Dissertation > Excellent graduate degree dissertation topics show
Xiaolangdi project owner Contract Management Case Study
Author: ZhouTianEn
Tutor: XuYuSen
School: Dalian University of Technology
Course: Business Administration
Keywords: International Engineering Contract Management FIDIC Claimant
CLC: F426.9
Type: Master's thesis
Year: 2005
Downloads: 854
Quote: 2
Read: Download Dissertation
Abstract
|
Xiaolangdi Water Control Project is a national \In accordance with the Bank's requirements, engineering has introduced a the FIDIC management mode, according to the requirements of FIDIC international bidding and the implementation of the project the owner responsible for the project supervision system, strict engineering contract management. Contract management work, because Xiaolangdi huge scale of the project, the complex geological conditions, and contractors are international well-known veteran company with more than a hundred years contract management and claims experience, so in the Xiaolangdi contract implementation process encountered many contract issues, The contractor made a lot of changes and claims event, which is unprecedented in the domestic construction, with a typical representative in the international engineering contract management. There is a lot you can learn from something collate and summarize the international contract management of the project. This article describes the Yellow River Xiaolangdi Water Control Project International construction contract management system and its implementation, focusing on its international tenders under the FIDIC template contract organizations, contract implementation and contract handling the incident. Case based on the analysis and discussion of the pros and cons of the Xiaolangdi Dam Project Contract Management. This paper is divided into case descriptions and case studies of two parts, case studies section summarizes the successful experience of the Xiaolangdi Project contract management, including of pragmatic contract management system, to make changes to deal with an objective and impartial manner, strict and efficient claims processing system files management, prudent specify the subcontractors and other. Xiaolangdi Project Contract Management obvious inadequacies, including the prevention of the risk of the contract is not enough, risk control in the process of contract management is not strong enough, the lack of flexibility and initiative, and several other specific issues of contract processing. Compared with the traditional domestic construction contract management, due to the difference in the relationship between participants and participants of the contract, construction contract management reflects a more systematic and greater complexity. The two most important aspects of the international project owners for Contract Management in the contract itself and a means of disposing of the specific contract events. On the basis of this article in the Yellow River Xiaolangdi water conservancy hub project construction contract management case analysis of the combination of international, domestic other international engineering, construction contract management practices and consequences, the characteristics of China International Engineering Management of specific contractual event processing forward-looking to put forward a in principle, expectations can play a valuable role to improve the management of international construction contract.
|
Related Dissertations
- Personnel Training System,F426.92
- Based on workflow technology of large enterprises Contract Information Management System Design and Implementation,TP311.52
- Ontology-based document management system BIM environment research,TP391.1
- Cross-culture Risk Management on International Engineering Contract Projects,F752.68
- SEI International EPC Management Model Strategy,F426.22
- A Tentative Study of Chinese Contractor’s International Business Communication Practice: An Intercultural Perspective,G04
- Study on the Whole Process Cost Management System of International Project Based on BQ,F284
- Study on Target Selection of Strategic M & A of International Contracting Company,F416.92
- International Construction Project Claim Opportunity Identification Research Based on Process Controlling under FIDIC Contract Condition,F284
- Study on Bidding in International Cement Engineering,F284
- Inernational Project Implementation Phase of the Security Management Research,TU714
- Research on the Legal System of Construction Supervision in China,F284
- Research on Contract Risk Management in International Contracting Project,F284
- Research on Construction Contract Application and Claims,F284
- Study on the Contractor’s Risk Response Strategies under the Fixed-price Contract,F284
- The Study of Implementation of DBO in Chinese Infrastructure Construction,F284
- The Research for the Completed Final Estimate Audit of the Constructive Project Items,F284
- The Research of Design Management of the International Power Plant EPC Project,F416.61
- The Theoretical and Empirical Reasearch on Project Sustainability Management,F284
- Research on the DAB Dispute Solution in FIDIC Contract Conditions,F284
- Analysis on FIDIC Contract Features in Terms of Functional Stylistics,H05
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy