Dissertation > Excellent graduate degree dissertation topics show
Equipment manufacturing enterprise supply chain risk management
Author: GengPeiPei
Tutor: HuiNing
School: Northwestern University
Course: Business management
Keywords: Supply Chain Risk Management Risk Identification Risk Assessment Risk control Equipment manufacturing
CLC: F274
Type: Master's thesis
Year: 2011
Downloads: 202
Quote: 0
Read: Download Dissertation
Abstract
|
Supply chain as the new forms of cooperation between the modern enterprise competition in the globalized economy and the impact of the information age , is facing a huge risk of inefficient or interruption . The unique characteristics of the equipment manufacturing enterprises determine the complex structure of the supply chain and high-risk sex . In this paper questionnaires , factor analysis , fuzzy mathematical theory , Failure Mode Effect and Criticality law and MAS technology equipment manufacturing enterprises in the supply chain risk identification , evaluation and control , so as to minimize the risk of supply chain to protect its stable and efficient operation of purpose . In this paper, on the basis of a large number of domestic and foreign literature review around the equipment manufacturing enterprise supply chain risk management study the following three questions . Equipment manufacturing enterprise supply chain risk identification , based on literature and business interviews , combined with the characteristics of the equipment manufacturing enterprises assume that risk factors finalized nine risk factors and 32 risk variables , completion risk , through questionnaires and factor analysis identification ; equipment manufacturing enterprise supply chain risk assessment , risk identification based on the first use of the two fuzzy comprehensive evaluation method to determine the fuzzy evaluation matrix , and then through the FMECA method to determine the risk index weight and eventually obtained the equipment manufacturing enterprise supply chain overall risk value of the level of value and risk level of the nine risk factors , and the results were analyzed Help ; equipment enterprise supply chain risk control , the use of MAS technology , the establishment of the equipment manufacturing enterprise supply chain risk warning and treatment decision support system model for the conduct of always risk control . In this paper, the characteristics of the equipment manufacturing enterprise supply chain identified nine risk factors and 32 risk variables , and calculated the level of risk of the equipment manufacturing enterprise supply chain overall risk and nine risk factors , and finally to apply computer technology to supply which the chain risk control management , the proposed risk early warning and treatment decision support system based on MAS model. In order to achieve effective management of the equipment manufacturing enterprise supply chain risk through risk identification , evaluation and control .
|
Related Dissertations
- Health Risk Assessment of a Brownfield Contaminated by Volatile Chlorinated Hydrocarbons and Study on Screening of Remediation Technique,X820.4
- Health-based and Ecological Risk Assessment of Contaminated Sites,X820.4
- Open pit production accidents studied because of the risk management measures,TD771
- Drought Risk Analysis of Dazhen Irrigated Area,S423
- The Prediction of Potential Suitable Distributions and Risk Assessment of the Alien Invasive Plant Flaveria Bidentis(L.) in China,S451
- Biotypes of Bemisia Tabaci and Resistance Risk Assessment on B Biotype to Pyriproxyfen in XinJiang,S433
- The Workout of Atmospheric Environmental Risk Prediction Software,TP311.52
- The Heavy Metals Distribution Characteristics and Risky Evaluations of Farmland Soils-Crops Around Different Types of Chemical Industrial Park,X833
- Research on Safety Production of Shenzhen Power Supply Bureau,TM08
- The Research and Construction of Ecological Risk Assessment and Warning Manage System in Typical Oilfield,X826
- Research of Contaminated Site Investigation and Assessment Information System for Soil,X825
- Risk Assessment & Spatial Distribution of Soil Nutrients and Heavy Metal in Fenhe Reservoir Surrounding,S158
- Xinzhou Naoyang Event Risk Management,G852.9
- Students' Survival Training risk management theory and empirical research,G807.4
- Offshore oil platform construction phase Operational Risk Management Research,F426.22
- Mine water inrush investigation Risk Assessment,TD745
- Jizhong Energy AG mine safety risk control management system research,X936
- Chemical Industrial Park Environmental Risk Management Technology Source,X327
- Publishing credit Credit Risk Control Problem,G231-F
- The Research of Pledge Supervision Risk Control in Inventory Financing,F259.27
- BOT financing risk assessment method based on fault tree study,F283
CLC: > Economic > Economic planning and management > Enterprise economy > Enterprise Marketing Management
© 2012 www.DissertationTopic.Net Mobile
|