Dissertation > Excellent graduate degree dissertation topics show

East Northeast Railway Channel Construction Technical Economic Analysis

Author: ShengLi
Tutor: GanLing
School: Southwest Jiaotong University
Course: Traffic and Transportation Engineering
Keywords: The northeast eastern railway channel Railway construction projects Traffic forecast Financial evaluation National Economic Evaluation Comprehensive Evaluation
CLC: U212
Type: Master's thesis
Year: 2009
Downloads: 25
Quote: 0
Read: Download Dissertation

Abstract


With the continuous development of China 's railway industry , railway construction projects is increasing. In order to provide a reliable basis for scientific decision-making , we should continue to summarize and explore effective methods of the railway construction project economic evaluation , and strive to make the program demonstrated results consistent with the actual construction projects , to put an end to the project blindly launched resulting in direct economic losses . The northeast eastern railway channel construction paper first introduces the significance and role in the national economy and the road network on the necessity of the the northeast eastern railway channel construction . The second chapter describes the transport demand analysis of railway construction projects , the supply origin and production of space differences spatial differences in production with consumption , the production capacity of the regional imbalance the different needs of the rail freight market , pointing out that the main factors that affect the demand for rail freight , rail freight , passenger demand forecasting method was introduced , based on predicted northeast eastern Railway channel passenger and freight traffic , and lay a good foundation for good economic evaluation . Followed by financial evaluation and national economic evaluation , financial evaluation , the paper briefly describes the main indicators of the railway construction project operation period cash inflows and cash outflows constitute the main factors and railway construction project financial evaluation , and calculated in north railway channel each evaluation of the new line , the same time the sensitivity analysis ; evaluation of national economy , the article describes the meaning and significance of the railway construction project evaluation of the national economy , discusses the relationship between the national economic evaluation and financial evaluation , the introduction of the national economy evaluation methods , parameters, and evaluation of direct and indirect costs in cost and effective method used in this paper , the direct benefits and indirect benefits made ??further illustrate and calculate the evaluation of the new line of the northeast eastern railway corridor , the sensitivity analysis . Finally, on the northeast eastern railway channel conducted a comprehensive evaluation , to discuss the possibility of other alternative modes of transport , the the northeastern Eastern Railway channel construction social benefits are difficult to quantify the analysis .

Related Dissertations

  1. The Study on Risk Evaluation of BOT Projects in China University,G647
  2. The Application of Fuzzy Comprehensive Evaluation Based on Genetic Algorithm in Vocational Evaluation of Classroom Teaching,G712
  3. Comprehensive Quality Assessment of College Students,G645.5
  4. A Comprehensive Evaluation of Heritage Trees,S788
  5. Comprehensive Evaluation of Safety Production and Optimization of Safety for Yangcheng Coal Mine,X936
  6. On the Program for Evaluating and Cultivating the Core Competitiveness of GY University Press,G239.22
  7. Social insurance agencies risk prevention research,F842.6
  8. Research on Construction Project Schedule Planning Based on Uncertain Factors,TU722
  9. Evaluation and Optimization of Comprehensive Disaster-Prevention System in Lianshan, Huludao,TU984.116
  10. Study on Circular Economy Assessment in Plan Environmental Impact Assessment of Coal-mining Area,F426.21
  11. Economic Evaluation of Chengdu to Chongqing PDL Base on Railway Network System,U212.1
  12. Safety Assessment of Coal Gangue Hazard and Analysis of the Greening Reclamation,TD849.5
  13. The Study of Stability and Deformation for Cao Mao Mountain Tunnel,U451.2
  14. Research on Assessment of Risk of Strategy and Comprehensive Evaluation of Risk Management of Strategy,F272
  15. Research and Application Based on Location and Path Optimization of Emergency Logistics Systems,F252
  16. Risk assessment methods in the oil overseas oil and gas exploration projects,F224
  17. Study on Safety Comprehensive Assessment of Hydro-Power Construction Sites,TV513
  18. SGD company ERP software vendor selection research,F270.7
  19. China - ASEAN Free Trade Area of Guangxi Agricultural Mechanization and Countermeasures,F752.7;F224
  20. Import and export of food risk management systems research, design and development,F752.6
  21. Research on the Evaluation of Technology Innovation Ability and Efficiency of Equipment Manufacturing Industry of Hebei Province,F426.4;F273.1

CLC: > Transportation > Rail transport > Railway Line Project > Line planning, surveying and design
© 2012 www.DissertationTopic.Net  Mobile