About 1911 item dissertation in line with U21,Railway Line Project query results,the following is 1 to 50(Search took 0.017 seconds)
- Research on Risk Management of China Railway25Bureau of Luoyang-Zhanjiang Railway Line Section of ZH-1Yongzhou Lot Construction Contract,WuJiLiang/Hunan University,0/11
- Research on the Compaction of Rock-Filled Embankment Technology to Railway,ZhengMiMi/Southwest Jiaotong University,0/8
- Study on Continuous Compaction Quality Control of Rock Fill Embankment,DuanLiQiang/Southwest Jiaotong University,0/9
- Structure Design and Optimization of Automatic Rail Wall Grinding Machine,ZhangXinZhong/Northeastern University,0/3
- Structure Design and Dynamic Characteristics Analysis Study on Rail-wall Grinding Machine,WangQiuYu/Northeastern University,0/2
- Demonstration of Source Function Inversion of Vibration Caused by Urban Rail Traffic,ZhengZuo/Harbin Institute of Technology,0/76
- Study on Loess Collapsibility and Potential Erosion of New Railway in Shanxi Province,LuoQiBin/Northwestern University,0/19
- Dynamic Response of Warm Permafrost Subgrade under Train-induced Dynamic Loads,FengYue/Harbin Institute of Technology,0/40
- Stability Analysis and Construction Sequence Optimization of Deep Cutting Subgrade Slope in Bazhun Heavy Haul Railay,WangJiaHui/Harbin Institute of Technology,0/27
- Analysis of Stability and Prediction of Dynamic Permanent Deformation on High Emembankment of Bazhun Heavy-haul Railway,LiYuFang/Harbin Institute of Technology,0/46
- Research on Freeze-thaw Collapse of Cutting and Bridge Transition Section Embankment Slope in Seasonal Frozen Area,ChaiYanFei/Harbin Institute of Technology,0/50
- Heat Damage Effects of Steam Curing on Concrete and Corresponding Improvement Measures,HeZhiMin/Central South University,0/81
- Research on Application of CFG Pile in Soft Foundation Treatment,ZengZuo/Chongqing Jiaotong University,0/32
- Research on Indoor Experiment and Construction Technique of Cement Reinforcing Collapsible Loess Railway Foundation,YuHuai/Chang'an University,0/8
- The Vertical Dynamic Response Analysis of Different Track Types Based on SIMPACK,SuShangXu/Central South University,0/45
- Research on Incentive and Restraint Mechanism of Railway Project Management,TangGuang/Central South University,0/27
- Study of Fuzzy Comprehensive Evaluation Model and Evaluation System in Maturity of Safety Management of High-speed Railway Construction,JiaXiaoBin/Central South University,0/31
- Research on Standardization Management of Railway Project,KangYiZhuang/Central South University,0/26
- Research on Coordination Mechanism of Railway Project Management,WuXiaoZuo/Central South University,0/25
- A Study on Governing Factors of Railway Project Quality Management,ShengJianGong/Central South University,0/32
- Based on the SIMPACK and ANSYS Subgrade CRTSI Slab Track Train Running Safety and Comfort in Reliability Analysis,LiYuXiang/Central South University,0/43
- Analysis on Stability of CWR with the New Type Wheel Protection Railroad Rail Facility on Minor Radius Curve,KeRuiYong/Central South University,0/20
- Study on Safety Management of Railway Project Based on Accident-Causing Theory,ChengZuo/Central South University,0/32
- Study on Cost Control of Railway Project Based on Activity-Based Costing Method,XiaoJuan/Central South University,0/23
- Welded Rail Base Location Comparison Research,AoHong/Central South University,0/1
- Reliability Analysis for the Safety and Comfort of High-speed Train Moving on CRTS Ⅱ Track Plate Lay on the Bridge,WangFuWei/Central South University,0/13
- The Space Force and Deformation Analysis of the CRTS Ⅰ Slab Ballastless Track on Subgrade,LiuXiangMing/Central South University,0/29
- The Project Management Maturity Research on the Railway Project Schedule Management,LiPan/Central South University,0/17
- The Application of ADAMS/Rail on Dynamic Simulation Analysis of the High-speed Train-track(Turnout) System,HeYi/Central South University,0/21
- Research and Practice on Railway Construction Duration and Cost Simulation,WangKaiJun/Central South University,0/18
- Research on Flood Season Railway Roadbed Risk Analysis Based on Extenics Theory,YuJia/Central South University,0/8
- Pan Jin Area Beneath Existing Railway Bridge and Culvert in Soft Soil Subgrade Treatment Effect,ZhangPeng/Shenyang University of construction,0/26
- Research on the Foundation Pit Precipition of Jin-yu Road Underpassing Jin-shan Railway,ZhengRongZheng/Hebei University of Technology,0/23
- Study of the Rail Wear Measurement Method Based on Dynamic Template,AnXiaoXue/Shanghai University of Engineering Science,0/3
- The Research on Railway Bolts Detection,MaZuo/Beijing Jiaotong University,0/33
- The Research of High Speed Railway Subgrade Compaction Quality Testing Method and Control Index,ChenChao/Nanhua University,0/5
- Research on Responsibility Cost Management of Railway Project,MeiRenJun/Tianjin University,0/4
- The Control Criteria and Engineering Exploration of the Railway-bridge Transition Section Along the Line of Nanjing-Qidong,LiuWei/East China Jiaotong University,0/3
- The improved BP algorithm in the application of grey neural network model to study the settlement prediction High-speed Rail,WangFuZuo/Jiangxi University of Technology,0/133
- Preliminary Study of Existing Urban Railway Soundproof Tunnel Design,DingPeng/Central South University,0/17
- The Beijing-Shanghai High-speed Railway Project Risk Management Based on the Whole Life Cycle,ChenZuo/Hebei University of Engineering,0/2
- Parametric Study of Wheel/Rail Contact,QiChenHui/Huazhong University of Science and Technology,0/9
- Network Characteristics and Vulnerability Analysis of Chinese Railway Network,JiangJuan/Huazhong University of Science and Technology,0/27
- Detection Technology Research of Rail Thermal Stress of High-speed Railway,JiXiaoLi/Nanjing University of Aeronautics and Astronautics,0/8
- Research on Standardization of Valuation System of the Bill of Quantities in Guiyang Urban Rail Transit Project,AnZuoZuo/Tianjin University of Technology,0/1
- Research on Decision-Making Mechanism of Railway Project,JiangBo/Central South University,0/12
- The Research on Processing and Analysis of Ultrasonic Flaw Signal of Rail,YuWei/Harbin University of Science and Technology,0/21
- Experimental Research on the Mechanical Performance of Ballastless Track Slabs and Optimization of Two-layer Two-way Pre-tensioned Prestressing Ballastless Track Slabs,ShiYuanYuan/Tsinghua University,0/7
- Study on Safety Management for Rail Construction Project Based on Fuzzy Evaluation Method,LiuYing/Southwest Jiaotong University,0/11
- Stress Analysis of Railway Internal Locking Device and Removable Heart-rail Frog Points,LiuYuGuang/Xi'an University of Architecture and Technology,0/9
Total 39 Pages First Previous 1 2 3 4 5 6 7 8 9 10 Next Last
© 2012 www.DissertationTopic.Net Mobile
|