Dissertation > Excellent graduate degree dissertation topics show

Study on the Application of TOT Mode in Project Finacing of Chongqing-Fuling Expressway

Author: ZuoYaoGuang
Tutor: ZhaoZuo;SunChuanPing
School: Chongqing University
Course: Project Management
Keywords: Highway Project financing TOT Yu Fu Expressway
CLC: F224
Type: Master's thesis
Year: 2008
Downloads: 270
Quote: 2
Read: Download Dissertation

Abstract


With the growth rate of China's economic development , infrastructure construction and rapid growth . While the rapid development of highway construction , transportation infrastructure investment costs are also on the rise. Due to the contradiction between the demand for infrastructure construction funds and government fiscal capacity limitations and insufficient investment in the increasingly noticeable with , as well as simultaneous government in the construction of public projects of high investment , high consumption and low efficiency of the characteristics , urgently requires reform the basis of facilities investment and financing system , opening up the field of infrastructure , encourage the participation of private capital in infrastructure construction . In this case , some places began to learn from successful international financing , the introduction of foreign capital and private capital to enter the field of infrastructure construction , in order to make up for the lack of financial funds , which TOT financing is one of them . TOT as a financing mode after testing in a foreign country , and has the following advantages : First , the the TOT financing involves only the transfer of operating rights to build infrastructure projects , there is no assignment of property rights, equity and avoid unnecessary disputes and disputes . Second, to reduce the pressure on government finances , and promote the transformation of the investment system . And third, to make an inventory of the stock of state-owned assets , increasing the value of state - owned assets ; raise funds for new infrastructure , speed up infrastructure construction , our country, especially the west ; improve infrastructure operations management efficiency , improve the quality of the products of the project . Fourth , the risk is small project fund and a high success rate . Fifth, the project cost and project a relatively low price . Sixth by institutional factors is less restricted , to facilitate foreign investment and domestic private capital in infrastructure and state-owned investment . Yuzhong Fu Expressway TOT financing model , Chongqing Highway Development urgent demand , improve the Chongqing infrastructure management level needs , facilitate the proper guidance and take full advantage of the non- state investment . The project by TOT financing mode , the recovered funds to alleviate the shortage of capital construction projects . Make an inventory of the assets of the Chongqing urban infrastructure stock , take full advantage of the the city operating assets financing has opened up new avenues of city management .

Related Dissertations

  1. The Research on Comprehensive Budget Management of Highway Operation Management Units,F540.58
  2. The Research on Evaluation Method of Highway Ecosystem Healthy,X826
  3. Study on the Quantified Model of Public Participation in Highway Environmental Impact Assessment,U41
  4. Study on the Internal Control Issues of Highway Construction Investments,F540.34
  5. Research on Agent Construction System Management Model of Highway Project,F283
  6. Project Financing in Tourism Resources Development Application,F283
  7. Research on the Feasibility of Highway Construction Project,F542
  8. Research about Standardized Design of the Integrated Building at the Highway Service Area,TU248
  9. Research on Heilongjaign Expressway Netowrk Operation and Management,F542
  10. Highway Construction Enterprise Dynamic Responsible Cost Evaluation System Research Based on the Activity-based Costing and Earned Value Measure in Our Country,F406.72
  11. The Financing Research of Thermoeletric Generator Project (2x30 Million Kilowatts) in Datang LuBei Power Generation Co-operation,F426.61
  12. Research and Implementation of the Design-supporting System for Highway Emergency Rescue Based on ArcEngine,U492.8
  13. Study of GPS RTK Application in Highway Design and Layout Survey,U412.2
  14. Research on the Development Strategy of Freeway Passengers’ Transportation in Guizhou Province,F542
  15. Study on the Highway Construction Project Budget Planning,TU723.3
  16. Guangdong Provincial Expressway Inter-regional Traffic Security Management,F542
  17. The Cost Study on Reconstruction and Extension of FS Highway,U415.13;TU723.3
  18. The Research of Management to Limit of Vehicles Overload in Guangdong Province,U491
  19. Based on the Ultra Low Power Dual Frequency Traffic of Highway Ambiguous Path Identification Application,U495
  20. Optimal Performance Evaluation System of Z Highway Maintenance Center,U418.2
  21. Research on the Safety Evaluation and Safety Management Technology in Highway Widen Project,U492.8

CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net  Mobile