Dissertation > Excellent graduate degree dissertation topics show

Sliding Construction in Long-Span Steel Truss Structure

Author: LiuWeiLiang
Tutor: YaoGang
School: Chongqing University
Course: Structural Engineering
Keywords: Span Steel truss Slippage Tire Rack
CLC: TU758.11
Type: Master's thesis
Year: 2001
Downloads: 325
Quote: 8
Read: Download Dissertation

Abstract


With the recent large-span building in our wide range of applications , the appropriate construction techniques and technology has been rapid improvement and development . In this paper, the construction technology matures summarized theoretical , technical issues relating to explore further analysis , in order to promote the application of advanced process engineering methods to improve the technical level of construction enterprises and the overall industry technology content. Firstly, from the meaning of the concept of large-span structures start with a brief introduction of the common forms of large-span structures , commonly used materials , development and application . Combined with large-span steel structure of the various forms , such as flat trusses, truss , shell , etc., discussed the general outline of the construction method , processes and techniques , including the overall lifting method , the overall jacking method, enhancing the overall method, altitude bulk method , sub-unit method and the lifting height sliding method . Second, commonly used for large- span steel truss system , devoted to its form , materials , construction, and China's current development . A common space for the current truss system , discuss Sliding Construction of the truss , more systematic exposition of the method of construction of slip lifting and transport solutions , construction layout, structural assembly, transportation, stacking and cell division , rail system layout , track settings, tire architecture made ??, traction control , and many other equipment and process problems . Then one of the key issues for further discussion, including a summary of Sliding process ; tire rack on the selection of reference scaffolding calculations, the use of specifications, software programs , three methods of analysis of characteristics , with the existing scaffolding comparative analysis of test results , arrive at a more realistic tire rack capacity value ; slip process for automatic control and dynamic and static control monitoring has made application analysis and theoretical discussion . And use the above theory, discusses the construction of the airport in Shenzhen slip France ( structural slip ) , Shenyang Airport ( tire rack slip ) and other major engineering application typical example .

Related Dissertations

  1. Seismic Analysis of Three-Span Cantilever Beam Viaduct with Pounding Effects and Restrainers,U442.55
  2. Study on Attention Characteristcs of Chinese Paralympic Table Tennis Players,G846
  3. The Effects of Abacus-based Mental Calculation Training on Child Intelligence and Other Traits,B842.3
  4. The Large Concrete Hydration Heat Temperature Effects Research of the Cable Stayed Bridge,U441.5
  5. Analysis on Unloading of Large Span Steel Structures and Research on Its Mechanical Analysis,TU391
  6. Verification and Application of Wind Characteristics Measurement System on Long-span Structures,TU317
  7. Study on Safety Risk Appraisal of Large-span Cable-stayed Bridges Construction,U445.1
  8. Study on Bionic Wrinkled Ring-web Shells Based on Dragonfly Wings,TU399
  9. Large span structural health monitoring system,TU399
  10. Span steel arch structure seismic performance of,TU352.11
  11. - Span continuous rigid frame bridge ultimate bearing capacity and wind resistance research,U441.3
  12. Small and medium span bridges the live load design standards of the high-speed rail,U442
  13. Railway pier, span , long associated girders bridge CWR Longitudinal Stiffness of Piers optimization,U448.13
  14. Dongjiang Bridge Stiff Suspension Reinforced steel truss construction technology research,U445.4
  15. North Jiangqiao Cheng bridge and construction process force performance analysis,U448.27
  16. Dynamic characteristics of large - span steel box tied arch bridge and train running performance analysis,U441.3
  17. The Lee Ka Chong large span tunnel with the overlying high - voltage transmission tower mutual impact analysis,U451
  18. Study for Structure System and Structure Performance of Curve Extradosde Cable-stayed Bridges in the Mountains,U448.27
  19. Study on Response and Shock Absorption Measures for Long-Span Bridge under the Long-Period Ground Motion,U442.55
  20. Study on the Dynamic Response of Double-deck Steel Truss Bridge under Moving Vehicles.,U441.3
  21. Research of Calculation Method on Self-anchored Suspencion and Cable-stayed Bridge with Three Towers,U448.25

CLC: > Industrial Technology > Building Science > Construction > The project and the type of work > Installation works > Housing structure installation > Installation of metal structures