Dissertation > Excellent graduate degree dissertation topics show
Dehui New River bridge on the river embankment flood control impact assessment
Author: LiuYaFen
Tutor: SunXiuLingï¼›WangJinJian
School: Shandong University
Course: Hydraulic Engineering
Keywords: Crossing bridge Dike Flood control and evaluation
CLC: TV871
Type: Master's thesis
Year: 2008
Downloads: 219
Quote: 1
Read: Download Dissertation
Abstract
|
With the development of our economy and society , more and more across the river, flood storage and estuaries road , railway and oil gas pipeline construction project , construction project management in river management within the scope of work is getting heavier and heavier . According to the basic situation of the construction project , where the river for flood control and flood control requirements , flood control projects and the layout of the river training works and other facilities of the national economy and distribution , and channel evolution analysis results , flood control and evaluation by calculation or test results on the construction of the flood impact of the project is a comprehensive evaluation , this pair of new projects to mitigate and reduce the adverse effects of the existing flood control projects , the legal expedient practical guiding significance to the maintenance and management units . Dehui new river bridge ( alteration works ) of Dehui New River flood control effects have been evaluated . The main contents are: according to the situation of the construction project , the possible impact , where the reach of hydrologic and sediment characteristics , the main task of the evaluation of flood control , select representative hydrological series erosion and siltation of the implementation of the project . According to the basic situation of the construction project , where the river for flood control and flood control requirements , flood control projects and the layout of the river training works and other facilities of the national economy and distribution , and channel evolution analysis results , flood control and evaluation by calculation or test results on the construction of flood control project the impact of a comprehensive evaluation . Combination of river erosion and deposition calculations or test results , evaluation of project construction will affect the stability of the river regime ; construction of temporary structures may affect the stability of river construction projects should be based on the calculation, analysis of the construction of the stability of river the impact . According to the information provided by the investigation and the relevant departments to analyze the impact of the project construction legal water rights and interests of the third party . In this paper, the results under a different standard of design flood flow and water level of the bridge design calculated value ; channel evolution analysis ; construction of a bridge river erosion and deposition calculation and results analysis ; comprehensive evaluation of the impact of the bridge on the river embankment flood control ; existing flood control standard adaptability .
|
Related Dissertations
- Semi-circular breakwater foundation bearing capacity calculation method,U656.2
- Study on Optimization about Coffer-dyke Project Design Scheme of the New City Nearby Sea in Tianjin Seashore Holiday Resort,U656.2
- Study of Maximum Depth of Scouring in Front of Gu Dong Breakwater of the Yellow River Delta,U656.2
- Study of the Technology of North Sea Wall Reclamation Project of Xiao Yanshan,U656.2
- Assessment of Defense Capability of Sea Dikes in Shanghai for Tyhpoon,P731.2;U656.2
- Stability Analysis for New Types of Breakwaters on Soft Foundation,U656.2
- Experimental Research on Layer Thickness of Wave Overtopping Flow and Secondary Wave Conditions Over Sloping Breakwater,TV139.2
- Stduy of Multiphase Coupled Piping Mechanism and Levee Security Early Warning System,TV871.2
- Dongting Lake area of rural highway routes technical indicators,U412.3
- Inverse Analysis of the Dynamic Characteristics of Embankment Materials Based on Genetic Algorithm Method,TV871
- Study on Local Scour Around Spur Dikes on Sand Beds of Yellow River by Model Experiment,TV131.6
- Study on Landscape Spatio-temporal Evolution and Its Regulation Countermeasures of the Typical Wetlands in the Pearl River Estuary Region, South China,X37
- Study on Failure Mechanism and Methodology of Safety Assessment of the Lower Yellow River Dike,TV871
- Study on the behavior of Sinking Model Cutoff Wall Material and Deformation Characteristics in Levee Project,TV871
- Researches on the Breakwater-foundation Stability under Wave Cyclic Loading,TV139.26
- Flood Evolution Numerical Simulation Research on Flood Hazard Mapping,TV877
- Study on the Method of Risk Assessment of the Levees,TV871
- Wuzhou City in Guangxi flood control projects and the urban environment coordinated research,TU998.4
- Yellow River Floodplain Security Construction and related policy research,F426.9
- Consider a homogeneous stress field coupling embankment seepage theoretical analysis and model tests,TV223.4
CLC: > Industrial Technology > Hydraulic Engineering > River training works and flood control projects > Flood control projects > Embankment
© 2012 www.DissertationTopic.Net Mobile
|