Dissertation > Excellent graduate degree dissertation topics show
Based on the bill of quantities , construction contract management
Author: XuZhuoHui
Tutor: FuChun;KouGuangXiao
School: Central South University
Course: Project Management
Keywords: BOQ The signing of the contract Contract performance Construction contract management Claimant
CLC: F284
Type: Master's thesis
Year: 2010
Downloads: 397
Quote: 2
Read: Download Dissertation
Abstract
|
Officially launched in China in 2003 the Construction Works list pricing norms ( GB50500 -2003 ) , a preliminary budget from traditional fixed pricing model to the transformation of the mode of the bill of quantities . 2008 released a new construction project BOQ pricing norms \Has a special status and role of contract management in construction project management , from the point of view of the contract to look at the bill of quantities , it is not just the pricing model , valuation procedures and valuation methods change , but the establishment of the buyers and sellers of building products a new kind of contractual relationship will bring a far-reaching impact on the bidding system and engineering contract management system . Therefore, research and practice \From the cost of the project implementation phase formation process analysis , construction contract management is mainly divided into the bidding process, the contract is signed , fulfillment and claims management phases . Firstly , the construction projects BOQ pricing norms \program content and method . Secondly , from the bidding , the contract signed , fulfillment and claims aspects of list price model contract management , and the corresponding countermeasures and suggestions . In short, the reality of our Construction Contract Management proposed by the bill of quantities and contract management mode reform , standardize construction bidding , the contract is signed , to fulfill the system and measures and the claims process .
|
Related Dissertations
- Study on Standardization Scheme of Bill of Quantities System,F284
- Victims’ Right to Claim Japan on the Basis of International Criminal Law,D997.9
- Study on Fast Quoted Price Method under Mode of Bill Quantity Valuation,F284
- The Research on the Control of Owner’s Payment and Settlement,F284
- The Research of Enterprises’ Norm Based on the Detail List Offer,F284
- Comparative Analysis of Quota Valuation Model and BOQ Valuation Model,F284
- Study on the Bidding and Pricing Mechanism Under China’s Current Pricing Model of Bill Quantites,F284
- A Study on the Supervision of the GY Hospital Renovation Project,F284
- On Improving the Engineering Cost Management on the Basis of Bills of Quantities Pricing Standard,F284
- On the psychological contract for the performance of civil servants,D630
- On the New Rural Construction of Socialism Harmonious Society,F320
- Study of the Impact on Psychological Contract to Knowledge Staffs’ Work Performance,F272.92
- Study on the Problems of Tender Without Base Price under the Boq Pricing Mode,F284
- Quick Quote BOQ pricing model theory and method of,F285
- Tender Offer Measurement Based on Risk Analysis of the Subgrade Engineering Study,F284
- BOQ Pricing Mode of Operation Mechanism,F284
- Chinese Administrative Tort Compensation for Moral Damage Studies,D923
- Based on Support Vector Machine Construction Cost Prediction,TU723.3
- BOQ Bidding Decision,F284
- X’s Non-ferrous Alloy in the Project Risk Analysis,F426.32
CLC: > Economic > Economic planning and management > Infrastructure the economy > Organization and management of infrastructure
© 2012 www.DissertationTopic.Net Mobile
|