Analysis of Reasonable Finished Dead State and Simulation of Construction Control of a Cable-stayed Bridge with Single Inclined Tower and Hybrid Girder
Author: ZhangFuJian
Tutor: LiZhongXian
School: Tianjin University
Course: Bridge and Tunnel Engineering
Keywords: Cable-stayed bridge Single tower Hybrid girder Bridge state Construction state Error Analysis Construction Control
CLC: U448.27
Type: Master's thesis
Year: 2007
Downloads: 169
Quote: 7
Read: Download Dissertation
Abstract
|
Cable-stayed bridge with its superior spanning capabilities , of reasonable force system , as well as innovative structure , has become one of the fastest growing modern bridge engineering , most competitive bridge . With a span of increasing diversification and structural complexity , and brought many new issues to the design and construction . In this paper, Tianjin, Hebei Street cable-stayed bridge as the background, reasonable cable-stayed bridge the determine with construction of the Bridge control study . Reasonable finished dead state of existing cable-stayed bridge cable force calculation method described and summarized to determine the bridge reasonable to bridge the state 's standards . To establish an integrated approach to structural analysis and cable force optimization model , the minimum bending energy the stress balance method and impact matrix combined to determine the state of reasonable cost bridge cable force , under the force of the rope , the stress state of the structure , the tower top side bit smaller . This integrated approach is clear thinking , clear objectives to avoid the limitations of the single use of certain methods . Cable-stayed bridge to achieve the final bridge construction need to go through a series of steps , the process and the application of different construction methods , and discusses the method of calculation of the reasonable construction of state . Hebei Street cable-stayed structure characteristics , site conditions , determine the construction program , the construction process steps according to the situation of construction . Dress iterative method to determine the state of the cable-stayed bridge reasonable construction , and to consider the requirements Tower Beams and construction of the actual situation in the calculation process , the analysis showed that the application of this method is simple , to good effect . Impact matrix method to adjust the bridge after the cable force error , prestress and alignment are more reasonable to ensure the safety and durability of the bridge state . The cable-stayed bridge construction error analysis focuses on the bracket stiffness beam tower weight error , the impact of temperature on the static behavior of the cable-stayed bridge , and welding deformation of its control methods are discussed . Structural system characteristics, combined with Hebei Street cable-stayed bridge to determine construction control content , develop control processes .
|
Related Dissertations
- Tooth Profile Modeling and Machining Error Analysis of the Face Gear,TH132.41
- Error Analysis and Measurement Method Design for the Hemispherical Resonator Gyro,V241.5
- Korean Students ' Acquisition of Chinese Classifiers error analysis,H195
- The Large Concrete Hydration Heat Temperature Effects Research of the Cable Stayed Bridge,U441.5
- English -speaking Chinese learners willing verb bias analysis,H195
- Error Analysis of Students’ English Writing in Vocational College,H319
- The Error Analysis and Teaching Strategy of "Ba" Sentences to Foreign Students,H195
- A Corpus-driven Comparative Study of Uses of TAKE,H319
- The Commparative Study of Chinese and Korea Quantifier,H14
- Large spiral bevel gear error analysis and correction techniques,TH132.41
- A project supervision model of multi-project management company,F284
- RLG goniometer error theory and experimental research,V241.5
- Attitude Control Technology of a Small Video Satellite,V448.2
- North Jiangqiao Cheng bridge and construction process force performance analysis,U448.27
- Excavation of earth and rock at the junction of strata tunnel surrounding rock and supporting structure stability analysis,U451.2
- Large Span Prestressed Concrete Continuous Rigid Frame Bridge Analysis and Construction Control of Long-term Practice of Deflection,U448.23
- The Construction Control for PC Continuous Beam Bridge,U445.4
- Study on the Road Performance of Asphalt Rubber Gravel Seal Coat,U414
- Construction Process Analysis of Fly-bird-type CFST Arch Bridge and Construction Control,U445.4
- Study on 3D Checking System for the Ballastless Track in the High-speed Rail Way and Its Error Analysis,U216.3
- Research and Design of the De-weighting Controlling System of the Automatic Dynamic Balancing Machine,TH877
CLC: > Transportation > Road transport > Bridges and Culverts > All kinds of bridges > Bridge: Structure > Cable-stayed bridge
© 2012 www.DissertationTopic.Net Mobile
|