Dissertation > Excellent graduate degree dissertation topics show
The Technique of Diaphragm Wall Treatment and Its Application in Hongxing Road Station Project of Tianjin Metro Line 2
Author: ZhaoQingWu
Tutor: ZhengGang;ZhangXingYan
School: Tianjin University
Course: Geotechnical Engineering
Keywords: diaphragm wall treatment scheme construction design verticality trenching quality bottom-clearing replacement
CLC: U231.3
Type: Master's thesis
Year: 2007
Downloads: 372
Quote: 1
Read: Download Dissertation
Abstract
|
The Hongxing Road Station Project of Tianjin Metro Line 2 is located at the joint of Huachang Street and Hongxing Road and nearby Shunchi Bridge. The construction site used to be apartment buildings. The superstratum consists mostly of miscellaneous fill and waste building foundations and substratum consists mainly of sandy clay and sand. Diaphragm wall, which is a kind of highly mechanized complex construction technique affecting greatly on subsequent work, is adopted as the retaining structure of Hongxing Road Station. Its construction is an important subsection of this project due to the great influence of its quality on the safety of deep excavation and main structure.Based on this project a reasonable scheme of the parameter design of diaphragm wall and the management of construction technique, quality and safety is presented in this thesis. According to the characteristics of site, buildings and geological condition every aspects of diaphragm is reasonably designed. The request of diaphragm wall design and construction management is proposed after the comparing and analyzing various aspects such as the environmental and economical interest, the affection on environment around during construction, the schedule and arrangement of construction and the request of excavation and main structure. The design, construction and examination of diaphragm wall are particularly described.Based on the analysis of potential problems in diaphragm wall construction some practical precautionary measures are advanced. Firstly, the guide wall should be built on the original state soil in case of the concrete in diaphragm wall exceeding the structure sideline during construction, increasing workload of concrete clearance and affecting on construction schedule and quality seriously. Secondly, much attention should be paid on the trench verticality directly affecting on the subsequent excavation and water precaution. The trench verticality mainly depends on the trenching machine operator’s management of trench quality and the pitch metering device in trenching machine. Besides, guide hole can also be adopted to control the trench quality. Finally, high quality of bottom-clearing replacement should be ensured lest too thick sediment makes coarse gravel in the bottom and grout in the top affecting the seepage precaution of diaphragm wall.In this thesis the examination data of diaphragm wall is deeply analyzed and the integrality of wall is determined through the wall lacuna and its position. It is found that the impermeability increases with the concrete strength and gradation.After the retaining treatment of the pit in this project using diaphragm wall, during excavation less deformation and seepage of pit and affection the buildings nearby the site on occur compared with the structure using retaining pile. Besides, there is little affection on environment around due to little noise in construction.
|
Related Dissertations
- Dongsheng Company Media Asset Management System Design and Implementation,TP311.52
- Primary Research of Glue-Laminated Bamboo Architecture Design,TU531.3
- The Application of Soil Mixing Wall Engineering Method for Deep Foundation,TU753
- The Study on Semi-automatic Visual Inspection Measure System of Escape Wheel,TP391.41
- Cangzhou coastal highway bridge abutment segment high embankment reinforcement of soft foundation Stability Study,U416.1
- Error Measurement and Synthesis of Lunar Soft Landing Movement Simulation System,V416.8
- Continuous Diaphragm Wall of Theoretical Calculations and Engineering Measure of Contrasting and Analysis,TU753
- Finite Element Analysis of Stress and Deformation for Plastic Concrete Diaphragm Wal,TV543.8
- Analysis of Deep Excavation Anti-float Structure Design in Typical Wuhan Subway Stratum,TU753
- Research on Deformation Rules about Support Structure and Adjacent Soil in Deep Foundation Engineering,TU753
- Numerical Simulation of the Effects of Deep Excavation to Soil and Neighboring Buildings,TU753
- Ansys and Study of Dynamic Simulation Technology of Construction Process of Up-down Construction Method in Deep Foundation,TU753
- Study on an Underground Retaining Wall to Reduce the Settlement of a Building Near a Deep Foundation Pit,TU433
- The Research on Enterprise Informatization Construction of Hunan Mobile Communication Corporation,F626
- The Research of Reinforcing Design for Pipashan Overflow Dam Lie in Dawen River of Shandong Province,TV652.1
- Study on Settlement of Diaphragm Wall Foundation of Large Span Bridge in Loess Area,U443.1
- Test and Research on Bearing Behavior of Diaphragm Wall Foundation in Loess Area,TU476.3
- The Static Analysis of the Diaphrag Wall and the Discussion of the m Method,TU476
- Numerical Simulation Study on Stress and Deformation of Diaphragm Wall of Earth-rockfill Dam on Soil Foundation,TV314
- Stability Analysis and Safety Monitoring on Anchor Foundations of Underground Diaphragm Wall Structure,U446
- Peter Eisenman 's Graphic Design Practices,J504
CLC: > Transportation > Rail transport > Special railway > Mass Transit Railway > Subway construction , renovation and expansion
© 2012 www.DissertationTopic.Net Mobile
|