Dissertation > Excellent graduate degree dissertation topics show
Numeric Analysis on the Settlement and Stability of High Fill Embankment under Special Load
Author: ZhangXin
Tutor: LiXiaoQing
School: Huazhong University of Science and Technology
Course: Geotechnical Engineering
Keywords: High fill embankment Special load Settlement Tamping method Numeric analysis Strength reduction FEM
CLC: U416.12
Type: Master's thesis
Year: 2005
Downloads: 266
Quote: 4
Read: Download Dissertation
Abstract
|
Embankment is main structure format of road engineering roadbed. The process of construction and quality of completion are of critical importance for service quality、traffic safety、maintenance、operation economic of entire road. Compared with other kinds of roadbed, high fill embankment has the characteristic of larger settlement、longer ultimate settlement time, and it requires higher ground carrying capacity. So the research has important practical significance. On ground of 118 entrance road project of Hankou Air Force new airport, this thesis employees a method of combined theoretical and numerical analysis, analysis the process of soft base、procedure of fill roadbed、stability of embankment under special load. Firstly, by indoor experiment and field observation data, a finite element analysis model of high fill embankment is built. Making use of a great finite element analysis software ANSYS, settlement deformation of roadbed can be predicted. Through analysis and comparison, reasonable base process scheme can be recommended. Then research various kind of degree of compaction and fill thickness, find best construction technique of high fill embankment. By dynamic finite element method analysis to what extent using tamping method to process embankment can reduce non-uniform settlement. Furthermore, once embankment is filled, it will immediately be a place for pre-cast beams, then analysis will be made to evaluate whether this site satisfy the demand of pre-cast construction and vehicle passage. Finally, analysis special road with complicated geology condition and stability of slope by strength reduction FEM, testify whether this process method meet need. Through finite element analysis, foundation treatment and embankment fill scheme can be optimized, pre-cast site satisfy the demand of production, And it insure project can be safely、efficiently finished, save much time for construction units, and create favorable economic and social effect.
|
Related Dissertations
- Study on the Settlement Law of Ground Surface Due to Shield Construction of Shenzhen Metro No.1 Line,U455.43
- Research on the Office Development Project with the Whole Life Cycle of Cost Management,F293.3
- Gansu Branch of China Construction Bank Promote the Study of No Cash Management,F832.2
- Study on Subsoil Settlement and Numerical Simulation of Eolian in West LiaoNing,U213.1
- The Research on Track Irregularity Caused by Settlements of the Light-rail Bridge Pier,U213.2
- Research and Application of Shallow Vacuum Preloading to the Foundation of New Reclamation at Central Fishing Port,U655.54
- A Study on Regional Settlement Pattern Language in Hetian District, Xinjiang Province,K928.5
- Research on Adaptability and Durability of Asphalt Pavement Structure in Permafrost Areas,U416.217
- Ballastless track high-speed railway CFG pile - raft composite foundation settlement calculation,U213.1
- Research on the Improvement of Elite Athletes Social Security System of Zhejiang Province,G812.7
- Analysis of Settlement of Deformations in Dynamic Compaction Foundation and Pile Foundation under Largescaled Oil Tank,TE972
- A Research about Measuring the Scale of the Ipd Which Is Applying to Compensate by Public Finance,F812
- Study on Marriage Viewpoint Changes befor and after Settled Down of Yugu Herd,D669.1
- A Study on Several Management Questions of BEIEC’s Restructuring,F426.92
- The Sociological Research on Peasant’s Way in Settling the Rural Dispute,C912.82
- Research on the Status of Information Contact and Urban Integration of the Migrant Workers in Two Different Residential Models,G206
- British family settlement system,DD912.3;DD913
- Study on the Dispute Settlement Mechanism of China-Asean Free Trade Area,D996.1
- The Study of Legal Protection on RMB Cross-Border Settlement,D922.28;F832.6
- China - ASEAN Free Trade Area of ??the dispute settlement mechanism research,D996.1
- Research on Trade Retaliation Mechanism of WTO,D996.1
CLC: > Transportation > Road transport > Road works > Roadbed, pavement engineering > Subgrade > Embankment
© 2012 www.DissertationTopic.Net Mobile
|