Dissertation > Excellent graduate degree dissertation topics show

Study on Project Management of Power Transmission and Transformation Project in Permafrost Plateau

Author: ZhangXiaoYang
Tutor: WuYunNa;LangFuTang
School: North China Electric Power University (Beijing)
Course: Project Management
Keywords: Construction Project Management Goal-oriented Transmission Project Plateau permafrost
CLC: F426.61
Type: Master's thesis
Year: 2011
Downloads: 54
Quote: 0
Read: Download Dissertation

Abstract


Power engineering construction plays an important role in the development of the national economy , with the gradual implementation of the country's western development strategy , the state has also stepped up efforts to western investment in the construction of the high-voltage grid architecture . Western construction of the transmission line project , to alleviate the situation of power shortage in China's western region to speed up the western development strategy , and to improve the standard of living of the people of the western region is of great significance . However , the construction of transmission lines in the west , facing plateau permafrost and harsh construction environment , the construction of the transmission line project in the permafrost environment with high technical requirements of construction , the harsh construction environment , the goal of the project require high construction project management much more difficult . In order to protect the transmission line project to meet the expectations of the overall objective to achieve the quality of the project , the harmonization of progress , environmental protection and safety , cost objectives , the paper will be based on goal -oriented project management methodology is applied to the transmission line project in plateau permafrost , combined with the Qinghai-Tibet ± 400kV DC transmission line project instance empirical research . On the basis of analysis of the content and features of the permafrost construction engineering tasks in accordance with the goal of multi-level decomposition , summed up the process of management by objectives . Development of construction management at all levels of the target decomposition target plan to identify each target critical control points , identify the goal of the project completion risk , develop target control measures . Then, set up by the participating parties target control organizational structure , top to bottom, the implementation of the objectives of the responsibility to ensure that the target is from the bottom to the successful completion . Last regularly target completion of the performance evaluation and summarize , and to promote the continuous improvement of the management of the follow-up target . This selection of China 's Qinghai-Tibet ± 400kV DC transmission line construction project management method as a case study and conduct research on a number of technical experts and managers , raises the issue of technology to the global target management issues , and discussed in detail . Identified control point for each goal , develop a realistic target security system and demonstrate the effectiveness of the method based on goal -oriented project management , construction practices , for grid construction management of plateau permafrost environment provides important reference.

Related Dissertations

  1. The Criticism on S-O-R Model and the Research on Anticipation Effect,B841
  2. Multi-Objective Optimization Research on Construction Project Management,TU71
  3. The Impact of Performance Appraisal Orientation on Information Ethics Behavior,F224
  4. Research on Daqing a Highway Construction Project Cost Management,F542
  5. Study on the Cost Management of Transmission Line Construction Project,F426.61
  6. The Design of 220kV Tianjin South Traction Substation for Beijing-Shanghai High-speed Railway,TM922.4
  7. Good planning and control system of small and medium cities Method of,TU984
  8. Based generative goal-oriented design of online courses,G434
  9. A Research about the Project Management of Wuhan Engineering Test Section in Wuhan Passenger Dedicated Line,F532
  10. Design and implementation of communication construction enterprise project management information platform,TP311.52
  11. English Academic Emotions and It’s Influential Factors of Junior Middle School,G633.41
  12. Transmission Engineering and Water Conservation Monitoring Method,S157
  13. Research on Economic Post Evaluation of Tiebanjing 110KV Power Transmission Project,F224;TM73
  14. Engineering Feasibility Research of 220KV Power Transmission of North Xinghua,TM76
  15. Research on Anci 500kV Substation Construction Quality Management,F426.61
  16. The Risk Assessment of Sanguikou 110KV Transmission Project Based on Grey Theory,F426.61;F224
  17. Research on Project Management Maturity Model for Capital Construction in Colleges and Universities,G647.5
  18. The Research of the Project Management in the Management of Forestation Construction of JTY Forestry Company,F326.2
  19. The Planning and Controlling Management of AISC Bayuquan Steel Project,F426.31
  20. Based on SDA architecture construction industry project management applied research,TP311.52

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile