Dissertation > Excellent graduate degree dissertation topics show

The Value Engineering Analyses of the Cost Risks for the General Contract for the Olympic Stadiums Projects

Author: ChaJinBao
Tutor: ChenXian
School: Beijing University of Chemical Technology
Course: Technology Economics and Management
Keywords: Value Engineering Olympic Stadiums cost risk general contract risk analysis
CLC: F224
Type: Master's thesis
Year: 2007
Downloads: 367
Quote: 0
Read: Download Dissertation

Abstract


At the beginning of the Olympic Stadiums projects, we pursue the scaleinvestment, modern style and special art, which leading to the great cost funds,also highlight the cost risk of the general contracts in the Olympic Stadiumsprojects. It is the core studying content of this paper that how to use the VE forreducing the cost of the Olympic Stadiums, while enhancing the value andlessening the cost risk of the contract companies for the Olympic Stadiumsprojects.Firstly, this study which combining of two-dimensional variableweights risk assessment model and Risk Analysis has been improved by Valueengineering evaluation program into the evolution of the technical value,economic value and social value of three-dimensional multi-target integratedproject risk assessment model.Secondly, the general contracts of the Olympic Stadiums many sorts offorms and complex risks. In this paper, we emphasize discuss on an analysisof representative of the National Stadium for Joint Venture contract under the special model, also analyzing the cost-risk under the special contract model indetail, combines value engineering analysis and program evaluation foranalyze how to reduce cost-risk. Detailed analysis of value engineering applythe life cycle cost to the entire process in Olympic stadiums, from the designand decision-making stage to the construction stage and operation stage afterthe match, the whole process should be stage use. It provides theoretical basisand effective measures how to reduce the settlement risk of the total contractcosts and improve value of the Olympic stadiums.Finally, for Olympic stadiums and general contracting costs IntegratedRisk Assessment Model, its conclusions conform to the Frugal OlympicsAction: cost risk of the Olympic stadiums is the vital important, but payattention to the risks to the economy should also take into account thetechnical risks and social risks. The results indicate that the model has sometheoretical and practical significance, which are equally applicable to otherlarge projects’ cost-risk analysis.

Related Dissertations

  1. Key Technologies of Dam-break Life Loss Risk Assessment Research,TV122.4
  2. A Research on Functional Upgrade of Tourist Real Estate Based on the Value Engineering,F592
  3. Application Research in Stock Selection and Optimization Strategies of Portfolio Investment,F830.91
  4. Urban Infrastructure Investment Performance Evaluation Index System,F224
  5. Automotive Electronic Control R \u0026 D Project Risk Management,F426.63
  6. Value Engineering Theory in complex electromechanical products Design Research,TH122
  7. Integration of IE and VE: The Comparison Research of Continuous Improving Methods,F424
  8. Real Estate Investment Risk Analysis,F293.3
  9. The Cost Control Study in Planning and Design Stage of Real Estate Project,F293.33
  10. On the Value Orientation in the Ideology Domestic Brand Clothing Design,F426.86
  11. To urban green space planning , economic evaluation index system of,TU984.18
  12. The Value Evaluation Analysis of the Sports Project,TU245
  13. Based on Value Engineering Thermostatic Mixing Valve R&D and Nationalization,TU832
  14. Xuchang Vocational and Technical College Gymnasium Project Cost Control,TU723.3
  15. Research on the Evaluation of Building Energy-saving Based on the Improved Value Engineering Method,F206;F224
  16. Research in the Control Strategy Evaluation of the Whole Process Cost Management of the Highway Construction Project,F284;F224
  17. Cost Engineering Research of Space Age Photonics Technology Company Limited,F406.72
  18. Value Engineering in Nanchang International Finance Center Project Applied Research,F832.7
  19. Power Plant EPC Project Risk Management,F284
  20. Research on Promoting Value in TFT-LCM Manufacturing Industry,F426.6
  21. Value Orientation and Values of Engineering Decision in Lager Scale Engineering Project,F284

CLC: > Economic > Economic planning and management > Economic calculation, economic and mathematical methods > Economic and mathematical methods
© 2012 www.DissertationTopic.Net  Mobile