The Comprehensive Analysis and Management of the Risks in the Freeway Project Company under BOT Mode
Author: LiTong
Tutor: SuWeiGuo;ZhangWenZhong
School: South China University of Technology
Course: Architecture and Civil Engineering
Keywords: management project sponsors Freeway
CLC: F283
Type: Master's thesis
Year: 2011
Downloads: 84
Quote: 0
Read: Download Dissertation
Abstract
|
BOT (Build-Operate-Transfer) is the project finance mode which the government and the project sponsors signed the chartered agreement to grant the concession, thereafter, the project sponsors are awarded the concession from the public sector to establish a project company to finance, design, construct, and operate a infrastructure facility stated in the concession contract. Due to the arrangement, the fees are usually raised by the project sponsors during the concession period, allowing the sponsors to reach a satisfactory internal rate of return for its investment. Generally speaking, such projects provide for the infrastructure to be transferred to the government at the end of the concession period. The BOT mode can control the investment scale of the project effectively, regulate the government acts and improve the management level of the free way. The BOT mode currently finds little application in the infrastructure projects in China, which still develops in its beginning stage. The freeway is a large scale project, with complex structures, long construction period and concession period. The maintenance cost of the freeway project is relatively low but with a high debt interests. Therefore, the risk is the key problem for the free way to finance with the help of the BOT mode.This study combined both the theories and practices, discussing the background, the purpose and meaning of the study and introducing the research status of the risk management both home and abroad at the beginning. Then, the definition and the management procedures of the BOT mode were introduced, and all kinds of risks for the construction of the freeway project under the BOT mode were analyzed. Takes the Huizhou Guanghe Freeway Ltd and its BOT mode project as example, all kinds of management methods in the construction process were introduced. The characteristics of the risk management and some concrete measures were summarized in the construction process of the freeway under the BOT mode, which may provides some references and guides for the application of the comprehensive risk management in similar projects in the future. This study also hopes to promote the application of the comprehensive risk management in the freeway projects under BOT mode.
|
Related Dissertations
- Empirical Study on the Top Management Turnover and Performance of Listed Companies in China,F224
- Research on Transparent Security of JPEG Image,TP391.41
- Multiple Pairwise Keys Management Protocol of Function Node-Based for Wireless Sensor Networks,TP212.9
- Study on Development Risk Analysis and Management of Urban Commercial Residence,F293.35
- XD upholstered furniture business strategy,F272
- Study on Student Management of Rural Boarding School in China,G471
- The Research on Mixed-age Regional Activities Management of Kindergarten,G617
- A Study on Curriculum Management in Applied Universities,G642.3
- On Civilian-run Colleges and Universities Issue and Its Internal Management System to Improve,G647
- Xinjiang Oilfield Ground Construction Cost Indicators and Management Information System Study and Application,F284
- Grass-roots forces the day-to-day management of information systems design and implementation,TP311.52
- Design and Implementation of the military material procurement and supply management system,TP311.52
- Quanzhou Private Colleges Human Resource Management,G648.7
- Subarea Management of Tobacco Soil Nutrients and Adequate Fertilization Research by Micro Scale,S158
- Non - profit organizations - Perth (PATH) project in China Development Strategy,F272
- Development and Application of Primary and Secondary School Teachers’ Impression Management Tactics Questionnaire,G632.4
- Management System Design and Implementation of troop strength,TP311.52
- The Research about College Classroom Management in Perspective of Conflict Management,G647
- Study on the Management Strategy of University’s Brand,G647
- The Evolution of Chinese Corporate Archives Management System,G275.9
- The Research of Enterprise-enviromental Cost Management,F275.3
CLC: > Economic > Economic planning and management > Infrastructure the economy > Infrastructure investment and economic benefits
© 2012 www.DissertationTopic.Net Mobile
|