part can help contractors learn how to conduct risk prevention clear when anything can bring a claim to grasp the opportunities of claims. The third part of the main contractor claims under FIDIC contract conditions and procedures. The part first claim content is divided into the time claim and expense claims, and a detailed analysis of the characteristics of the two calculation methods; then described specific procedures of contractor claims, and a different approach to comparison analysis characteristics.
|
Related Dissertations
- The Study of Implementation of DBO in Chinese Infrastructure Construction,F284
- Complement of the System of Chinese Construction Contract from Comparison of the Hong Kong Style Construction Contract and the FIDIC Conditions of Contract,F284
- Construction Claims of Construction Engineering Projects Contractor,F284
- Real estate project cost control in FIDIC,F284
- FIDIC Conditions of Contract for the problem in China,F284
- On Relevant Legal Problems of Demand Guarantee Letter in International Contract Project,D996
- Studies on Application of the Claim and Counterclaim in Engineering Construction,F293.3
- New FIDIC Red Book of international construction field force majeure clauses Comment,F284
- Research on Counterclaim Management of Project Construction Contract,F426.92
- Study on the Application of FIDIC on Chinese Railway Construction,F532
- Research of the Claim Management by the Engineer under FIDIC’s Conditions of Contract for Construction,F284
- FIDIC Conditions of Contract for legal claims under international engineering,D99
- Criminal Compensation System of,D912.1
- The Application of the Rule of Foresight in International Project Contracts,D997.1
- Legal claims under FIDIC contract conditions,F284
- Xiaolangdi project owner Contract Management Case Study,F426.9
- Study on Solving the Problems of Contractual Claims and Disputes in International Projects,F284
- Civil Judicial Discretion in allocation of burden of proof,D925.1
- SME Product Engineering Change Management Issues,F273.2
- Xinxiang College Area C, young teachers apartment building engineering process cost control study,F284
CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net Mobile
|