Dissertation > Excellent graduate degree dissertation topics show

Treatment Measures for Settlement and Quality Control Standards of Expreeway in Mountainous

Author: WangYuQing
Tutor: WangXuanCang
School: Chang'an University
Course: Architecture and Civil Engineering
Keywords: expressway differential settlement classification of treatment finite element method quality control
CLC: U416.1
Type: Master's thesis
Year: 2010
Downloads: 27
Quote: 0
Read: Download Dissertation

Abstract


In highway construction in mountainous areas, the main form of high embankment fill subgrade and dig deep cutting, and more bridge structures, therefore, Treatment and differential settlement of subgrade under high embankment construction quality control is a mountain highway embankment construction an important part of the process. For the high-treatment measures Subgrade fill the selection method based on experience base in the past, the lack of theoretical basis. Currently used for high fill subgrade compaction quality control methods are more various control method has its limitations, control standards are not unified, construction quality control process of nowhere.In response to these problems, this paper built in Baoding in Hebei Province, Baoding-Fuping Expressway Project, based on the classification of differential settlement Treatment Mountain Highway construction quality control measures and technology research. By differential settlement of domestic and international control measures in highway survey and analysis, subgrade settlement obtained the way to prevent all kinds of application and use of results, and Paul Fu Freeway embankment height, the number of structures, Engineering Geology Division, etc. detailed analysis of the content of proposed insurance settlement Fu Freeway between the main control section of roadbed:at the high embankment, fabric place, excavation and filling junction. The finite element method combined with the growth curve model approach embankment settlement prediction model established, to the construction of the embankment settlement calculation is based on the typical cross-section test section were estimated Settlement after. Depending on the nature of soil, ground compression thickness, embankment height, differential settlement of subgrade grading the subgrade, for different levels of differential settlement to take appropriate treatment measures, the difference will be the final settlement of control target range. Characteristics for high fill embankment, systematic and comprehensive analysis of the current roadbed construction process because of quality problems, combined with field test, the influence of subgrade compaction of construction quality, density, porosity, sedimentation rate and other factors, in-depth studies to determine the high fill roadbed and fill subgrade construction quality control standards, for mountain highway embankment construction quality control of reference.

Related Dissertations

  1. Research on the Structure and Characteristics of Permanent Magnetic Coupling,TH139
  2. Simulation Analysis on Temperature Stress of RCC Arch Dam and Its Construction Joints Design Research,TV642.2
  3. Stability Analysis of Roller Compacted Concrete Gravity Dam Based on Time-history Method,TV642.2
  4. The Antioxidative Efficient Component Recognition for Curcuma Longa L. Based on the Quality Control Pattern of Constituent Knock-out/Knock-in,R285
  5. Research and Design of One Kind of Paper’s QCS That Based on Embedded System,TP368.1
  6. H chemical enterprises cooling loop quality control,F426.7
  7. Study on Dose Verification of IMRT with Film Dosimetry,R815
  8. Research on Intelligent Aerial Bomb for Forest Fire Fighting,S762
  9. Quality Control of Organic Fertilizer and Its Application on Vegetables,S63
  10. Study on Vertical Coordination and Cow Breeders’Quality Control in Nanjing,F322
  11. Studies on Fingerprint Analysis and Total Flavone Extracts of Saussurea Involucrata ( Kar. Et Kir.) Sch.-Bip.,R284.1
  12. The Research on Evaluation of Living Status Systems of Expressway Relocated People,D523
  13. Applied Research of Six Sigma in Quality Control of Butachlor Production Process,TQ457.2
  14. Permeating Calcium Fresh-Keeping Technologies and Production Quality Control of Deepfreeze Strawberry,TS255.4
  15. A Control Chart for Simultaneously Monitoring the Time Interval and Size of an Event,X924
  16. Heping District Library project agent system implementation phase of the project management optimization studies,G251
  17. Dushanzi ethylene plant management research laboratory quality work,F426.72
  18. Yanzhou Mining typical object spectrum database construction and application of,P208
  19. Stugy on Chemical Substance and Quality Standards for Two Traditional Chinese Medicines,R284.1
  20. The Research of PY Fiber Testing Laboratory Quality Control and Improvement,F203
  21. The Research on the Tecahing Quality Management of Shanghai Huawen Colleges by Non-governmental Sectors,G729.2

CLC: > Transportation > Road transport > Road works > Roadbed, pavement engineering > Subgrade
© 2012 www.DissertationTopic.Net  Mobile