Dissertation > Excellent graduate degree dissertation topics show

Research on the Development Program of the Shanwanzi Wind Power Plant

Author: MeiChunXiao
Tutor: ShangRuBin
School: Tianjin University
Course: EMBA
Keywords: Wind electricity generation Wind energy resources Electricity generation cost Risk management
CLC: TM614
Type: Master's thesis
Year: 2007
Downloads: 145
Quote: 1
Read: Download Dissertation

Abstract


Energy is the material basis of the survival and development of human society, and energy industry is basic industries of the national economic development. Along with the over-consumption of conventional energy, the issue of environmental pollution is more and more important. The pressure of energy consuming and environmental protection makes all governments increase investment in clean and renewable energy. Wind energy as a renewable energy is now being valued by more and more governments, especially the developed countries like the United States and EU members. China is still in the starting stage of using wind energy. How to speed up development of wind power generation is related to the issues of supply, the adjustment of china’s energy structure, pollution control and economic sustainable development.In this article, firstly, the technology of wind power generation and its development at home and abroad are briefly introduced, the successful development experience of wind power generation in developed countries is analyzed and summarized, and the existing problems in our power generation development are pointed out. The situation of wind resources is a decisive factor in construction of wind power plants. Also, the information of the Shanwanzi area is systematically collected and analyzed in detail. Trough precise analysis of detailed date, it comes to a conclusion that this area is suitable to establish a large wind power plant. By comparison and analysis, equipment model of the first phase of the project in Shanwanzi is confirmed, and generation energy and utilization hours in a year are calculated on the basis of related data. According to the price level in the fourth quarter of 2006, through the estimation about investment project and appraisement and analysis of the financial situation, it draws conclusion that this project is available financially. Then, the environmental, social and economic effects after this project has been carried out are analyzed. Finally, the qualitative analysis about risks which possibly happen in the development of Shanwanzi is carried out, and then specific action is offered.The goal of this paper is to provide an important reference for the scientific research, design and construction of Shanwanzi project. According to the implementation of the early stage of the project which basically follows this program, it demonstrates that this program is feasible and corresponds with the actual needs.

Related Dissertations

  1. Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
  2. Open pit production accidents studied because of the risk management measures,TD771
  3. The Competition Management System of Harbin 24th Winter Universiade 2009’s Risk Management,G812.2
  4. The Innovative Study Based on the Equity Financing of Forest Management from the View of Sustainable Development,F326.2
  5. Offshore oil platform construction phase Operational Risk Management Research,F426.22
  6. Chemical Industrial Park Environmental Risk Management Technology Source,X327
  7. A Construction Project Owner Risk Management Research,F284
  8. Study on Ecosystem Risk Management of Coal Mine Based on Fuzzy Cognitive-map and Stakeholders’ Participation,X322
  9. Research on Risk Management of Shenyang Yuanda Internal Curtain Wall Project,F426.92
  10. The Compliance Risk Management Study of the Rural Financial Institutions,F832.35
  11. New Basel Capital Accord and Commercial Bank Risk Management,F832.2
  12. Research on the Information Risk Management of the Credit Cooperatives of Shandong Online Banking,F832.2
  13. The CD Commercial Bank IT Risk Management,F832.2
  14. Reseaching on Using of Credit Derivatives of Our Country,F224
  15. The Reform Direction of Baselii Accord under Subprime Crisis and the Inspiration to China,F832.1
  16. Research on the Evaluation and Model of Apparel Supply Chain Risk for Apparel Manufacturing Enterprises,F274;F224
  17. The Research of the Risk Management during the Project of Acrylic Acid in Huayi Corporation,F426.72
  18. Improvement of Laws on the Risk Control of Credit Card Fraud,D924.3;F832.2
  19. Research on Internal Control of X State-owned Grain Enterprise,F324.9
  20. Alleviate the Financial Dilemma of Small and Medium-sized Enterprises System Design,F276.3
  21. Research on Assessment of Risk of Strategy and Comprehensive Evaluation of Risk Management of Strategy,F272

CLC: > Industrial Technology > Electrotechnical > Power generation, power plants > Variety of power generation > Wind power
© 2012 www.DissertationTopic.Net  Mobile