Dissertation > Excellent graduate degree dissertation topics show
Study on Project Management of Power Transmission and Transformation Project in Permafrost Plateau
Author: ZhangXiaoYang
Tutor: WuYunNa;LangFuTang
School: North China Electric Power University (Beijing)
Course: Project Management
Keywords: Construction Project Management Goal-oriented Transmission Project Plateau permafrost
CLC: F426.61
Type: Master's thesis
Year: 2011
Downloads: 54
Quote: 0
Read: Download Dissertation
Abstract
|
Power engineering construction plays an important role in the development of the national economy , with the gradual implementation of the country's western development strategy , the state has also stepped up efforts to western investment in the construction of the high-voltage grid architecture . Western construction of the transmission line project , to alleviate the situation of power shortage in China's western region to speed up the western development strategy , and to improve the standard of living of the people of the western region is of great significance . However , the construction of transmission lines in the west , facing plateau permafrost and harsh construction environment , the construction of the transmission line project in the permafrost environment with high technical requirements of construction , the harsh construction environment , the goal of the project require high construction project management much more difficult . In order to protect the transmission line project to meet the expectations of the overall objective to achieve the quality of the project , the harmonization of progress , environmental protection and safety , cost objectives , the paper will be based on goal -oriented project management methodology is applied to the transmission line project in plateau permafrost , combined with the Qinghai-Tibet ± 400kV DC transmission line project instance empirical research . On the basis of analysis of the content and features of the permafrost construction engineering tasks in accordance with the goal of multi-level decomposition , summed up the process of management by objectives . Development of construction management at all levels of the target decomposition target plan to identify each target critical control points , identify the goal of the project completion risk , develop target control measures . Then, set up by the participating parties target control organizational structure , top to bottom, the implementation of the objectives of the responsibility to ensure that the target is from the bottom to the successful completion . Last regularly target completion of the performance evaluation and summarize , and to promote the continuous improvement of the management of the follow-up target . This selection of China 's Qinghai-Tibet ± 400kV DC transmission line construction project management method as a case study and conduct research on a number of technical experts and managers , raises the issue of technology to the global target management issues , and discussed in detail . Identified control point for each goal , develop a realistic target security system and demonstrate the effectiveness of the method based on goal -oriented project management , construction practices , for grid construction management of plateau permafrost environment provides important reference.
|
Related Dissertations
- The Criticism on S-O-R Model and the Research on Anticipation Effect,B841
- Multi-Objective Optimization Research on Construction Project Management,TU71
- The Impact of Performance Appraisal Orientation on Information Ethics Behavior,F224
- Research on Daqing a Highway Construction Project Cost Management,F542
- Study on the Cost Management of Transmission Line Construction Project,F426.61
- The Design of 220kV Tianjin South Traction Substation for Beijing-Shanghai High-speed Railway,TM922.4
- Good planning and control system of small and medium cities Method of,TU984
- Based generative goal-oriented design of online courses,G434
- A Research about the Project Management of Wuhan Engineering Test Section in Wuhan Passenger Dedicated Line,F532
- Design and implementation of communication construction enterprise project management information platform,TP311.52
- English Academic Emotions and It’s Influential Factors of Junior Middle School,G633.41
- Transmission Engineering and Water Conservation Monitoring Method,S157
- Research on Economic Post Evaluation of Tiebanjing 110KV Power Transmission Project,F224;TM73
- Engineering Feasibility Research of 220KV Power Transmission of North Xinghua,TM76
- Research on Anci 500kV Substation Construction Quality Management,F426.61
- The Risk Assessment of Sanguikou 110KV Transmission Project Based on Grey Theory,F426.61;F224
- Research on Project Management Maturity Model for Capital Construction in Colleges and Universities,G647.5
- The Research of the Project Management in the Management of Forestation Construction of JTY Forestry Company,F326.2
- The Planning and Controlling Management of AISC Bayuquan Steel Project,F426.31
- Based on SDA architecture construction industry project management applied research,TP311.52
CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net Mobile
|