Dissertation 

About 1911 item dissertation in line with U21,Railway Line Project query results,the following is 51 to 100(Search took 0.092 seconds)

  1. The Research on Cost Control of General Speed Rail Lines for Overhual Project,XuShouSheng/Hunan University,0/22
  2. Study on Foundation Reinforcement and Subgrade Post-construction Settlement Control Technologies for Ballastless Track of High Speed Railway,ChenShiQi/Hefei University of Technology,0/60
  3. Dynamic Response and Long-term Dynamic Stability of Closely Spaced Transition Sections Subgrade for High-speed Railway,QuChangZi/Central South University,0/199
  4. Design and Implementation of Rail Flaw Detection System,JinPeiFeng/Hunan University,0/57
  5. The NDT Methods and the Application Research of NDT Methods in Rail Flaw Detection,LiZhenWu/Hunan University,0/68
  6. The Design of Monitoring System of Tamping Machine on XPE Flat,ChenYanFang/Hunan University,0/18
  7. Research on Fatigue Performance of High-speed Railway Track Connector,LiHuaRong/Wuhan University of Science and Technology,0/38
  8. Research on the Subgrade Settlement Site Testing and Theoretical Calculation of High-speed Railway,LiuZhao/Chang'an University,0/52
  9. Study on Collapsible Loess Characteristics and the Compaction Pile Treatment Effect of Loess of Xibao Passenger Dedicated Line,WangJiQing/Chang'an University,0/18
  10. Study of CPⅢ Control Network Precision Control and Data Processing Methods,LiJianPing/China University of Geosciences,0/14
  11. Evolutionary Game Analysis on the Management of Railway Construction Project,LiJuanJuan/Northwest Normal University,0/14
  12. A High Rock Slope's Stability Calculation and Back Analysis of Mechanical Parameters,XuZuo/Central South University,0/29
  13. The Numerical Simulation of the Impact of Water on the Stress State of the Porous CA Mortar,WangChuanYan/Central South University,0/7
  14. Study on the Anchor Support and the Stabilty of Consequent Bedding Rock Slope,BaiHan/Central South University,0/34
  15. Research on Grinding Force Fluctuation Suppression Methods of Rail Grinding Train,TangWanWen/Central South University,0/23
  16. The Analysis and Evaluation of Construction Quality Risk of High-speed Railway,LiuJianNing/Henan University of Science and Technology,0/15
  17. Study on the Limit Value of Vertical Angle of Rotation of Beam-end on Ballastless Bridge with Transition Track,LinLiKe/Central South University,0/2
  18. Research and Design of Track Geometric Status Inspection System Based on FPGA,HeYongFu/Central South University,0/26
  19. Research on the Hydraulic System for New Ballast Distributing and Profiling Machine,WangYu/Central South University,0/10
  20. Study of the Effect of Cement Asphalt Mortar Disease on Mechanical Properties of CRTS Ⅱ Slab Ballastless Track,ZhangGuangYi/Central South University,0/29
  21. Study on the Differential Settlement of the Mountain Slope Subgrade in Passenger Dedicated Line,HeYong/Central South University,0/13
  22. Theoretical Study on Settlement and Deformation of Pile Groups of Beijing-Shanghai Express Railway,XuQingGuo/Central South University,0/12
  23. Characteristization of Pore Structures of Hardened Cement-asphalt Pastes,CaiFengLiang/Central South University,0/27
  24. Monitoring and Analysis of SC325Turnout,MaoKunHai/Central South University,0/13
  25. Research on the Bearing Capacity and Settlement Property of Hooded Single Pile and Pile-raft Composite Structure Beneath the High-speed Railway Beds,ZhangMing/Central South University,0/17
  26. Design of Batching Control System for Asphalt Cement Truck,YangLiLi/Central South University,0/7
  27. A Study on the Sealing Materials for the Cracks in CRTS Ⅱ Type Slab Track Structure,WangShiXiong/Central South University,0/19
  28. Study on Disease Mechanism and Control Measures of Subgrade Bed Diseases for Existing Railway,MaShuiSheng/Central South University,0/69
  29. Research on Synthetical Engineering Test and Evaluation of Existing Railway Speed-Up,WangRiHui/Central South University,0/15
  30. Research on the Key Technology of Coarse-grained Filler in High Embankment of the High-speed Railway,JiaLiHao/Central South University,0/27
  31. The Analysis on Dynamic Characteristics of Longitudinal Connected Ballastless Track on the Curved Bridge,GuoLiDan/Central South University,0/15
  32. Research on Tensile Creep of Double-Block Ballastless Track Slab Concrete,LiJun/Central South University,0/7
  33. The Research on Character of Transition Section in Overloading Sideways Passing the Dam,MaJun/Central South University,0/3
  34. Study on Improvement Measures of the Beam End Deformation Allowable Value Based on Ballastless Track Static Properties,YangLu/Central South University,0/12
  35. Interaction between Simply Supported Beams and CRTS Ⅱ Slab Ballastless Track,ZhuQianKun/Central South University,0/47
  36. Analysis of Train-Track-Bridge Coupling Vibration Based on Parallel Computing and Finite Element Method,ZhuYuLong/Central South University,0/25
  37. Design Studies on the Track Rubber Pad Used for a Dedicated High Speed Passenger Line,ZhuJiangNan/Central South University,0/27
  38. Research on Railway Engineering Geology Survey System Based on Google Earth,YangXinLin/Central South University,0/62
  39. Technology and Implementation of High-speed Railway Track Geometry Detection,PanLiang/Central South University,0/72
  40. The Timely Rail Control System Which Maximize the Performance of Work Area,FuYiChao/Central South University,0/14
  41. The Design of Rail Milling Train Grinding Equipment and the Research of the Grinding Force Control,LiuZhenBing/Central South University,0/42
  42. Dynamic Impedance Analysis of Single Pile in Inhomogeneous Soil,ZouZhiMing/Central South University,0/11
  43. The Study on Characteristics of Railway (Highway)Subgrade Scoured by Mountain Torrents and Evaluation of Anti-erosion Level,LuYao/Central South University,0/34
  44. Research on Railway Line Intelligent Optimization Method in Three-Dimensional Space Based on the Improved Genetic Algorithm,LongXiAn/Central South University,0/43
  45. Mechanical Characteristic Research of CRTS Ⅰ Slab Ballastless Track,LiangFei/Central South University,0/25
  46. Analysis of Switch Machine Crack Fatigue Life,ChenXiaoZuo/Xi'an University of Architecture and Technology,0/25
  47. The Performance Assessment Research for the Construction Project of XX Railway Bureau during the Construction Phasebased on the Balanced Score Card,LiuKeQiang/Xi'an University of Architecture and Technology,0/11
  48. The Research and Application of Schedule Mangement in Tender Documents Compilation of Urban Rail Traffic Signal System,ZhangZhiQiang/Shanghai Jiaotong University,0/16
  49. Research on Precision,Measurement, Reconstruction and Optimal Adjustment of Raising Speed Railway,ChenFeng/Central South University,0/76
  50. Research on Automatic Detection of CPⅢ of High-speed Rail Based on Two Line Scan CCD Cameras,XieZuoYuan/Chang'an University,0/23

Total 39 Pages First Previous 1 2 3 4 5 6 7 8 9 10 Next Last

© 2012 www.DissertationTopic.Net  Mobile