Dissertation > Excellent graduate degree dissertation topics show
The Risk Assessment and Integrity Management of Underground Gas Pipeline of Longgang, Shenzhen
Author: LiuBo
Tutor: JieDongLai
School: South China University of Technology
Course: Chemical Engineering
Keywords: Town gas Integrity management Risk assessment Integrity assessment
CLC: TU996.8
Type: Master's thesis
Year: 2013
Downloads: 31
Quote: 0
Read: Download Dissertation
Abstract
|
Town gas is a significant symbol of modern urban.Pipeline gas brought convenience tomillions of households,simultaneously,underground gas pipeline across the streets of citiesand towns,including densly populated areas,commercial and recidentialareas,etc.Thus,complex situations was caused around the gas pipeline.If an accidentaccurs,the consequences,social impact environmental damage and economic loss will be veryserious.Pipeline integrity management is a series activities of the pipeline managers to ensureintegrity of the pipeline.Specifically, the pipeline managers identification and evaluationconstantly the risk factor which pipeline runs according to the lastest information,and takeappropriate risk mitigation measures continuously,control the risk at a reasonable andacceptable range,achieve the purpose of continuous improvement, ultimately prevention andreduction of pipeline accidents,assurance the safe operation of pipelines economically andlegitimately.The purpose of this project is:by way of the six cycles of integrity management—datacollection、identification of high consequence areas、risk assessment、integrity assessment、repair and maitenance、performance evaluation, analyze and evaluate underground gaspipeline of Longgang distruct,Shenzhen,and implement corrective measures.In order toensure the integrity and intrinsic safety of gas pipeline system.Supply natural gas ofcontinuous、safe and reliable to the user.And does not adversely affect to employees,thepublic,the users or the environment,to achieve the ultimate goal of no accidents running.The main content of this topic is:make use of the theory of pipeline integritymanagement,combined with the actual situation of the gas pipeline of LonggangDistrict,Shenzhen,explore a number of higher feasibility methods to risk assessment of theregion`s underground gas pipeline network.,and initially established integrity managementsystem of underground medium pressure gas pipeline,provides scientific and reasonabletheoretical guidance for safe and stabe operation of the regional gas pipeline network.
|
Related Dissertations
- Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
- The Prediction of Potential Suitable Distributions and Risk Assessment of the Alien Invasive Plant Flaveria Bidentis(L.) in China,S451
- The Research and Construction of Ecological Risk Assessment and Warning Manage System in Typical Oilfield,X826
- Research of Contaminated Site Investigation and Assessment Information System for Soil,X825
- Xinzhou Naoyang Event Risk Management,G852.9
- Students' Survival Training risk management theory and empirical research,G807.4
- Construction of enterprise credit evaluation system,F407.7
- Offshore oil platform construction phase Operational Risk Management Research,F426.22
- Mine water inrush investigation Risk Assessment,TD745
- Chemical Industrial Park Environmental Risk Management Technology Source,X327
- Research on Risk Evalution of Coal Enterprises’ Diversified Management,F426.21
- BOT financing risk assessment method based on fault tree study,F283
- Mine shaft hoisting system security risk assessment study,TD53
- Risk Assessment of FPSO in Off-loading Operation,U698
- Risk Assessment and Decision of the Railway Cuttings in Southwest Mountain Area,U213.12
- Digital Information Resources System Security Risk Assessment,G353.1
- The Establishment and Effectiveness of Financial Risk Assessment Index System of Listed Companies Based on VaR,F832.51;F224
- Comprehensive Evaluation of geological hazard , Qingdao,P694
- Small Amount Government Procurement Risk Assessment and Control,F812.45
- Research on the Evaluation and Model of Apparel Supply Chain Risk for Apparel Manufacturing Enterprises,F274;F224
- A Comparison of the Metabolic Syndrome Score and the Framingham Risk Score for Prediction of Cardiovascular Disease,R589
CLC: > Industrial Technology > Building Science > Municipal Engineering > City gas supply > Gas facilities management, maintenance, overhaul
© 2012 www.DissertationTopic.Net Mobile
|