Dissertation > Excellent graduate degree dissertation topics show

Performance Assessment of Coal Terminal by AHP

Author: MengXuDong
Tutor: LiuCuiLian;WangHongJin
School: Dalian Maritime University
Course: Traffic and Transportation Engineering
Keywords: Pier Performance Management Balanced Scorecard Analytic Hierarchy Process
CLC: F552.7;F224
Type: Master's thesis
Year: 2010
Downloads: 147
Quote: 1
Read: Download Dissertation

Abstract


In today 's era , the speed of economic globalization increasingly accelerated and more intense competition between enterprises in the world , human resources management has become increasingly prominent position in the enterprise management . Performance management as one of the most important activities of human resource management , improve the incentive mechanism, enhance the level of corporate human resources management is essential . Performance management of science and play a crucial role in improving the efficiency of labor , improving the objectives of the enterprise and its employees , and to improve economic efficiency of enterprises , to achieve sustainable development . To evaluate the performance of the coal terminal has been a concern of the port authorities , the existing literature has not yet put forward a more effective method . Based on the strategic objectives of the Shenhua Tianjin Coal Terminal , to meet the requirements of corporate strategy and long-term development , combined with the actual situation of the company , the balanced scorecard as a guiding tool . First , the paper collected domestic and foreign experts on coal terminal , port performance from these three aspects of the evaluation index, evaluation function , evaluation model classified . Secondly, the paper system introduced the theory of human resource management , performance management is one of the most active core of human resource management and balanced scorecard, key performance indicators law , management by objectives , Deming cycle , 360-degree evaluation the study, compared the advantages and disadvantages . Again, the thesis the Balanced Scorecard theoretical guidance to build a balanced , scientific Coal Terminal performance index system , using analytical hierarchy process for processing the data collected , showing the balanced scorecard is worth pier Human Resource Management . Finally, the paper put forward relevant suggestions for improvement Shenhua Tianjin Coal Terminal Human Resource Management .

Related Dissertations

  1. Research on Dam-Break Probability Analysis Method for Dangerous Reservoir,TV697
  2. Research on Index System and Evaluation of University Office Greening,G647
  3. Dalian Waters Fire-fighting Forces Deployment Scheme Research,U698.4
  4. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  5. The Research on Evaluation Method of Highway Ecosystem Healthy,X826
  6. Construction of G Bank Yunnan Branch Office of Performance Management System,F272.92
  7. Performance Evaluation of University Academic Team Based on Balanced Scorecard,G647
  8. Prospecting and evaluation of the initial stage of the value of the elements of the analytic hierarchy process and fuzzy comprehensive evaluation model,F426.1
  9. A Comprehensive Evaluation of Heritage Trees,S788
  10. The Balanced Scorecard China’s Public Department Performance Management Application,F272
  11. Study on the Third Oil Production Plant of Changqing Oilfield Company Medium-level Performance Management System,F272.92
  12. The socialist system with Chinese characteristics under the Public Sector Performance Management,D630
  13. Higher financial budget and performance management research,G647.5
  14. West Airlines Vocational Teacher Performance Appraisal System Optimization,G717.2
  15. Health products industry performance management research,F426.82
  16. Garment Co., Ltd. Anshan SF Marketing Strategy,F426.86
  17. JF coal chemical enterprise performance management research,F426.72
  18. Research on Capital Management in Current Chinese Universities,G647.5
  19. Research on Evaluation of Coal Enterprise Energy-Saving Mechanism,F206
  20. Jiangxi N County Electric Power Supply Company Performance Evaluation Research,F426.61
  21. Research on Business Model of Online Team Buying Based on Analytic Hierarchy Process,F713.36

CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net  Mobile