Dissertation > Excellent graduate degree dissertation topics show

Rock Mass Quality Classification And Engineering Effect Study of Complicated Rock Mass at The Right Dam Foundation of Nuozadu Hydraulic-Power Station in Lancang River

Author: WenZhiBing
Tutor: LiYuSheng;WangShiTian
School: Chengdu University of Technology
Course: Geological Engineering
Keywords: Nuozadu hydraulic-power station complicated rock-mass Yakouhoushan quaquaversal dome rock-mass quality classification engineering effect rock-fill dam gravity dam
CLC: TV223
Type: Master's thesis
Year: 2002
Downloads: 196
Quote: 1
Read: Download Dissertation

Abstract


Nuozadu hydraulic-power station will be built in Lantsang river in Yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5,600,000 kilowatt. Past investigation found the rock in the right dam foundation composing of granite(γ43~γ51) in dyas- trias,which has a very complicated mechanical environment. The complicated phenomenon is as follows: tectonism, alteration, rock mass demobilize, rock mass stress release and other factors. Because of this several weakness rock zones and a loosen rock mass zone are develop in the right dam foundation. Hereby, a study on the mechanical genesis ,rock mass quality and engineering effect of the complicated rock mass is very important. Base on site investigation and abundant past achievement, we carefully studied it and draw some conclusions.The mechanical genesis of the complicated rock mass is because several times of tectonism in pro-period made the structure of rock mass in the right dam foundation damaged seriously and rock mass alteration made its mechanical character more anisotropy. After that the fractures in the right dam foundation slope were stretched at the beginning of the Quaternary Period because in the period Yakouhoushan mountain quaquaversal dome was blowups quickly. At the same time, the valley trenching of Lancang River reach to 800-1000 meter in altitude at the right bank in Nuozadu dam site. This two reason accelerated the groundwater infiltration in the right bank slope. So, the weathering agency could have invaded deeply in the right bank slope. After long-term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being.The adjoining rock engineering geological classification of water -conservancy and hydraulic-power project reconnaissance code (GB50287-99), geomechanic system (Bieniawski,1973), rock mass quality index Z (Xiaowang ,1995), artificial neural network and field classification were used in the rock mass quality classification. A evaluate system relative to the rock mass mechanism of the complicated rock mass was achieved finally. The result of rock mass classification reflected that the rock mass quality is relative compactly to the mechanical genesis of the complicated rock mass.In the last part of the thesis a study of engineering effect about the complicated rock mass was done base on a numerical simulation and the engineering geological condition in the dam site. Numerical simulation result reflect several disciplinarian of stress-distortion action in the right bank slope. Firstly, today’s right bank stress field mainly is grave stress field. Secondly, because of strong stress release in the flat of the slope, there has a high grads zone. After the engineering slope wasdug, several small plastic zone the designed rock-fill dam will coming in the temporary slope, because rock-fill dam change the stress field on a small degree. But a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem.After detail and depth study ,the rock-fill dam project is more compatible of the engineering geology condition in Nuozadu hydraulic-power station’s dam site.

Related Dissertations

  1. Stability Analysis of Roller Compacted Concrete Gravity Dam Based on Time-history Method,TV642.2
  2. Computation and Analysis of Stress and Strain on Ertanggou Asphalt Concrete Core-wall Rockfill Dam on Deep Overburden,TV641.41
  3. Rockfill dam of a reservoir prototype observation data analysis and safety evaluation,TV698.1
  4. Study on Traffic Simulation and Optimization for Lianghekou Hydropower Station,TV512
  5. The Safety and Stability Analysis of the Earth-rockfill Dam Based on the Excess Pore Water Pressure Caused by Seismic Force,TU43
  6. Analysis of Stress-strain on Kensiwate Concrete Face Rock-fill Dam,TV641.43
  7. Research on Visual Simulation of Face Rockfill Dam Construction Process,TV52
  8. Study on Allocation of the Balance System and AutoCAD 3-Dimensional Design Optimization on a Pumped Storage Power Station,TV541
  9. Research on Earth-rockfill Dam Safety Assessment Method and System Development,TV698.2
  10. The Analysis of the Anomaly of Seepage of the Renzonghai Rock-fill Dam at the Initial Water,TV223.4
  11. Experimental Study on Conditions Inducing Expanding and Self-healing of Core Cracks in Earth Rock-fill Dam,TV641
  12. Zoning Optimization and Nonlinear Numerical Analysis of CFRD Structure,TV641.43
  13. Study on Displacement Monitoring Model for Faced Rockfill Dam during Construction,TV698.1
  14. Analysis of Stress and Deformation for Concrete Faced Rockfilll Dam by FLAC3D-based Redevelopment,TV641.43
  15. Influence of the Core-wall Structure on Seismic Prevention for Earth Rock-fill Dams,TV312
  16. Study on Infiltration Discipline and Leakage Mechanism of Earth-rockfill Dam,TV641
  17. Research on the Mechanism of Seismic Wave Input about High Rockfill Dam,TV312
  18. 3D-FEM Analysis and Anti-seismic Safety Evaluation for High Core-wall Rockfill Dam,TV312
  19. Research on Parallel Computing of Concrete-faced Rockfill Dam,TV641.4
  20. Safety Analyzing of Dams of the Upper and Lower Reservoirs at Tongbai Pumped Storage Power Station,TV64

CLC: > Industrial Technology > Hydraulic Engineering > Hydraulic investigation of hydraulic design > Foundation and its reinforcement
© 2012 www.DissertationTopic.Net  Mobile