Dongfeng Fengshen H30 Cross models project scope and schedule management research

Author: CuiJunHui
Tutor: LuYaoBin
School: Huazhong University of Science and Technology
Course: Business Administration
Keywords: H30 Cross models Project Scope Management Project Schedule Management
CLC: F426.471
Type: Master's thesis
Year: 2011
Downloads: 40
Quote: 0
Read: Download Dissertation

Abstract


In recent years , as China's automobile industry increasingly fierce market competition , automobile manufacturing enterprises have to rely heavily on research and development of new products to respond to market competition . Currently, the world's major automobile manufacturers automotive new product development projects have adopted modern management methods , to shorten product development cycles, reduce costs and improve the competitiveness of enterprises . This paper analyzes the domestic car market environment and the characteristics of the current market demand and the development of such models , analyzes the automobile manufacturing enterprises in the new product development process using project management methods , focusing on the brand of Dongfeng Fengshen H30 Cross models of project scope process management and schedule management , project deliverables for vehicle control , vehicle project work breakdown structure (WBS), critical path , scope control methods and preparation of the project schedule , tracking and control for an active exploration and practice. In the last article for a detailed summary of the project in order to follow-up model of project management project to provide reference .

Related Dissertations

  1. Based on the project scope management of enterprise business process optimization studies,F426.6
  2. Research on the Project Schedule Management Based on the Critical Chain,TH186
  3. Application and Study of Project Management for the Date Center Intergrated System Project of Shenzhen Airport,F562
  4. Time schedule management in the broadcast monitoring platform construction in the applied research,G221
  5. Anshan Bus Company’s ERP Project Progress Management,F572.88
  6. Project Time Management Theory Application in Power Plant Information System,F426.61
  7. Schedule Management of M Road Project in W Corporation,U415.2
  8. Taishan Power Transmission Project Information Research Progress Management System,F283
  9. The Scope Management of PHS Network Reform Projects in China,F626
  10. Research on Schedule Management of Beijing Olympic Transport Service Vehicle GPS Monitor and Control System Project,F572
  11. Study on Wastewater Treatment BOT Schedule Control Based on Critical Chain,F283
  12. Reflections of Beijing University of Posts and Telecommunications, Digital Campus \,TP393.18
  13. Datang Changshan Power Plant Expansion Project Schedule and Control,F426.61
  14. Application and Research of the PERT Technology in Project Schedule Management Based on WEB,TP393.09
  15. China Mobile Risk Assessment project schedule management research,F626
  16. Research and Implement of Dynamic CPM Optimal Algorithm Based on Constraints,F282
  17. The Applied Research of Critical Chain Management in the Progress of the Project Management Control Based on the TOC,F281
  18. The Project of Long-Distance Exchange Network Management System Expansion in the Scope Management,F623
  19. Research on Time Optimization of Control of the Project about the Making and Contrating of Box Beam of He-Ning Railway Engineering,U213.1
  20. The Research of Project Schedule Management Based on the Knowledge Base,TP392

CLC: > Economic > Industrial economy > China Industrial Economy > Industrial sector economy
© 2012 www.DissertationTopic.Net  Mobile