Dissertation > Excellent graduate degree dissertation topics show
A Study on the Schedule Control of 110KV Power Transmission and Transformation Project in the Development District of Shangtianti
Author: WuHua
Tutor: ZhangZiGang
School: Huazhong University of Science and Technology
Course: Business Administration
Keywords: power transmission and transformation work schedule control
CLC: F426.61
Type: Master's thesis
Year: 2010
Downloads: 29
Quote: 0
Read: Download Dissertation
Abstract
|
Electric power, which is essential to the social and economic development,should be given priority. Safe and reliable power supply is the basic security not only to the production of industrial and agricultural but also the live of people. At present, along with the fast and continued development of market economy,the shortage of power supply becomes more and more serious,which requests urgently to the project of power transmission and transformation. Under the new situation,it is of a great guiding importance for the project construction and management to explore new methods on progress management control continuously,to make reasonable and practical schedule of projects and to utilize project management means scientifically on controlling the progress of the transmission and transformation projects.This article will take the schedule control of 110KV power transmission and transformation project in the development district of Shangtianti as background,making use of P3,which is very popular progress management software in the engineering world,taking the unit construction of power transmission and transformation as the basis, analyzing the engineering structure of power transmission and transformation in the shape of tree, and then assign work unit and set up the system of schedule control. By means of dynamic control concept,examining the project progress regularly in the progress of construction,analyzing the deviation that affects the plan of project progress,comparing and discriminate the rectification plans,achieving the goal of the scientific management and dynamic control to the rate of progress,at the same time,according to the years working experience,research risk factor that affects the project progress of 110KV power transmission and transformation,build the analysis template base on the risk factor,by the perfect plan to anticipating control of schedule risk,accomplish risk control of management in advance on the project of 110KV power transmission and transformation successfully,which provides a success case for anticipating control on project progress.
|
Related Dissertations
- A Pilot Study on Return-to-Work Following Occupational Replantation of Amputated Fingers,R658.1
- Effective Ways of Cultivating Design Thinking in the Teaching of Advanced Art Design,J50-4
- The Study of Handicraft Inheritance as Intangible Cultural Heritage in Local Universities,G122
- The Chinese Communist Party United Front Work in the new social class,D613
- The Study on the Vocational Student’s Professional Ethice Education in the Patten of Combing Work with Study,G711
- Effects of Maternal Migrant Work Experience on Cognition and Social-Life Abilities of Rural Pupils: a Cross-Sectional Study,R179
- The Study of Project Management Theory’s Applying in Work of Communist Youth Leagur of Universities,D297
- Study on Schedule Plan and Control of Smart Card Appllying System for HNU,TP399-C1
- The Establishment of Grid Platform on Agricultural Supply Chain System,S126
- A Study on the Scientific of United Front Work in New Era,D613
- Research on Injury Insurance Policy and Implementation about Peasant Worker of China,D412.6
- Innovative Research on Ideological and Political Teaching in Omnimedia Age at College and University,G641
- Cost Control of government statistical work,C829.2
- Tianjin foreign education systems management problems of foreign students study,G648.9
- Institute for Defense Studies and Research Work Performance Evaluation Model,G311
- A Preliminary Study on the Petition Work,D632.8
- On the successful experience of its revelation of the the Yan'an period of ideological and political education,D231
- Normalization Management of Routine Work for College Counselors,G641
- The Relationship of Achievement Motivation, Occupational Commitment and Work Engagement of Staff,C93-05
- ATV vehicle weapon control system,TP273
- Democratic proposals Work Study,D665
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|