Dissertation > Excellent graduate degree dissertation topics show

The Study on Risk Evaluation System of Construction Programme

Author: YinBo
Tutor: WangShunHong
School: Southwest Jiaotong University
Course: Project Management
Keywords: Engineering construction project group Risk Assessment System Factor Analysis Fuzzy Comprehensive Evaluation
CLC: F284
Type: Master's thesis
Year: 2008
Downloads: 549
Quote: 5
Read: Download Dissertation

Abstract


Related Dissertations

  1. The Study on Risk Evaluation of BOT Projects in China University,G647
  2. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  3. Studieson Effects of Soybean Species on Yuba and Initial Establishment of Quality Evalution System for Yuba,TS214.2
  4. Comprehensive Evaluation of Safety Production and Optimization of Safety for Yangcheng Coal Mine,X936
  5. Social insurance agencies risk prevention research,F842.6
  6. Chinese hog industry ( chemicals ) International Competitiveness,F752.6;F224
  7. Buss-Perry attacks questionnaire in 2757 college students in applied research,G645.5
  8. Based on Factor Analysis of the chemical industry trade Financial Performance Evaluation of Listed Companies,F224
  9. An Empirical Study of Measurement of the Competitiveness of Private Enterprises,F224
  10. Empirical research on the behavior of the controlling shareholder of the quality of accounting earnings,F832.51;F224
  11. Study on Risk Identification and Evaluation of Manufacturing Green Products R & D,F205;F224
  12. Study on Circular Economy Assessment in Plan Environmental Impact Assessment of Coal-mining Area,F426.21
  13. An Study on the Efficiency of the Listed Real Estate Companies Based on Factor Analysis Method,F224
  14. An Empirical Research on Affacting Factors of FDI of Hebei Province,F832.6
  15. Safety Assessment of Coal Gangue Hazard and Analysis of the Greening Reclamation,TD849.5
  16. Research on State Diagnosis on Fan Based on Factor Analysis and BP Neural Network,F426.61
  17. The Research on the JiangXi Urban Social Pension Insurance-the Balance on Payments and Regional Comprehensive Level,F842.6
  18. Risk Evaluate of Raw Material Supply in Hydropower Development Project,TV51
  19. Research the Most Important Influencing Factor in a Subjective Evaluation about the Acoustic Environment in Concert Hall,TU112
  20. SGD company ERP software vendor selection research,F270.7
  21. Environmental audit risk identification, assessment and control of,F239.6

CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net  Mobile